400
Curb and gutter
Sy $ 24. 00 $ 12, 000 .
500
Asphalt pathways 3.50 $ 36,575
10,450 SF $
Concrete sidewalks
SF $ 0.45 $ 38,250
85,000
Sod, Groundcover, mulch
SF $ 85. 00 $ 55,250
650
Restroom construction
LS $ 4,000
Signs
LS $ 2,500
Parking lot cutting and patching 7,200
1, 200 SF $ 6.00 $
Pavers
LF $ 2.00 $ 960
480
striping 22, 500
LS $
Irrigation 42, 000
LS $
Electric service and distribution
30 EA $ 1, 800. 00 $ 54, 000
Ughts 20, 000
LS $
Plants and shrubs
LS $ 34, 000
Trees
LS $ 17, 000
Site furnishings & amenities
LS $ 18,000
Gazebo rehab and relocation
40,000
Playground reconfigurationlequip. $
477, 835
SUBTOTAL $
47, 784
contingency
10% $
46,333
Architect Contract $
571, 952
TOTAL for PHASE 2 $
BOARD OF tOMMISSIONERS OF THE FORT WAL.L.. IN BEACH b
COMMUNITY REDEVELOPMENT AGENCY
JUNE 4, 2003
ROD DCT/ ON IHN , 6 PM. q: 2
7m;
A r lar meeting of the Board of Commissioners of the Fort W~l~~ Beach Community Rede loprnent
Agenc was held on Wednesday, June 4, 2003, at 5: 30 p. rn. in the Council Chambers of Fort Walt Beach City
Ha11 wi the fol1owing members present:
Present: Mill Thrush, Chairman; Jason DeShotels ( arrived at 5: 55 p. m.); Judith F1
Chairman; Sara Nagy
Jerry Miller, City Attorney
CALL TO ORDER
The meeting was called to ord
PROPOSED LIBRARY PLAZA P
Review of the proposed plans for the
Missy McKim, CDS Director, advised the esign for ibrary Plaza was scaled back to reduce the cost of the
Plaza. The Staff worked with the Lib Plaza ornmittee to corne up an alternative plan. Ms. McKim
discussed the major changes, including ch . the sidewalks and hard surfaces from pavers to colored
concrete, which will match the bricks already I p.;and the area that was to be continued with the wave design
will now be grass.
The landscape plan basically remains th same except landscape area will be removed, and a few trees
e front
will be added adjacent to the flower b . She advised th ow wall will be removed and a hedge will be used to
buffer equipment, etc. Ms. Mc' informed if the Boar approves the scaled- back plan, it will then go to
Council and to out for bid to see V'l t kind of pricing we get 0 it.
The Board discussed at len the feasibility of using colored c crete in lieu of the pavers with the wave
CDS
design. It was noted that b ides the fact the pavers are expensive, ey are not pedestrian friendly. The
Director suggested that al ative bids could be requested for pavers as ell as the concrete.
Also discussed was e use of the wave pattern as often as possible thro hout the city as the opportunity
permits.
Further discussio included the fact there are no plans for additional parking in the ainStreet area at this time.
Additional par . g has been provided with on- street parking on Brooks.
The parking ts downtown have been
cleaned up an improved.
idenback, 225 Alconese, expressed her opinion that a water feature in the Plaza
d because of budget restraints and safety issues it would not be a good idea.
with alternative bids for pavers well
Ms. agy moved to accept the scaled down plans for the Library Plaza
as ' tlVed concrete, and forward to City Council for their approvaL Mr. Garvie seconded motion and it ca ' ed
u animously with DeShotels, Fiasco, Garvie, Nagy, and Thrush in favor (Gibson and Wenzel absent).
SCHEMATIC PLANS FOR FORT WALTON LANDING PARK
Review of the proposed schematic plans for Fort Walton Landing Park.
CRA 6-4-03
FORT WALTON LANDING PARK PLANS (CaNT)
The CDS Director discussed the plans for the Fort Walton Landing Park, stating they were scaled back from
earlier plans. The changes include keeping the existing stage; keeping the gazebo in its present location;
moving the water feature to a central location; expanding the Science Center to the south; and adding functional
walkways which will enable people to walk from one location to another in the park. She added the trellis will
not be completed until the water feature is cornpleted, and the plans for the performance pavilion are a long way
off. .
Phase IT plans. which will be completed this year, includes the walkways. landscaping, electrical, and irrigation
in the remainder of the park.
Ms. Nagy announced a conflict of interest because her place of employment is a subcontractor on the project,
and would abstain from the vote.
Mr. Garvie moved to accept the schematic plans for Fort Walton Landing Park and forward to City Council
for their approval. Mr. DeShotels seconded motion and it carried unanimously with DeShotels, FIasco,
Garvie, and Thrush in favor and Nagy abstained ( Gibson and Wenzel absent).
The CDS Director advised the plans will go before Council on June 24 and if approved the bid packages will be
prepared to go out in July.
CRA BOARD MEMBER BUSINESS
The oard received clarification that it is anticipated the buildings located at 238- Brooks Street will be
demolisn s part of the M1M Development. Also discussed was the problem th the abundance of trash in
receptacles on ' cago Avenue.
CITY ATTORNEY C ' MENTS
The City Attorney advise e Board this would be his last ring as City Attorney and stated it has been a
privilege to serve the Board, commended Staff for ' ndness and professionalism during his many years
as City Attorney.
JULY MEETING
The next regular meeting will be held
ADJOURNMENT
Being no further bus' the meeting adjourned at 6: 50 p. m.
II
III
t... ~
c::: ~
Z
f'I1 ~
I\
J~-
I
t:>. I
I\
J~
0 <:::::,
o~
w .
I:;, -.
III
m
ttt
0
g
en
en
S
z ~ ~ ~
0:) ~ ~ 0:)
w ciJ V) ~
J ~ Z
to
0) (') (') trJ ~ trJ
CITY COUNCIL MEETING
June 24, 2003
Consideration of the Revised Plan for the Library Plaza
Agenda Item No.- 9
CITY OF FORT WALTON BEACH
COMMUNITY DEVELOPMENT SERVICES DEPARTMENT
MEMORANDUM
Date: June 18, 2003
To: Reid Si1verboard, City Manager ' f5
From: Missy McKim, Director - ^ ^; VJ'--'
Community Development Serv~~ .
SUBJECT: APPROVAL OF REVISED PLAN -LIBRARY PLAZA
REQUEST:
This is a request for approval of a revised plan for the Library Plaza.
BACKGROUND:
At the City Council meeting of 11 December 2001, a committee was assembled to develop
recommendations relative to the design of the plaza. The finn of Harvard Jolly Clees Toppe was
retained to provide architectural services; the recommendations of the committee and a
schematic plan for the plaza were presented at the City Council meeting of26 March 2002.
The CRA budget includes $ 100, 000.00 for the design and construction of the plaza. Gfthe total
funds available for the project, $ 8, 000. 00 is to be paid for design services and construction
documentation, with the remaining $ 92, 000. 00 for the construction of the plaza improvements.
in June, 2002. Staff
City Council approved the construction documents for the Library Plaza
requested bids and received one bid at $ 186, 500. 00 which is approximately twice the amount of
of the On November 12, 2002, City Council
funding that is available for construction project.
have the Library Plaza committee work with the architect
rejected the bid and instructed staff to
to redesign the Plaza in an effort to reduce the cost.
The architect prepared a revised plan which was reviewed by the Library Plaza
Committee on
made further revisions in effort to reduce the costs. These
May 6, 2003. The Committee