READ ALONGSIDE THE SOURCE

Fort Walton Beach Council agenda — 04-29-03 workshop agenda — reading text

Part 56 of 76. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — fwb-9716-original.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

925, 000) Total Present Value $ 5, 790, 312 I Notes: 1) Futurevalue ( FV) based on capital inflation rate of 2. 72% I ( 2) Futurevalue ( FV)based on operating Inflation rate of 3) Present value ( PV)factor based on discount rate of 4) Cost to replace components at the end of their service lives. 2.50% 5.00% 5) Residual value based on components with remaining service life after 30 year analysis. 6) Projected cost to recondition aerator motors It f:\ 200J/ 01.0387. 0 lReportlR-4/ 031403 Final Reportl031403 A-6, 9, ll, l3.tbl fill III L:,; i t TABLE A- 10 CITY OF FORT WALTON BEACH WWTP PROCESS TRAIN UTILIZING RBCs ESTIMATED REHABILITATION COSTS J. Contingency, Engineering, Total It Initial Capital Expense Item Unit Cost Permitting @ 25% Capital Cost ASL Pretreatment Pretreatment Structure Rehabilitation 50,000 $ 12, 500 $ 62, 500 30 20,000 5, 000 25,000 15 Mechanically Operated Bar Screen 15, 000 3,750 18, 750 30 High Pressure Flushing Line Slide Gates from Splitter Box 20, 000 5.000 25, 000 30 I 131, 250 Primary Clarifiers Removal and Disposal of Existing Drive Units 10, 000 $ 2, 500 $ 12, 500 250, 000 62, 500 312,500 20 Replace Existing Drive Units 325,000 I Secondary Treatment 620, 000 $ 155,000 $ 775,000 20 High Density RBC Units with Shafts ( stage one) Standard Density RBC Units with Shafts ( stage two) 880, 000 220, 000 1, 100,000 20 I Gear Boxes, Motors, Controls Repair Basin Structure 150,000 200, 000 37,500 50, 000 187, 500 250, 000 15 30 Influent & Effluent Weir Gates 40,000 10,000 50, 000 30 Aeration System ( piping and diffusers) 20,000 5,000 25,000 20 I Centrifugal Blowers ( 3 - 75 Hp) DO Monitoring System 150,000 20, 000 37,500 5, 000 187, 500 25, 000 15 15 Generator ( supplem ental capacity) 40,000 10,000 50, 000 15 2,650,000 Effluent Filtration Additional Denitrification Filter Capacity 650,000 162, 500 $ 812, 500 20 E Disinfection 40, 000 $ 10,000 $ 50,000 15 Liquid Chlorine Storage/ M etering i:: Chlorine Building 20,000 5,000 25, 000 30 j",: CCC Basin Rehabilitation 100, 000 25,000 125,000 30 200, 000 Total 4,118, 750 II II II lit III f:\ 2001l01. 0387.000/ ReportlR- 4/ 031403 Final Reportl031403 A-4,7, 10, 12. tbl II'! II I TABLE A- 10 ( c;ontinued) CITY OF FORT WALTON BEACH WWTP PROCESS TRAIN UTILIZING RBCs ESTIMATED REHABILITATION COSTS 1) Capital Expenses Expected In 15 Vears ( III' 20,000 5.000 25,000 Mechanically Operated Bar Screen i. Gear Boxes, Motors, Controls 150, 000 37, 500 187, 500 150, 000 37,500 187, 500 Centrifugal Blowers (3 - 75 Hp) DO Monitoring System 20, 000 5,000 25, 000 Ii Liquid Chlorine Storage/ M etering Generator ( supplem ental capacity) 40, 000 40,000 10, 000 10, 000 50, 000 50,000 525,000 I Capital Expenses Expected In 20 Vears ( 1) 250, 000 62,500 312, 500 Replace Primary Clarifier Drive Units 620, 000 155,000 775, 000 High Density RBC Units with Shafts ( stage one) I Standard Density RBC Units with Shafts ( stage two) Aeration System ( piping and diffusers) 880. 000 20, 000 220, 000 5,000

Download this text file with its original spacing ↓