READ ALONGSIDE THE SOURCE
Fort Walton Beach Council agenda — 04-29-03 workshop agenda — reading text
Part 43 of 76. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-9716-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
irrigation system ( R002). Discharge is to a 2. 0
million gallon holding tank at the Fort Walton Beach municipal golf course with
II subsequent discharge to the 200 acre 18- hole golf course.
The chlorine residual and fecal colifonn samples of the disinfected effluent leaving the chlorine
ill
contact chamber are sampled at the following locations:
I\
I1II
F:\2001\ 01.0387. 000\Report\ R-4\ 041403 FINAL\ SEC 5. doc
HAI#01- 387. 00 5- 8 041403
II
lilt
III!
I11III
1. ROOl - the onsite sprayfield sampling point is taken at the chlorine contact
chamber.
2. R002 - the sprayfield sampling point at the golf course, is 100 feet north prior to
II! the golf course' s above ground storage tank and after the after the Chlorine
Injector Box in the eflluent discharge pipe.
I Approximately 300, 000 to 500, 000 gallons per day is discharged to the City golf course storage
tank and subsequently pumped through irrigation spray heads sprinklers for irrigation. The
I distribution to the restricted access sprayfield is based on a time dataflow system. There are
eight ( 8) zones within the sprayfield rotated every 0. 5 hours by a timer. The distribution system
I for the sprayfield consists of a grid of spray heads on fixed risers.
The eflluent from the WWTP is discharged into a 29 MG lined effluent holding pond. The
I
effluent is then pumped to ROOI : from this pond using the vertical turbine pumps located at the
h!J irrigation pump station or pumped through the sand filter for tertiary treatment and gravity fed to
a 2. 0 MG aboveground holding tank located at the City' s municipal golf course to be later
pumped by a booster pump to the R002 sprayfield. The booster pump at the golf course can be
I used to empty the 2. 0 MG holding tank effluent back to the holding pond during times of
maintenance operations. Manual control valves are used to divert the eflluent to the different
III
locations.
Presently, the sprayfields and the eflluent disposal system are operating as designed and no
immediate capital expenditures are required. Section 7 of this report reviews the availability of
additional public access reuse for the City.
I!
IIII 5. 11 AUXILIARY POWER
II
II
The City' s WWTP is currently equipped with a 400 KW auxiliary diesel generation set with bulk
1;..
fuel storage on- site. The generator has sufficient capacity to supply power to the existing RBC
with the
process in the event of a power outage although additional capacity will be necessary
projected WWTP improvements. The MLE process alternative requires approximately 300 KW
of additional standby power due to the larger aerator motors and the addition of recycle pumps
required for the activated sludge process. The RBC process will also require additional auxiliary
III
basin. The estimated
power due to the installation of the diffused air system into the RBC
F:\2001\ 01.0387. 000\Report\ R-4\ 041403 FINAL\SEC 5. doc
III! HAI#01- 387. 00 5- 9 041403
Iii
I.,.;
I
I auxiliary power requirement for the RBC process is 150 KW. It is estimated that the additional
standby generator will cost $ 50, 000 for the RBC process and approximately $ 100, 000 for the
I MLE process, which includes engineering, contingency, and permitting.
I 5. 12 CAPITAL COSTS
Table 5- 1 compares the probable opinion of capital costs associated with utilizing the RBC and
I MLE alternatives. The probable opinion of capital costs associated with the treatment process
utilizing the RBC alternative is $ 4, 118, 750. The RBC initial capital costs and future capital
I expenditures related to this process are summarized in Table A- I0. The probable opinion of
capital costs associated with the treatment process utilizing the MLE process alternative is
I 4,793, 750. The MLE process initial capital costs and future capital expenditures related to this
process are summarized in Table A- II.
I
I
I
fill
l;:
IJIIII
i
It
IJIIII
III
II
III
liC". ;
T,~
l1li
1M
ill
F:\2001\ 01.0387. 000\ \ - 4\ 041403 FINAL\ SEC 5. doc
ReportR
HAI#01- 387. 00 5- 10 041403
TABLE 5- 1
CITY OF FORT WALTON BEACH WWTP
PROCESS TRAIN
PROBABLE OPINION CAPITAL COST COMPARISON
I
RBC REHABILITATION COSTS MLE OXIDATION DITCH CAPITAL COSTS
I'.".' Total Total
Initial Capital Expense Item Capital Cost Initial Capital Expense Item Capital Cost
I Pretreatment Pretreatment Structure
Pretreatment Structure Rehabilitation 62. 500 Pretreatment Structure Rehabilitation 62, 500
Mechanically Operated Bar Screen 25, 000 Mechanically Operated Bar Screen 25, 000
I High Pressure Flushing Line 18. 750 High Pressure Flushing Line 18. 750
Slide Gates from Splitter Box 25, 000 Slide Gates from Splitter Box 25, 000
I 131, 250 131, 250
Primary Clarifiers Primary Clarifiers
I Removal and Disposal of Existing Drive Units 12, 500
312, 500
Removal and Disposal of Existing Drive Units 12. 500
Replace Existing Drive Units
12, 500
I 325, 000
Secondary Treatment Secondary Treatment
I High Density RBC Units with Shafts ( stage one)
Standard Density RBC Units with Shafts ( stage two)
775. 000
1. 100. 000
RBC Equipment Removal/ Disposal
Flow EQ Mixers/Rails/Supports
25, 000
187. 500
Gear Boxes. Motors. Controls 187, 500 Oxidation Ditch Structure 2. 000, 000
d
250, 000 Additional Excavation to Maintain Hydraulic Profile 312, 500
Repair Basin Structure
Influent & Effluent Weir Gates 50, 000 Mechanical Aerators ( 2 - 150 hp) 625, 000
Aeration System ( piping and diffusers) 25, 000 Electrical Modifications 312, 500
187, 500 Recycle Wetwell 137, 500
Centrifugal Blowers ( 3 - 75 Hp)
DO Monitoring System 25, 000 Recycle Pum ps 143, 750
Generator (supplem ental capacity) 50. 000 Yard Piping 437. 500
Influent & Effluent Weir Gates ( includes recycle basin) 31. 250
Generator ( supplem ental capacity) 50, 000
l1li
2, 650, 000 4, 262, 500
ill
Effluent Filtration Effluent Filtration
Additional Denitrification Filter Capacity 812, 500 Effluent Filter 187, 500
II
Disinfection Disinfection
I'~.'
1~,
Liquid Chlorine Storage/ M etering
Chlorine Building
50. 000
25, 000
