combined flow then
proceeds to the oxidation ditch where it is mixed with recirculating flow in the oxidation ditch
I channels. At nonnal design velocities, the volume of mixed liquor flowing in the channel is
between 50 and 100 times the influent flow. This recirculating flow pattern and the resulting
I dilution of influent prevents short- circuiting and provides a consistent reliable effluent quality.
An amount of flow equal to the influent plus RAS is continuously displaced over the effluent
I weIr.
An additional feature of the MLE process using an oxidation ditch configuration is the plug flow
I mode of operation, which is achieved within the basin channels. One benefit of the plug flow
feature is the flocculation of mixed liquor solids, which occurs in the basin channels after the
I aeration zone as the mixed liquor approaches the effluent weir. Bio- flocculation helps improve
settling and clarification in the final clarifier.
I
The aerator layout used with the oxidation ditch configured MLE process makes it possible to
I use fewer aerators, reducing maintenance requirements. The aerator layout provides an
opportunity to enclose the aeration zones for the prevention of potential mist.
i:
F:\2001\ Ol. 0387. 000\Report\ R-4\ 041403 FlNAL\ SEC 4. DOC
HAI#01.0387. 000 4- 31 041403
c
The anoxic basin is positioned upstream trom the oxidation ditch so as to receive mixed liquor
I'll! recycle trom the oxidation ditch which contains high concentrations of nitrates fonned trom the
oxidation of ammonia. In the anoxic basin, nitrates in the internal recycle are mixed with the
influent wastewater and clarifier return sludge. Since this basin is mixed and not aerated, the
I bacteria will utilize the oxygen in nitrate nitrogen for their oxygen source while consuming a
portion ofthe influent BOD.
I Internal recycle trom the oxidation ditchto the anoxic basin is achieved by means of a side
channel adjacent to the inlet to the aeration zone. Flow is forced into this channel by means of
I the velocity head generated in the oxidation ditch channels. At the entrance of the recycle
channel, a control gage allows for adjustment ofthe flow. Flow is returned to the oxidation ditch
I by means of another side channel adjacent to the outlet of the aeration zone. Control of internal
recycle through the internal recycle channel is achieved by means of a manually operated flow
I control gate. The gate, located at the entrance of the channel, allows adjustment for a wide range
of recycle flow.
I The MLE process was sized with a solids retention time ( SRT) of 10 days and a hydraulic
detention time ( HDT) of 12 hours. This sludge age is selected to ensure that the effluent
I requirements for this installation are met on a consistent basis. This also provides stable
operation that will be relatively unaffected by diurnal load variations. The long hydraulic
I detention time that results will help attenuate nonnal fluctuations in the influent, which translates
to process stability and forgiveness.
I This level of
A MLSS concentration of 3, 000 mg/l was assumed for sizing the MLE system.
MLSS is considered prudent for gaining maximum economy in the aeration basin structure ( i.e.
I volume) while not compromising operating flexibility of the installation or solids loading
capacity of the final clarifiers. Selecting a 3, 000 mg/l design MLSS will preserve process
I flexibility since the MLE process is capable of operating at MLSS levels of over 8, 000 mg/l.
Only clarifier solids loading capacity would limit the maximum operable MLSS level.
I
Two ( 2) basins are recommended which will provide good operational flexibility and the close
I proximity of the aeration equipment for this layout simplifies construction, piping, electrical and
installation. It was detennined that 150 HP aerators are necessary for each basin.
i.
F:\2001\ 01.0387. 000\Report\ R-4\041403 FINAL\ SEC 4. DOC
HAI#01.0387. 000 4- 32 041403
iI.
The conversion to the oxidation ditch activated sludge process will require recycle pumping from
the secondary clarifiers. This recycle is necessary to maintain the microorganisms in the
III activated sludge process. Therefore, this will require the addition of recycle pumps, recycle
basin, yard piping and control equipment to direct the RAS to the process basin.
4. 8 CAPITAL COSTS
I The probable opinion of capital costs for the upgrades to the City's WWTP incorporating an
oxidation ditch process is summarized on Table 4- 6. As with the other reviewed alternatives,
I these costs are based on unit prices obtained from recent bid experience with upgrades to similar
wastewater treatment facilities, as well as infonnation obtained from manufacturers of the
I equipment to be supplied. As indicated on this table, the total probable opinion of cost for the
upgrades to the City' s WWTP is estimated to be approximately $4, 262, 500.
I 4. 9 SCHEDULE AND SEQUENCING
I Based on the proposed plan described above it is anticipated that the overall program would be
completed within 2 years from inception, with no downtime of the facilities required.
I Construction will account for 18- months of this total, with the last 2- months of construction
being reserved for start- up and operational modifications to bring the new facilities on- line.
I Based on our experience the construction of the new facilities can proceed without impacting the
existing facilities.
I
Once the construction of the recommended improvements is completed, the necessary yard
piping to connect the new process structures would be connected, the equipment tested and
certified, and the aeration basin seeded. A portion of the influent flow will then be diverted to
new process tankage to acclimate the biomass in the unit. Once the new process is acclimated,
Ii the existing RBC facilities will then be decommissioned and equipment removed, and all influent
wastewater will flow through the new process tankage for treatment.
III
II.
iIII
F:\2001\ 01.0387. 000\Report\ R-4\ 041403 FINAL\ SEC 4.DOC
HAI#01.0387. 000 4- 33 041403
II"'
iii TABLE 4- 6
CITY OF FORT WALTON BEACH
WASTEWATER TREATMENT PLANT
PROBABLE OPINION OF CAPITAL COSTS
MLE PROCESS ALTERNATIVE
I
Description of Work Cost
I RBC Equipment Removal and Disposal 20, 000
Flow EQ Mixers/Rails/ Supports 150, 000
Oxidation Ditch Structure 1, 600,000
Additional Excavation to Maintain Hydraulic Profile 250, 000
Mechanical Aerators ( 2 - 150 HP) 500,000
Electrical Modifications 250, 000
I.
Recycle Wetwell 110, 000
Recycle Pumps 115, 000
l1li
Yard Piping 350, 000
Influent & Effluent Weir Gates ( includes recycle wetwell) 25, 000
Generator ( supplemental capacity) 80. 000
I SUB- TOTAL 3, 410, 000
I Engineering, Contingency, Pennitting @ 25% 852.500
TOTAL 4. 262. 500
I
I
I
I
I.
F:\2001 \ Ol. 0387. 000\Report\ R-4\ 041403 FINAL\table 4- 6.doc
HAI #01.0387. 000 4- 34 041403
IJIIIII
IIiI
IJIIIII
j
iii SECTION 5
filii
PROPOSED WWTP CAPITAL IMPROVEMENTS
II
5. 1 GENERAL DESCRIPTION
I Previous sections of this report discussed the City' s existing service area, treatment facilities,
historical wastewater characteristics, projected wastewater characteristics, and alternative
I secondary treatment process options. The reviewed alternatives to improve the secondary
treatment portion of the facilities included:
I
1. Rehabilitating the existing RBCs and replacing damaged units.
I 2. Retrofitting the RBC basins with an advanced fixed film process, such as the
WesTech STM- AerotorThl system.
I 3. Abandoning the RBC process and replacing it with a conventional suspended
growth activated sludge process ( MLE Oxidation Ditch).
I A weighted analysis was preformed and it was determined the MLE oxidation ditch alternative
was the most viable option to replace the City' s existing RBC treatment process. Although the
I MLE oxidation ditch system was the recommended alternative, the City desired to further
III! investigate the option of replacing the existing RBC process with new RBC equipment. The
initial capital expenditures associated with installing new RBC units were determined to be
substantially less than that of the MLE oxidation ditch alternative. However, each of these
r
II.
treatment alternatives has unique requirements separate from the secondary process, which
impact the total capital expenditures. This section analyzes the total treatment plant process
pi
i' costs associated with the RBC and MLE oxidation ditch alternatives.
ill
Major components to the City wastewater treatment process