end of the shaft by a 7. 5 horse- power, 460
volt, 1180 rpm, 10 amp, three- phase motor. Figure 2- 10 shows the RBC basin with
covered and uncovered RBCs and Figure 2- 11 shows individual RBC units outside of
Ii
the RBC basin. Figure 2- 12 shows an example of the end of drum shaft and motor in
operation.
In each of the City' s four ( 4) treatment trains there are three ( 3) standard density
ill media units, with a surface area of 112,480 square feet each, and two ( 2) high density
media unit at 157, 000 square feet each. Two ( 2) standard density units are the first
r
units in the process stream, followed by a baffle, then one (1) standard density unit,
followed by a another baffle, which are followed by the two ( 2) high- density units.
The total media area in the RBC system of the four ( 4) trains of five ( 5) units is
2, 606, 000 square feet. Originally, RBC systems in the United States were designed
pi! based on hydraulic loading. However, the design approach shifted and focused more
on total BOD per unit of surface area ( pounds of BOD per square feet) and more
fill
specifically, soluble BOD per unit of surface area (pounds of soluble BOD per square
j
feet). Based on the design flow of 4. 50 MGD, the following hydraulic loading rate
infonnation was calculated:
FWB WWTP
t
Parameter At Desi
Hydraulic Loading Rate, gallons per day per 1.7 0. 75 to 2. 0
III!
square foot ( gpd/st)
fill At a 4.50 MGD design flow, the allowable BOD loading for the City' s RBCs range
i;
from 104 mglL to 208 mglL. These values were calculated based on a typical total
BOD per day per 1, 000 square feet range of 1.5 to 3. 0.
I
F:\2001\ Ol.0387. 000\Report\ R-4\041403 FINAL\SEC 2. doc
P! HAI#01.0387. 000 2- 18 04/ 14/ 03
Figure2~10
City of Fort Walton Beach
Wastewater TreatmentPlant Facilities Plan
RBC Basin
RBC Unit without Covers during Maintenance
F:\2001\ Ol.0387. 000\Report\ R-4\ 041403 FINAL\ SEC 2. doc
HAI#01.0387. 000 2~19 04/ 14/ 03
Figur~ 2- 11
City of Fort Walton Beach
Wastewater Treatment Plant Facilities Plan
Individual RBC Units
Individual RBC Unit
Individual RBC Unit
F:\2001\ 01.0387. 000\Report\ R-4\ 041403 FINAL\SEC 2. doc
HAI#01. 0387. 000 2- 20 04/ 14/03
Figure 2- 12
City of Fort Walton Beach
Wastewater TreatmentPlant Facilities Plan
RBC Drum Shaft and Motor
RBC End Drum Shaft
RBC Motor
F:\2001\ Ol.0387. 000\Report\ R-4\ 041403 FINAL\ SEC 2. doc
HAI#01.0387. 000 2- 21 04/ 14/ 03
to the media
In the RBC process, the primary treated/ screened wastewater is applied
becomes coated
I
through which the flow percolates. The surface of the media quickly
The
with a viscous, jelly-like, slimy substance containing bacteria and other biota.
biota remove organics by adsorption and assimilation of soluble and suspended
constituents.
J
The
The quantity of biomass produced is controlled by the available organic load.
W amount of biomass on the media surface increases as the organic load
and strength
is
increase until a maximum effective thickness is reached. This maximum thickness
2 controlled by physical factors, including hydraulic dosage rate, type of media, type
of
and the nature of
organic matter, amount of essential nutrients present, temperature,
IJI!I
I biological growth.
fill As previously noted, there are 20 total RBC units with a plastic type
media at the
I the unit by gravity feed. No
City's WWTP, and the influent wastewater is applied to
Based the historical
flit forced air ventilation is provided into the RBC basins. on
i
is not required, which is
ill performance of the City' s RBC units, forced air ventilation
normally installed to improve treatment efficiency.
II
Since the
Effluent from the RBC basin is split between two ( 2) final clarifiers.
fill
effluent from the RBC discharges into two ( 2) pipes installed at each of the RBC
for the WWTP
basin, similar to the flow from the pre- aeration basin, it is difficult
staff to adjust effluent discharges to ensure equal flow to each final clarifier.
III
maintenance
The RBCs have proven to be labor intensive from an operation and
and maintenance issues with the
perspective. The City experiences routine operation
motor/ drive
media sectors separating from units, RBC units becoming unbalanced,
the basin. The
Ii unit operation difficulties, and problems with the concrete joints of
15 years for RBC repair and
City has spent in excess of $1, 000, 000 over the past
000 in
media replacement. The City' s capital improvement plan includes $ 590,
iii
funding over the next five ( 5) years starting in fiscal year 2002- 2003 for media
shows photographs of a failed RBC
repair/replacement for the RBCs. Figure 2- 13
Ii unit following the displacement of the media sector from the unit.
I
I
F:\2001\ 01.0387. 000\Report\ R-4\041403 FINAL\ SEC 2. doc
2- 22 04/ 14/ 03
HAI#01.0387. 000
l.
i
Figure 2- 13
City ofFQrt Walton Beach
Wastewater Treatment Plant Facilities Plan
Failed RBC Unit Photos
RBC Drum with Missing Media Sector
Failed RBC Media
F:\200 1 \ 0 1. 0387 . 000\Report\ R-4\ 041403 FINAL\ SEC 2. doc
2- 23 04/ 14/ 03
HAI#01.0387. 000
lJj' lin 1 r",
II
fill
i'
I' 2. 3.2.4 Final/ Secondary Clarification
From the RBC basin, the effluent flows by gravity to the final clarifiers. Similar to
Ii
the primary clarifiers, the final clarifiers provide a quiescent zone for settling of the
effluent from the RBC process. The clarified effluent from these units then flows by
solids in
gravity to the chlorine contact basin for disinfection. A portion of the settled
the final clarifiers are periodically wasted to the digestion units.
It
There are two ( 2) circular final clarifier basins at the City's WWTP. Each of the
basins is 70- feet in diameter with an operating side- water depth of 12 feet. The final
clarifiers have a total surface area of 7, 696 square feet, and have a design overflow
II
rate at average daily flow of approximately 585 gpd/ sf. Typical overflow rates for