READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — March 18, 2013 — Okaloosa 2013 Federal Legislative Issues and Priorities — reading text
Part 1 of 1. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — 89-Okaloosa 2013 Federal Legislative Issues and Priorities.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
Federal Legislative Issues
• Support efforts by the congressional delegation to oppose/mitigate impacts of the
EPA Numeric Nutrient Criteria and mercury levels.
• We request that the US Army Corps of Engineers’ Section 219 grant program be
redefined to allow the funding of projects that both parties in the US Congress
currently have agreed to be considered as earmarks. The Future Water Supply
program is one example of a project that may benefit in the future from Section
219 funding, but currently can’t because it would be considered an earmark.
Federal Funding Issues
• Support funding for the construction of the main entrance road at Bob Sikes
Airport.
• Request $4 million to upgrade Hare Street with curb, gutter, associated drainage
and paving. Road serves as a southern access corridor from US Hwy 90 to the
Bob Sikes Airport.
• Request $10 million to advance construction of the south segment of PJ Adams
with roadway improvements (2 lane to 4 lane) from SR 85S to Wildhorse Drive.
• Support funding of the Destin Airport Air Traffic Control Tower.
• Request $2.5 million to convert Fairchild Road from the existing dirt road to a
paved road with widened shoulders for stormwater management. Road serves as
the primary north access point from Airport Road to Bob Sikes Airport.
• Request $20 million to advance construction of the south segment of SR123 with
roadway improvements (2 lane to 4 lane) from north of SR85S to north of Toms
Creek.
• Support funding of Reclaim Water Opportunities. With the new state-of-the-art
Arbennie Pritchett Water Reclamation Facility in operation, we have the ability to
supply reclaim water by adding a filter and transmission piping. Future
opportunities exist to send reclaim water to Eglin, the Niceville Service Area, etc;
however, funding is needed for these projects