to three ( 3) primary alternatives for the City' s
consideration. The reviewed alternatives take into consideration current and projected
II wastewater flows within the City' s wastewater service area, ease of operation, site layout, capital
II
I
F:\2001\ 01.0387. 000\Report\ R-4\ 041403 FINAL\SEC 4. DOC
HAI#01.0387.000 4-4 041403
Ii
fIIIIII
III costs, and operational costs among other issues. Considering several available treatment
processes, there are essentially three ( 3) feasible alternatives available to the City, which include:
1. Rehabilitating the existing RBCs and replacing damaged units.
I 2. Retrofitting the RBC basins with an advanced fixed film process, such as the
WesTech STM- Aerotor""
system.
II 3. Replacing the RBC process with a conventional suspended growth activated
I
sludge process.
I Summarized herein are the findings of our analysis and an evaluation of the alternatives available
to the City with regard to upgrading their WWTP to improve the overall efficiency and
I.'."
I perfonnance of the facility.
I 4. 2. 1 Alternative 1 - Rehabilitate Existing RBCs
The existing RBC units are reaching the end of their service life and the units have been plagued
l"
with a history of structural and mechanical problems, such as mechanical failure of the drive
fill units, bearings, and frame assemblies. These mechanical failures have resulted in component
jz..;
III interference with the concrete basins, which has caused damage to the structure. Previous repairs
to the RBC concrete structure have been substandard and the structure requires substantial
ill. improvements to support new drive units, frames, and media.
II
The RBC structures which support the disk media includes a rotating steel shaft supported by the
II
walls of the concrete process basin. The fixed film media is partially submerged in the
filii
wastewater and rotates at approximately 1 to 5 revolutions per minute ( rpm). Biological growth
becomes attached to the surface of the disks and eventually fonns a slime layer over the entire
I'
ll wetted surface area of the disks. The rotation of the disks alternately contacts the biomass with
III the organic material in the wastewater and then with the atmosphere for adsorption of oxygen.
The disk rotation affects oxygen transfer and maintains the biomass in an aerobic condition. The
rotation also is the mechanism for removing excess solids from the disks by the shearing forces it
creates and maintaining the sloughed solids in suspension so they can be carried from the unit to
a clarifier. Figure 4- 2 illustrates the City' s WWTP RBC arrangement and the drive units and
motors are shown in Figure 4- 3.
j
lit
lilt
F:\2001 \ 0 1.0387. 000\Report\ R-4\ 041 403 FINAL\ SEC 4. DOC
HAI#01.0387.000 4- 5 041403
II
RBCs utilize a low operating food to micro- organism ( F1M) ratio, which pennits them to
withstand hydraulic and organic surges effectively. The effect of staging in this plug flow
system helps eliminate short- circuiting and lessens the effects of shock loadings on the system.
At a flow of 4. 50 MGD, the hydraulic loading for the existing system is in the range of 1.25 to
I''''.'
i!! 2. 25 gpd/sq. ft. Further, assuming a CBODs removal of 30- percent across the primary clarifiers,
to 2. 63 lbs.
then organic loading of the existing units appears to be in the range of 1.46
I CBODslday/ sf at a flow of 4.50 MOD. Both of these loadings are within the generally accepted
I values for municipal WWTPs.
I To utilize the existing RBC process, several items were addressed to determine the feasibility of
this alternative. This alternative requires replacement of the failing RBC shafts, mechanical
drive units, media, and rehabilitation of the concrete structure to bring the existing facilities to an
acceptable level of service. In addition, this alternative includes the installation of torque sensing
III
devices for the individual RBC shafts to signal shaft rotation stress when a malfunction occurs
within the assembly. It is anticipated that the installation of a torque- sensing device should
reduce damage to the units by disrupting power to the motors and subsequently stopping rotation
II when a malfunction occurs.
In addition to the biological treatment considerations described above, the final clarifier loadings
must be addressed. The generally accepted design guidance document entitled " Recommended
Standards for Wastewater Facilities, Great Lakes- Upper Mississippi River Board of State Public
Health and Environmental Managers" sets forth suggested peaking factors and pennissible
loadings for various unit operations. This document is commonly known as " 10 State Standards"
and it is widely recognized and referred in F AC Chapter 62- 600 of the Florida Administrative
Code ( F AC). Based on the peaking factor graph shown in this reference, a peaking factor of 2. 50
appears to be appropriate for a WWTP with a design AADF of 4. 50 MOD.
This results in a
III projected peak hourly flow of 11.25 MOD. Currently, there are two ( 2) 70- foot diameter
clarifiers which provide a combined surface area of 7, 696 square feet ( sf). At a PHF of 11.25
MOD, the overflow rate for the existing clarifier units will equal 1, 462 gpd/sf. For a clarifier
handling flow from a fixed growth process, 10 State Standards indicates that the overflow rates at
PHF should not exceed 1, 200 gpd/sf. In view of this finding, it appears that a third 70- foot will
be necessary when the AADF approaches 3. 50 MOD.
i
F:\2001\ 01.0387. 000\Report\ R-4\ 041403 FINAL\ SEC 4. DOC
HAI#01.0387. 000 4- 6 041403
l~
c:
o
m
s
gJc:
.
u.....
c:
m.
01110
OmZ
Ecl1l
1110,:::
tI)- m
mc...
en;:
Q)- S
0<(
O~ I:
L
00
m
a:
c:
tI)
j;(
w
t.)
2
FIGURE
4- 3
ill
4.2. 1.1 Capital Costs
II The probable opinion of capital costs for Alternative 1 is summarized in Table 4- 1.
These costs are based on unit prices obtained from recent bid experience as well as
information obtained from manufacturers of the equipment to be supplied. As such,
I the prices indicated in this table, reflect the anticipated costs if the project were
currently bid. As indicated on this table, the total probable opinion of cost for the
upgrades to the City' s WWTP RBC process is estimated to be approximately
2, 650, 000.
i
4.2. 1. 2 Scheduling and Sequencing
Based on the proposed plan described above it is anticipated that the overall program
would be completed within 26- months from inception of the project. Furthermore, no
downtime of the facilities should be required, based on the projected influent flows
and the arrangement of the existing tankage.
I
is that the design associated with this alternative would take
It anticipated
I approximately 4 to 6 months to complete, including review periods and permitting. It
is anticipated that bidding, review of bids, and recommendation for award will require
i. an additional2- months to complete. Once construction is underway, the time to reach
substantial completion is estimated to be approximately 16- months. During the last
2- months, start- up and operational modifications to the system would take place.
11"
ill
r
Ii
i
III'
II
Iii
I F:\2001\ 01.0387. 000\Report\ R-4\ 041403 FINAL\ SEC 4. DOC
HAI#01.0387.000 4- 9 041403
i~:;,
0
III TABLE 4- 1
III CITY OF FORT WALTON BEACH
II WASTEWATER TREATMENT PLANT
PROBABLE OPINION OF CAPITAL COSTS
filii REHABILITATE EXISTING RBC PROCESS
Cost
Description of Work
I 620,000
High Density RBC Units with Shafts ( stage one)
Standard Density RBC Units with Shafts ( stage two) 880, 000
IT;;~
Gear Boxes, Motors, Controls 150, 000
200, 000
Repair Basin Structure
Influent & Effluent Weir Gates 40, 000
Aeration System (piping and diffusers) 20,000
150, 000
Centrifugal Blowers ( 3- 75 Hp)
DO Monitoring System 20, 000
40. 000
Ii Additional Generator Capacity
SUB- TOTAL $ 2, 120, 000
II
II Engineering, Contingency, Pennitting