READ ALONGSIDE THE SOURCE

Fort Walton Beach Council agenda — 04-29-03 workshop agenda — reading text

Part 57 of 76. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — fwb-9716-original.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

1, 100, 000 25, 000 Additional Denitrification Filter Capacity 650, 000 162, 500 812, 500 3,025,000 I Residual Value After 30 Years I Total Remaining Residual Value I Components with remaining service life Replace Primary Clarifier Drive Units Capital Cost 312, 500 ASL 10 After 30 Vears 156,250 775, 000 10 387,500 High Density RBC Units with Shafts ( stage one) Standard Density RBC Units with Shafts ( stage two) 1, 100, 000 10 550,000 II Aeration System ( piping and diffusers) 25, 000 10 12, 500 Additional Denitrification Filter Capacity 812,500 10 406, 250 Estimated Residual Value 1, 512, 500 i 1) Costs as of 2002, costs are inflated in the present vaiue analysis. m lit IJI iii f:\ 2001/ 01. 0387.000/ ReportlR- 4/ 031403 Final Reportl031403 A- 4, 7 ,1 O, 12. tbl IJI ill II II TABLE A- 11 CITY OF FORT WALTON BEACH WWTP PROCESS TRAIN UTILIZING OXIDATION DITCHES ESTIMATED CAPITAL COSTS fill ill Contingency, Engineering, Total Initial Capital Expense Item Unit Cost Permitting @ 25% Capital Cost ASL till I Pretreatment Structure 12, 500 62, 500 30 Pretreatment Structure Rehabilitation 50, 000 20, 000 5.000 25,000 15 Mechanically Operated Bar Screen I High Pressure Flushing Line Slide Gates from Splitter Box 15,000 20, 000 3, 750 5, 000 18, 750 25, 000 30 30 131, 250 I Clarifiers Prima!)' Removal and Disposal of Existing Drive Units 10, 000 2, 500 12, 500 I Treatment Seconda!)' 5, 000 25, 000 30 RBC Equipment Removal/ Disposal 20, 000 $ 150, 000 37, 500 187, 500 15 Flow EQ Mixers/Rails/Supports I Oxidation Ditch Structure Additional Excavation to Maintain Hydraulic Profile 1, 600,000 250, 000 400, 000 62, 500 2, 000, 000 312, 500 50 500, 000 125, 000 625, 000 20 Mechanical Aerators ( 2 - 150 hp) I Electrical Modifications Recycle Wetwell 250, 000 110, 000 62, 500 27, 500 312, 500 137,500 30 30 115, 000 28,750 143, 750 15 Recycle Pum ps 350,000 87, 500 437,500 30 t Yard Piping Influent & Effluent Weir Gates ( includes recycle basin) 25, 000 6, 250 10, 000 31, 250 50, 000 30 15 Generator (supplemental capacity) 40, 000 4,262, 500 I Effluent Filtration 150, 000 37, 500 187, 500 20 Effluent Filter t Disinfection Liquid Chlorine System 40, 000 $ 10,000 50, 000 15 20, 000 5, 000 25, 000 30 Chlorine Building 1'1 CCC Basin Rehabilitation 100, 000 25,000 125, 000 30 lit 200, 000 I Total 4,793, 750 I r r II f:\ 2001l01. 0387. 000/RcportlR- 4/031403 Final Reportl031403 A- 6, 9, ll,13. tbl pi II! II TABLE A-11 ( continued) CITY OF FORT WALTON BEACH WWTP PROCESS TRAIN UTILIZING OXIDATION DITCHES I ESTIMATED CAPITAL COSTS

Download this text file with its original spacing ↓