READ ALONGSIDE THE SOURCE
Fort Walton Beach Council agenda — 06-24-03 regular Council agenda — reading text
Part 39 of 87. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-9740-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
.
6. The comments of the Chief Engineering Technician cb.rted 1/ 31/ 2003 are hereby
incorporated as conditions of approval, (see attached memo from Nancy McDonald). .
7. The applicant shall provide a public sidewalk along Brooks Street in accordance with
Sec. 20- 755 of the LDC; any necessary easement required by the City for the sidewalk
shall be reviewed and approved by the Public Works Department .prior to the issuance of
a Certificate of Occupancy for the first unit.
2 of 3-
8. All infrastructure including roadways and. uti1ities shall be in place prior to the issuance
of a Certificate of Occupancy for the first unit. A completi~n bond shall be required prior
to the issuance of permits for any infrastructure improvements upon tbe site. . .
9 ~ The conlo€mi;num association documents shall be reviewed and approved by the City'
Attom~ y and CDS staff prior to the issuance' of a Certificate of Occupancy, and shall
provide guarantees for continued maintenance of all common areas. The condominium
documents shall. include archit~ a1 regulations for the development stipulating all
exterior materials, proportions, building placement and residential site improvements.
10. The measurement oftbe required 5<Y ft. rear yard setback along Santa Rosa Sound shall
be verified and indicated on the site plan prior to the issuance ofa building permit for the
first unit.
11. The required density bemuses shall be-identified and approved by the CRA Board prior to
review of the development 'by the City Council. (Complete: the development will utilize
paving treatments" and '~ derground utilities" for the.required density bonuses).
12. An archaeologica.l survey of the property shall be submitted to the City for review prior
to the issuance ofa building permit. .
13. Concurrency documentation shall be submitted and approved by city staff prior to the
issuance of a puilding permit.
In addition to the above and in order to clarify specific issues while addressing concerns of the
adjacent property owners, CDS staff reccommend City 'Council approval with the following
additional conditions: .
14. There shall be 00 encroachments into any view canidar as required by Sec. 695 (b).
20...
15. Back-up aisles for 900 parking spaces sha.1l be a minimum of 24 feet in width.
16. Two-way driveways shall be a minimum of20 feet in width. .
17. A five foot ( 5 ft.) wide landscape strip shall be required between any vehicular use area
VUA), parking space or driveway and a side property line.
18. The development shall comply with the Florida Accessibility Code, as required.
ATTACHMENTS:
Staff Anal
. ysis and Report with:
1. Building Official memo dated 4/29/ 03
2. Chief Technician Engineering memo dated 1/ 31/03
3. Fire Marshall memo dated 4/25/ 03
4. Zoning memo dated 4/29/ 03
5. Exhibit A - Location Map.
6. Exhibit B - Smrounding Zoning Districts.
7. Exhibit C- Surrounding Future Land Use categories.
8. Exhibit D - Surrounding land uses.
9. Application and request for site plan review.
10. Site ~ floor plan,typical cross section of5- unit building.
11. Minutes CRA meeting of 5/7/ 03
ce. City Attorney
Blinn Van Mater, AIA
C:\MTM.\
03..o2- rerec.RSmemo
3 of 3-
CITY OF FORT WALTON ~ EACH
COM1\WNITY DEVELOPMENT SERVICES
DEPARTMENT
PLANNING AND ZONING DIVISION
STAFF ANALYSIS AND REPORT
COMMUNITY REDEVELOPMENT PROJECT AREA
Subject: 238-
144 Brooks Street SE;
Request for Site Plan Approval
Prepared by: MalcolmR AICP. Supervisor Zoning & Building
Foley,.
REPORT DATE REVISION
DATE
P&z Staff Analysis 4- 29- 03
MPB N/A
CRA 5- 7- 03
City Council TBD
L GENERAL BACKGROUND INFORMATION:
A. Applicant lDfGrmation:
1. Property Owner: MTM Development,LLC
2. Applicant: Same as above
3. Developer: Same as above
4. . Architect Blinn Van Mater, AIA
B. Project Location:
1. Location: 238- 244 Brooks Street ~ ( see Exhibit A).
2. Major Access: Miracle Strip Parkway (US 98/ SR 30).
3. Local Access: Brooks Street SE. .
C. General features of the
proposed project:
1. Gross acreage: 3.45 acres.
2. N11:1Ilber of residential units: 43 units ( 12.43 gupa).
3. Height ofproposed building(s): 3- stories; 35 ft. ftom average grad~ to the ceiling of
the highest story. .
D. . ClliTent zoning oftbe appHcantts property (see Exln1>
it A):
MUW- 12, Mixed-Use WaternontDistrict
E. CUlTent SWToWlmng zoning ( see Exhibit B):
North: DR- 3 Neighborhood Residential District. R- l Single Family Residential
District and R-2 Multiple Family
Dwelling District
South: N/A (Santa Rosa Sound)
East: . ' MUW -12 Mixed- Use Waterfront District
West: MOW -18 Mlxed-U se Waterfront District
1
F. Directions-The Comurehensive Plan of the Citv ofFon Walton Beach:
2008 Ftrtui-e
Land Use Designation:
The Comprehensive Plan designates the l~
property as MUW...Water:&
ont Residential.
G. Surrounding land use designations ( see Exhibit C):
The surrounding designations are as follows:
North: LDR Low Density and MDR Medium
Density Residential
South: N/A (Santa Rosa Sound)
East: MUW- 12, :Mixed- use Waterfront ( 12 gross units
per acre)
West: MUW- 18, Mixed-Use Waterftont ( 18
gupa)
H. Surrounding land uses ( see Exhibit D):
The surrounding land uses include
single-fiunily detached, single-family attached
toWDhome and multi- family buildings. Tbe
Camp Walton Village condominium complex is
immediately adjacent west ofthe subject and is comprised ofsimilar buildings with 3 floors
of habitable space ( 6 units per
building) over one level of parking. A similar development
Watermark Condominiums) has already been approved by the
City Council ~ is located
immediately to the east of the subject.. The north side ofBrooks Street is primarily single-
family dwellings although small townhome and ap&.i bent complexes are intermingled
throughout the immediate neighborhood.. . . . . .
n.PROJECT DESCRIPTION:
The proposed project consists of the consolidation of three
abutting parcels of property in order to
develop a residential mixed-use condominium project comprised of a total of 43 residences, made up of
single unit,two unit and multiple unit buildings. The project will be developed as a condominium,with a
homeoWner' s association that will own and maintain the
property. . .
Five (5)multiple unit~ ding&5 (units each) and a
Rosa Sound, with each typical 5- unit
duplex (total of27 units) will be built adjacent to Santa
building consisting of three habitable floors over one level ofbelow
grade parking. The width.ofthese 3- story buildings would be 78 feet with a height of35 ft. from
average
grade. The remaining 16 Units ( 8 single unit, 1 duplex and 2 triplexes) will front on Brooks Street or the
interior private drive. The private drive will
provide two (2) access points onto Brooks Street and a cul-
de- sac at the westerly portion of the site.. .
The unit floor plans and elevations have not been firialized: the
floor plans available, which will be customiZed for each individual
developer Will have a number of different
buyer. The .site plan shows the
prelimin1try foo~ of all
st r uC!
W es
' on the site,wi~ the fo~ of each individua1.
buil~ to b~ cally
confonn to the desIgnated footpnnt. Each structure will be reVIewed for final
compliance With applicable
codes, ie, setbacks, flood elevation, fire
separation, etc., at the time of each individual building permit.
It is anticipated that all of the
building~ in the development will have wood- frame construction,but the
exterior design has not been submitted. The roof materials have not beenl identified.
In regards to the phasing of the project, it is
projected that all infrastructure for the will be
installed shortly after approval, with sales and construction of the waterfront units development
to be commenced first.
The construction of the upland units will follow
shortly thereafter, The landscaping will follow this
generaJized schedule ( see notes on site plan).
