Fort Walton Beach Council agenda — 04-29-03 workshop agenda — reading text
Part 9 of 76. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-9716-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
4.4 Conclusions 4- 25
4.5 Recommended Secondary Treatment Upgrades 4- 25
I 4. 6
4. 7
Weighted Alternative Analysis
Recommended Alternative
4- 28
4- 29
4. 8 Capital Costs 4- 33
I 4. 9 Schedule and Sequencing 4- 33
I 5. 0 PROPOSED WWTP CAPITAL IMPROVEMENTS
5. 1 General Description 5- 1
if ' 5- 2
II 5. 2 Screening and Pretreatment
5.3 Primary Clarifiers 5- 3
i 5.4 Secondary Treatment 5- 4
5. 5 Final/Secondary Clarification 5- 5
fill Disinfection 5- 5
5. 6
III 5- 6
5. 7 Effluent Filters
5. 8 Residuals Management Facilities 5- 7
I 5. 9 Plant Recycle Pump Station 5- 8
5. 10 Effluent Disposal 5- 8
I 5. 11 Auxiliary Power 5- 9
5. 12 Capital Costs 5- 10
I 5. 13
5. 14
Present Value Analysis Treatment Alternatives
Conclusions
5- 12
5- 12
I 6. 0 CLASSIFICATION AND STAFFING
6. 1 WWTP Classification and Staffing 6- 1
I 6.2 Additional Classification and Staffing Requirements 6- 2
I F:/ O 1/0 1. 0387 .OOO/ report/toc
HAI#01.0387. 000 111- 04/ 15/ 03
Ii
I
I CITY OF FORT WALTON BEACH
WASTEWATER TREATMENT PLANT
I FACILITIES PLAN
TABLE OF CONTENTS ( Continued)
I Section
No. Title
Page
No.
I 7. 0 LOCAL RECLAIMED WATER REUSE ALTERNATIVES 7- 1
7. 1 Introduction 7- 1
I 7.2 Local Alternatives Analysis 7- 1
I APPENDICES
A. Tables A- I to A- 19
I B. Figures B- 1 to B- 5
I
E
fill
L.
III
Iii
I
I
I
I
I F:/ O 1/0 1. 0387 . OOO/reportloc
HAI#01.0387. 000 lV- 04/ 15/ 03
i: .
f
CITY OF FORT WALTON BEACH
III WASTEWATER TREATMENT PLANT
m
FACILITIES PLAN
LIST OF TABLES
I Table Page
No. Title No.
I
ES- 2 Breakdown of Capital Improvements ES- 14
I 2- 1 Operations Pennit Monitoring Requirements 2- 6
3- 1 Monthly Influent Flow 3- 3
4- 1 Probable Opinion of Capital Costs Rehabilitate Existing RBC Process 4- 10
I 4- 2 Probable Opinion of Capital Costs Westech STM Aerotor System 4- 16
4- 3 Probable Opinion of Capital Costs Oxidation Ditch 4- 23
I 4-4 RBC Rehabilitiation Estimated Costs - Alternative 1 4- 27
4- 5 Westech STM - Aerotor Estimated Costs - Alternative 2 4- 30
I 4- 6 Oxidation Ditch Estimated Costs - Alternative 3 4- 34
5- 1 WWTP - Process Train Probable Opinion Capital Cost Comparison 5- 11
5- 2 WWTP - Present Value Analysis Summary 5- 14
ii.I
7- 1 Soil Hydrogroup Classification 7- 4
filii
7- 2 Soil Types at Proposed Public Access Reuse Sites 7- 6
7- 3 Rate Application 7- 7
II A- I WWTP 3- Month Average Daily Wastewater Flow Summary A- I
A-2 WWTP Influent Data Summary A-3
A-3 WWTP Effluent Data Summary A- 5
Iii...
A-4 RBC Rehabilitation Estimated Costs - Alternative 1 A-7
A-5 WesTech STM-Aerotor Estimated Costs - Alternative 2 A- 8
I A-6
A- 7
Oxidation Ditch Estimated Costs - Alternative 3
Present Value Analysis - RBC - Alternative I
A- I0
A-11
A- 8 Present Value Analysis - STM-Aerotor - Alternative 2 A- 12
I A- 9 Present Value Analysis - Oxidation Ditch - Alternative 3 A- 13
A- 1O Process Train Utilizing RBCs - Estimated Rehabilitation Costs A- 14
I A- 11 Process Train Utilizing Oxidation Ditches - Estimated Capital Costs A- 16
A- 12 Present Value Analysis - Process Train Utilizing RBCs A- 18
I A- 13 Present Value Analysis - Process Train Utilizing Oxidation Ditches A- 19
C- l WW Treatment Facilities in Florida with Permitted Capacities
I F:/ O 1/0 1. 0387 .ODD/ report/toe
HAI#01.0387. 000 v- 04/ 15/ 03
I.
I
I
CITY OF FORT WALTON BEACH
WASTEWATER TREATMENT PLANT
FACILITIES PLAN
LIST OF TABLES ( Continued)
I Section
No. Title
Page
No.
I Greater Than 1. 0 Million Gallons Per Day - Table 1 C- l
C- 2 WW Treatment Facilities in Florida with Permitted Capacities
I Greater Than 1. 0 Million Gallons Per Day - Table 2 C- 5
I
I
I
I
I
I
II
lit,;
I
I
I F:/ O 1/0 1. 03 87 .OOO/ report/toe
HAI#01. 0387.000 Vl- 04/ 15/ 03
fi; i
I"
CITY OF FORT WALTON BEACH
WASTEWATER TREATMENT PLANT
FACILITIES PLAN
LIST OF FIGURES
I Figure
No. Title
Page
No.
j
1- 1 Site Location Map 1- 2
2- 1 Wastewater Service Area and Site Location Map 2- 2
I 2- 2 Existing Site Plan and Aerial Photo 2- 7
2- 3 Existing Process Schematic 2- 8
I 2- 4
2- 5
Mechanical Bar Screen Photos
Grit Cyclone and Classifier Photos
2- 10
2- 11
I...',......
2- 6 Pre- Aeration Basin Photos 2- 12
I 2- 7 Pre- Aeration Basin Photos 2- 13
I..'" 2- 8 Primary Clarifiers Photos 2- 16
I 2- 9 Primary Sludge Pumps Photos 2- 17
2- 10 RBC Basin Photos 2- 19
2- 11 Individual RBC Units Photos 2- 20
2- 12 RBC Drum Shaft and Motor Photos 2- 21
ii 2- 13 Failed RBC Unit Photos 2- 23
II
2- 14 Final Clarifiers Photos 2- 25
2- 15 Chlorine Contact Chamber