READ ALONGSIDE THE SOURCE

Fort Walton Beach Council agenda — 04-29-03 workshop agenda — reading text

Part 15 of 76. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — fwb-9716-original.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

Fort Walton Beach of about 540). The City' s wastewater collection and transmission system consists of approximately 106 miles of gravity sewer, 13 miles of force I mains and 42 sewage lift stations. i F:\2001\ 01.0387. 000\Report\ doc R-4\041403 FINAL\ SEC l. HAI#01.0387. 000 1- 1 04/ 14/ 03 I I I I OKALOOSA COUNTY I N.T. S. I I I I I I I FORT WALTON BEACH WASTEWATER TREATMENT PLANT I rj/' RACETRACK ROAD g:j I 0..' Z I I I 1~ g r I= 9 9 I i:. HARTMAN _ & ASSOCIATES, INC. engineers, hydrogeo1ogists, survC)'OlS &: mmagement consultants LOCATION MAP FIGURE CITY OF FORT WALTON BEACH 128ISEMERALDCOASTPARKWAY. DBSTlN. FL32S~ SUITEl1()' WASTEW ATER FACILITIES PLAN 1- 1 831-9278 - FAX (850) 837. 7269 I TELEPIIDNE( 8So) IiII 1.3 SCOPE OF SERVICES The Scope of Services for this project is to prepare a WWTP Facilities Plan that will provide the City with the necessary guidance to plan and upgrade the City' s WWTP. The first deliverable for the City' s review is a Preliminary Draft Report focusing on the secondary treatment process ill of the WWTP. The second deliverable is a Final Draft Facilities Plan Report focusing on improvements to the entire WWTP and public access reuse system. Each report is comprised of I various tasks of our Scope of Services that include the following: I PRELIMINARY DRAFT REPORT I Data Collection. Review and Analysis: Compile and review data collected from the offices of the Florida Department of Environmental Protection ( FDEP), City I Public Works Department, and Northwest Florida Water Management District The data collected includes, but not be limited to, FDEP Discharge NWFWMD). Monitoring Reports ( DMRs) for the WWTP, WWTP design criteria, drawings I and engineering reports, and other relevant information. Evaluate the historical operations of the WWTP, reuse application and residuals management to t determine site specific flow criterion and raw sewage characteristics. Project customer connections for the next ten (10) years and the resulting sanitary sewer flows. Provide discussion text to describe and illustrate the evaluation findings. II Existing Wastewater System Evaluation: Review and provide an overview of the City' s wastewater treatment system including headworks, plant process water/pump station, grit removal, primary clarification, solids pumping and IW handling, residuals storage and stabilization, secondary treatment, secondary clarification, disinfection, filters and solids dewatering. The review of these I elements will consist of an inspection of each element and include observed problem areas or elements. I Perform an engineering and operations overview to encompass the WWTP' s I secondary treatment. The review of the WWTP will consist of the inspection of the secondary wastewater treatment process components, and include the modifications necessary to optimize the facility and/or meet the FDEP permitting I requirements. Instrumentation and automation review and modifications will be included in this task. I F:\2001\ 01.0387. 000\Report\ doc R-4\ 041403 FINAL\ SEC l. HAI#01.0387.000 1- 3 04/ 14/ 03 II i~ Ii fill Each process alternative shall be laid out and costs provided from a capital cost standpoint, and improvements necessary on the existing system. Evaluate as to site layout, need for property, need for construction easements, phasing of construction, and maintenance of operations. Preliminary Draft Facilities Plan Document: Provide copies of the Preliminary I Draft Facilities Plan documents to the City staff for review. A review meeting will be conducted to review the Preliminary Draft Facilities Plan document and I discuss any comments the City may have. As a result of the review meeting, the City' s comments will be incorporated and the Final Draft Report will be prepared I to include recommended improvements to the entire WWTP and the City' s public access reuse system. I FINAL DRAFT REPORT I Reclaimed Water and Effluent Disposal Evaluation: Review and provide modifications to the City' s reuse system. This includes pumping, storage and I distribution of reuse water at the City' s golf course. Additional recommendations are made, if warranted, regarding increasing the level of treatment. Address I agronomic concerns resulting from application of the reuse product. I Perform a preliminary assessment of expanding the City' s reuse system to the I fairgrounds, sports recreation facility, roadway medians and roadside open space, pi and one ( 1) other potential reuse customer/ destination. Assessment includes M II location maps and soils maps of the reuse sites, estimated loading rates, projected disposal rates and written narrative describing our analysis. I'.."'. t ~~ Residuals Stabilization and Disposal: Review the biosolids residuals regulations I with respect to the existing treatment and disposal practices, potential treatment processes and practices, and recommend and identify the stabilization and I disposal components necessary for future improvements. Recommendations focus on the City' s current practices at the WWTP ( stabilization, dewatering and disposal method, and potential alternative stabilization, I conveyance), current dewatering, conveyance, and disposal options with respective costs. I F:\2001\ 01.0387. 000\Report\ R-4\ 041403 FINAL\ SEC l. doc HAI#01.0387. 000 1- 4 04/ 14/ 03 II II I I I Economic Analysis: Conduct economic analyses on the alternatives developed in the Preliminary Draft Facilities Plan document. The economic analyses utilize a I." Ii Life Cycle" approach for the purpose of identifying the long- tenn cost effectiveness of each alternative. The Life Cycle approach consists of identifying I the total net present value of both capital and operating annual cash flows for each alternative. We utilized estimates of capital and operating cash flows developed for the purpose of this study, which may include but are not limited to upgrades, I refurbishments, equipment, appurtenances, engineering, capitalized financing costs, labor, power, chemicals, maintenance and renewals. The tenn and discount I rate for the Life Cycle analyses is consistent with financial policies and criteria commonly used and concurred by the City. In addition, one each Life Cycle I analysis alternative is shown based on expectation of grant( s) to reduce the City' s capital investment as necessary. I Wastewater System Capital Improvements Planning: Based on the results from the Preliminary Draft Report, detennine a capital improvement timeline for the I proposed planning period. The proposed planning period will be based on Fiscal Years beginning in October 1, 2003, and ending on September 30, 2008. Develop I a schedule for each secondary wastewater treatment option with proposed dates for beginning of construction and the date when the facility should be on- line. I. Show the preliminary opinion of cost of the facility in each option and with associated improvements to the pretreatment system, disinfection, residuals I management, and plant process pump station. Consult with the City for any additions, deletions or changes to the

Download this text file with its original spacing ↓