The probable OpInIOn of capital costs for the upgrading the City' s WWTP by
11 incorporating an oxidation ditch process is summarized on Table 4- 3. As with the
other reviewed alternatives, these costs were based on unit prices obtained from
j recent bid experience with upgrades to similar wastewater treatment facilities, as well
Ii
as infonnation obtained from manufacturers of the equipment to be supplied. As
indicated on Table 4- 3 the total probable opinion of cost for the upgrades to the City' s
WWTP is estimated to be approximately $4, 262, 500.
4. 2.3.2 Scheduling and Sequencing
till
Based on the proposed plan described above it is anticipated that the overall program
can also be completed within 2 years from inception, with no downtime of the
facilities required. It is anticipated that final design and permitting associated with
this alternative would take approximately 4- to 6- months to complete, including
review periods. Similar to the other alternatives considered, bidding, review and
recommendation for award will require 2- months to complete. Construction of the
II
improvements would take approximately 16- months to reach substantial completion.
III
During the last 2- months start- up and operational modifications to bring the system
ill on line would take place. Based on our experience construction can proceed on the
fill!
new facilities without impacting the operation of the existing RBC system.
Once the construction of the recommended improvements is completed, the necessary
r yard piping to connect the new process structures would be connected, the equipment
tested and certified, and the aeration basin seeded. A portion ofthe influent flow will
till
1 then be diverted to new process tankage to acclimate the biomass in the unit. Once
the new process is acclimated, the existing RBC facilities will then be
III
F:\200 1 \ 0 1. 0387. 000\Report\ R-4\ 041403 FINAL\ SEC 4. DOC
HAI#01.0387. 000 4- 21 041403
ill
Ii
decommissioned and equipment removed, and all influent wastewater will flow
through the new process tankage, for treatment.
M
II
I
I
I
I
I
I.
I
fill
Iii
I
III
J,
fill
t:
iii
II
III'
I.
F:\2001\ 01.0387. 000\Report\ R-4\ 041403 FINAL\ SEC 4. DOC
HAI#01. 0387. 000 4- 22 041403
TABLE 4- 3
lilt CITY OF FORT WALTON BEACH
II WASTEWATER TREATMENT PLANT
PROBABLE OPINION OF CAPITAL COSTS
OXIDATION DITCH
I
Description of Work Cost
I RBC Equipment Removal and Disposal 20, 000
Flow EQ Mixers/Rails/ Supports 150, 000
I Oxidation Ditch Structure
Additional Excavation to Maintain Hydraulic Profile
1, 600, 000
250, 000
Mechanical Aerators ( 2 - 150 HP) 500, 000
I Electrical Modifications 250,000
110, 000
Recycle Wetwell
Recycle Pumps 115, 000
I Yard Piping
Influent & Effluent Weir Gates ( includes recycle wetwell)
350,000
25, 000
Generator ( supplemental capacity) 40. 000
I SUB- TOTAL 3, 410,000
I Engineering, Contingency, Permitting @ 25% 852. 500
TOTAL 4. 262. 500
ill
IIIII
II
F:\2001\ 01.0387. 000\Report\ R-4\041403 FINAL\table 4- 3. doc
HAl #01.0387.000 4- 23 041403
i. 4.3 PRESENT VALUE ANALYSIS
r
The proposed alternatives that were evaluated to upgrade the City' s WWTP facilities will
improve the level of service presently provided to the City's wastewater customers, as well as
I meet the rules and regulations, which govern the treatment of wastewater.
information researched for the improvements, modifications, and/or upgrades that are required
Based on the cost
for the existing wastewater facilities, a 30- year present value analysis was performed.
I
To accurately weigh the financial components of each alternative, the historical operating
I expenses, projected operating expenses, and projected capital costs were utilized to determine a
present value. The present value analysis for each wastewater treatment facility alternative was
I for a 30- year service life utilizing data provided by the City and several other considerations and
assumptions which are summarized below:
I 1. Operating and maintenance ( O& M) expenses remained constant for the purpose of
comparing the various wastewater treatment alternatives.
I 2. The operating and maintenance expenses were estimated from the City' s Wastewater
Utilities Fund, power costs were projected, and labor expenses were estimated.
I 3. Capital costs were projected utilizing actual component replacement costs from City
records as well as unit costs obtained from bid experiences of similar wastewater
I facilities and cost estimates from equipment suppliers.
4. An analysis period of 30- years was used, together with an assumption of a discount
r rate of 5- percent.
5. An average capital inflation rate of 2. 72- percent was assumed as reported in the
fill'
Engineering News Record ( ENR) and Handy- Whitman Index ( HWI).
6. An average operating inflation rate of2.5- percent was assumed.
k'
7. Average service lives were assumed for each process component based on industry
standard values.
IIIIIIII
The present value analysis performed for each of the treatment alternatives included the
estimated construction cost and the present worth of O& M costs. Construction costs were
f, estimated based upon vendor' s quotations, estimated installation costs, cost data for similar
ill
projects, and published cost data, as previously discussed.
II
F:\2001\ 01.0387. 000\Report\ R-4\ 041403 FINAL\ SEC 4.DOC
HAI#01.0387. 000 4- 24 041403
The O& M costs utilized for this analysis included the cost of labor, power, and normal
l1li
replacement parts. Inflated component replacement costs are added to the present value analysis
at the end of each components average service life ( ASL). A residual value was added back to
the present value for components with a useful life remaining after the 30- year analysis. These
Un residual values were based on an assumed ASL and straight- line depreciation over the ASL for
each component. The estimated capital costs and component residual values for each alternative
are shown in Tables A-4, A-5, and A-6.
4.4 CONCLUSIONS
I
The purpose of this section of the report was to evaluate several wastewater treatment
I alternatives utilizing a present value analysis. As described previously, a 30- year proforma
analysis was based on projected capital and O& M costs for each of the three alternatives. In
Iii!! summary, the following conclusions were developed:
Ira
1. The resulting present value of Alternative 1 was $ 5, 887, 585. A residual value of
I 950, 000 was assumed for equipment with a remaining service life and this value
was applied to the present value. The total present value of Alternative 1 is
I 4, 937, 585 as shown in Table A- 7.
2. The resulting present value of Alternative 2 was $ 5, 298, 999. A residual value of
I 656, 250 was assumed for equipment with a remaining service life and this value
was applied to the present value. The total present value of Alternative 2 is
I 3.
4, 642, 749 as shown in Table A- 8.
The resulting present value of Alternative 3 was $ 6, 715, 312. A residual value of
tII
I' 925, 000 was assumed for equipment with a remaining service life and this value
II
was applied to the present value. A total present value of Alternative 3 is $ 5, 790,312
as shown in Table A- 9.
II
The present value analysis for each of the wastewater treatment alternatives is summarized in
Table 4- 4. The results of the present value analysis are included in Section 5 as a part of a
weighted analysis and is relative only in conjunction with the circumstances presented herein and
III
made part of such projections, and no assurances are