READ ALONGSIDE THE SOURCE

Fort Walton Beach Council agenda — 04-29-03 workshop agenda — reading text

Part 51 of 76. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — fwb-9716-original.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

It: 0 = S <D 1) Vi ..... N 1) 0 < 5 s < 1) c..> - -- 1) 0 -< 0 >-< N filii Q) 0 c..> Q) z ~ :: r: tZJ 0 Z 0 TABLE A-6 CITY OF FORT WALTON BEACH OXIDATION DITCH ESTIMATED COSTS ALTERNATIVE - 3 I Contingency, Engineering, Total Initial Capital Expense Item Unit Cost Permltting@25% Capital Cost ASL RBC Equipment Removal/Disposal 20, 000 $ 5,000 $ 25, 000 30 150, 000 37, 500 187, 500 15 Flow EO Mixers/Rails/Supports 1, 600, 000 400,000 2, 000, 000 50 Oxidation Ditch Structure 250, 000 62, 500 312, 500 50 Additional Excavation to Maintain Hydraulic Profile I Mechanical Aerators ( 2 - 150 hp) Electrical Modifications 500, 000 250,000 125, 000 62, 500 625,000 312, 500 20 30 110,000 27, 500 137, 500 30 Recycle Wetwell 115, 000 28,750 143,750 15 Recycle Pumps 350, 000 87, 500 437, 500 30 Yard Piping 25,000 6, 250 31, 250 30 Influent & Effluent Weir Gates ( includes recycle basin) 40,000 10,000 50,000 15 Generator (supplemental capacity) 4,262, 500 Total 1) Additional Capital Expenses in 15 Years ( 150,000 37, 500 187, 500 Flow EO Mixers/Rails/Supports 115, 000 28,750 143,750 RASNVAS Pumps/Motors 40, 000 10, 000 50, 000 Generator (supplemental capacity) I 381, 250 I 1) Additional Capital Expenses In 20 Years ( 120, 000 30,000 150,000 Rebuild Mechanical Aerators ( 2 - 150 hp) I Residual Value After 30 Years Total Remaining Residual Value Capital Cost ASL After 30 Years iii Components with remaining service life 2, 000,000 20 800, 000 Oxidation Ditch Structure 312, 500 20 125, 000 Additional Excavation to Maintain Hydraulic Profile III iii Estimated Residual Value 925,000 1) Costs as of 2002, costs are inflated in the present value analysis. I, III f:\ 2001/ 01.0387. 000/Report/ R-4/ 031403 Final Report/031403 A-6, 9, ll,13. tbl l III III II Table A-7 Present Value Analysis RBC - Alternative 1 Ii Capital Operating Total Period Year Current FV Current Future Current Future PV Factor PV 0 2002 $ 2, 650, 000 2, 650, 000 2, 650, 000 2, 650, 000 1. 00 2, 650, 000 1 2003 0.95 2 2004 86, 000 90, 354 86, 000 90, 354 0. 91 81, 954 3 2005 86, 000 92, 613 86, 000 92,613 0. 86 80, 002 4 2006 86, 000 94, 928 86, 000 94, 928 0. 82 78, 097 5 2007 86, 000 97, 301 86, 000 97, 301 0. 78 76, 238 I 6 7 2008 2009 86, 000 86, 000 99, 734 102, 227 86, 000 86, 000 99, 734

Download this text file with its original spacing ↓