READ ALONGSIDE THE SOURCE

Okaloosa County Tourist Development Council — August 8, 2013 — reading text

Part 3 of 8. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — 01-Agenda Packet.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

Original $ Approved $ Operating Expenses 16,453 74,466 218,740 218,740 Capital Outlay 0 97,577 393,000 75,000 Grants & Aids 0 36,900 90,000 75,000 Reserves 0 0 33,260 0 Total 16,453 208,943 735,000 368,740 HISTORICAL STAFFING SUMMARY: Category FY11 FY12 FY13 FY14 Full-time* 0 0 0 0 Part-Time 0 0 0 0 Relief 0 0 0 0 Total 0 0 0 0 ∗No personal services are included in this fund. Staffing needs are provided by County and Unincorporated County Parks. Packet Pg. 15 MAJOR ACCOMPLISHMENTS LAST YEAR:  Removal of 3 Derelict Vessels for County waters.  Prepared Project Agreement with the Town of Cinco Bayou for Seaway Boat Ramp access repairs.  Prepared Project Agreement with the City of Valparaiso for facility improvements at Lincoln Park.  Installed new boat ramp at Shoal River Park (Hwy 85 South).  Removed rotten portions of boat dock and replaced with new pilings and supports at Marler Park.  Installed sewage grinder pump and connected to county sewer (old septic tank failure).  Installed 79 new No Wake and Idle Speed Zone signs and 33 new pilings in Destin Harbor and Crab Island.  Installed 8 new pilings and 8 new No Wake and Idle Speed Zone signs in Cinco Bayou, east of bridge. PROGRAM GOAL: To provide construction, maintenance and customer services at County Boat Ramps. KEY OBJECTIVES: 7. Provide structurally sound and safe facilities for all County boat ramps. 8. Provide clean, accessible restroom facilities where practicable. 9. Provide ADA compliant accessibility to parks. 10. Maintain boat ramp park grounds with regularly scheduled mowing and trash removal. 11. Provide timely and courteous assistance to citizens. 12. Provide construction services at greatly reduced cost compared to contracting design and build services. 13. Maintain boat ramps with regularly sand removal. 14. Maintain all docks and piers by regular inspections, replace or repair loose or rotten boards PERFORMANCE MEASURES: Actual Estimated Adopted Performance Measures FY11/12 FY12/13 FY13/14 Number of Full-Time Equivalents (FTEs) 0 0 0 Input Operating Expenditures $196,880 $ $ New Construction (grants and local match) 0 0 0 Boat Ramps Maintained (facility repairs, boat ramps dredged) 15 15 15 Output Boat Ramps Improved (construction, renovation) 0 1 0 Derelict Vessels removed (FWC authorized) 0 10 3 Resources personnel trained on equipment to dredge boat ramp 5 5 5 Efficiency Average response time to boat ramp dredge request (days) 5 5 5 Effectiveness Project Agreements with municipalities 3 2 2 Boating Restricted Zone (sign repair/install) 29 0 87 Packet Pg. 16 COUNTY PARKS GENERAL FUND IMPACT $1,400,000 $1,231,309 County Parks General Fund $1,222,830 Impact $1,200,000 TDD Contribution $1,031,421 $1,000,000 $800,000 $641,198 $635,400 $600,000 $666,527 TDD -$428,126 TDD - $411,797 $400,000 $200,000 $150,023 $202,956 $- 2007 2008 2009 2010 2011 2012 2013 2014 Packet Pg. 17 UNINCORPORATED PARKS - MSTU $5,000,000 $4,675,333 $4,500,000 $4,241,108 $4,000,000 $3,500,000 $3,000,000 Cash Reserves $2,500,000 Annual Revenue $2,117,949 $2,000,000 Operational Budget $1,398,564 $1,213,773 $1,500,000 $1,729,535 $1,000,000 $1,119,745 $1,064,966 $900,703 $500,000 $- 2007 2008 2009 2010 2011 2012 2013 Packet Pg. 18 AGE OF MOWERS 6% 1 Mower - 3 years old 29% 4 Mowers - 4 to 5 years old 50% 2 Mowers - 6 to 9 years old 7 Mowers - 10 or more years old 14% Packet Pg. 19 COUNTY/UNINC PARKS MAJOR ACCOMPLISHMENTS LAST YEAR Marler Park – Removed 120 linear feet of decayed dock Okaloosa Island – Removed, re-worked all irrigation pumps and motors Don and Susan Stillwell Park –Installed irrigation pipe and sprinkler heads, constructed concrete sidewalk, basketball court, park lighting, constructed pavilions and wood boardwalk, installed chain link fence Laurel Hill Park (Hwy 393) – Installed wood rail fence, cleared area across wetlands, installed 24 – 8x8 pilings (with assistance from Bridge Crew) for the construction of a walk bridge Shoal River Park and Boat Ramp – Removed old boat ramp and installed new concrete ramp, installed a new sewage grinder pump and tied restroom to sewer system (septic tank no longer functioned). Packet Pg. 20 KEY OBJECTIVES FOR FY14: Don Stillwell Ph IV – Bounded play structure, mini splash pad Laurel Hill/Dorcas Park – Improvements east of creek across new walk path Wilderness Landing – Parking for camping, electric service, water, establish primitive camping area sites Proposed new Park in Holt – Agreement with the Holt Volunteer Fire Department to develop park on Fire Department property Proposed new Park in Silver Oaks Subdivision – BCC approved Lake Silver Improvements – Pavilions, irrigation, and walking path Greenways and Trails – Agreement with the Florida Department of Transportation for a portion of the old railroad right-of-way along Highway 85 North Choctawmar Park – Fencing and improvements to existing trail to park. Veterans Park – Development of park Marler Park – Additional boat trailer parking and new access road to boat ramp Packet Pg. 21 Packet Pg. 22 Packet Pg. 23 Packet Pg. 24 Packet Pg. 25 Packet Pg. 26 BOARD OF COUNTY COMMISSIONERS AGENDA REQUEST DATE: August 8, 2013 TO: Honorable Chairman and Members of the Board FROM: Ernie Padgett, County Administrator SUBJECT: Agriculture/Extension Office The attached documents provide the Program Based Budget & a presentation for the Agriculture/Extension Office. Packet Pg. 27 BOARD OF COUNTY COMMISSIONERS OKALOOSA COUNTY, FLORIDA SERVICE AREA: PHYSICAL ENVIRONMENT DEPARTMENT/PROGRAM: EXTENSION SERVICE PROGRAM DESCRIPTION: Okaloosa County Extension Service develops and delivers research-based educational programs, workshops, newsletters and publications in the areas of agriculture/small farms, family and consumer sciences, horticulture, natural resources, marine science, and 4-H/youth development. The nationwide informal educational network links experts and resources at federal, state and local levels. Local advisory committees provide guidance and recommendations for programming based on local community needs. Programs in Agriculture/Small Farms/Natural Resources focus on agriculture profitability and the sustainable use of environmental resources for the larger commercial operations as well as those smaller farms with more limited available resources. Family and Consumer Sciences programming involves food, nutrition, health, food safety, family finance, community prosperity, and housing. Home and Commercial Horticulture programs include training of Master Gardeners and development of Best Management Practices for the benefit of the environment for all county residents. With increased urbanization and growth come increased pressures on our coastal ecosystems. Balancing population needs while conserving our natural resources is one of the major goals of Okaloosa County’s Sea Grant and Natural Resources Extension program. 4-H clubs develop youth leadership, character, and good citizenship. Projects and programs focus on a wide array of youth interests REVENUE: Extension Service is funded within the General Fund and two partners-federal and state. Federal and state partners provided $511,824 to support the Extension Office during FY12/13. In addition, local Extension agents secured $1,048,847 through grants, in-kind services and monetary donations. For every dollar of General Fund contribution provided to Ag Extension, over $5.08 was obtained from other sources. EXPENDITURES: Expenditures Budget FY11 FY12 FY13 FY14 Category Actual $ Actual $ Original $ Approved $ Personal Services 366,967 254,111 267,989 285,369 Operating Expenses

Download this text file with its original spacing ↓