WORKSHOP MEETING AGENDA
CITY COUNCIL, CITY OF FORT WALTON BEACH
TUESDAY, APRIL 29, 2003... 5: 30 P.M.
CALL TO ORDER
1. Presentation on the Wastewater Treatment Plant Facilities Plan.
Public Works Director) ( CD 2002/01).
ADJOURN
Any person who decides to appeal any decision made with respect to any matter
considered at this meeting will need a record of the proceedings, and for such purpose
is made, which record
may need to ensure that a verbatim record of the proceedings
includes the testimony and evidence upon which the appeal is to be based. ( FS286. 0105).
The City of Fort Walton Beach adheres to the Americans with Disabilities Act and will
make reasonable modifications for access to this meeting upon request. Please call the City
Oerk, Helen Spencer, at 850-833- 9509, to make a request. For Hearing Impaired call the
800- 955-8771 (
1- or 1- 800- 955-8770 ( Voice).
City Hall TDD #833-9925, or fDD),
CITY OF FORT WALTON BEACH
MEMORANDUM
To: Reid Silverboard, City Manager
From: John Hofstad, Assistant Public Works Director
Through: Thomas Murray, Public Works Director
Date: April is, 2003
Subject: Wastewater Treatment Plant Facilities Plan
Background:
The City of Fort Walton Beach owns and operates a 4.5 million gallon per day (MGD) wastewater
small ourlying
treatment plant (WWTP) for processing sewage generated within the City and a few
areas. The facility opened in 1980 and was upgraded in 1992 with the addition of a tertiary filtration
Beach Golf Club. Other minor
system for providing irrigation water to the Fort Walton
made at that time for high- level disinfection and ponding control on the
improvements were
facility' s effluent sprayfield.
Several treatment technologies exist for sanitary sewage. The City' s current facility utilizes Rotating
Biological Contactors (RBCs) as its secondary treatment method for processing influent sewage.
Over the past several years, we have experienced significant problems with the RBC units, concrete
structures, mechanical equipment, and metal structures. An of these features are critical to the
For this reason, Staff recommended the
proper operation of a wastewater treatment facility.
development of a WWTP Facilities Plan to evaluate our existing system and identify future
improvements.
The Facilities Plan is a comprehensive document required by the Florida Department of
Environmental Protection (FDEP) and the State Revolving Fund program for permitting and
infrastructure improvements. Staff developed a Request for Proposal (RFP) for
funding utility
of
selecting an engineering :firm to prepare a WWTP Facilities Plan early last year. Upon completion
this process, Staff recommended awarding the Facilities Plan Study to Hartman & Associates
and awarded the
Incorporated (HAl)of Destin. Council concurred with this recommendation
28, 2002.
project to HAlon May
Discussion:
Since 1996, the City has invested nearly $ 1, 000, 000 in its treatment facility through a series of capital
improvement programs. This investment was required in order to maintain operations and
environmental compliance with the FDEP. If major renovations are not undertaken in the next few
Assessment of the capabilities of the existing WWTP' s secondary treatment
Alternative methods of upgrading the existing WWTP' s secondary treatment
Regulatory and other permitting requirements
Operation and Maintenance ( O& M)and Capital costs for the various operating and process
scenarios presented as alternative methods
Required renovations to anci1lary equipment and processes
Present worth analysis over the life of the proposed alternatives
Economic impacts on wastewater service area customers
HAl initially evaluated three treatment options for this planning effort against a set of scoring
criteria. One of the options,WesTech STM-Aerotor, did not score well in all areas and was
excluded from the final analysis. The two remaining options, Rehab Existing RBC facility and
Construct New Oxidation Ditch facility, are presented in the final Facilities Plan report as the most
desirable alternatives for the City. For the purpose of this discussion, Staff also considered the
possibilityof developing a regional facility with Okaloosa County to service both jurisdictions. This,
however, was not within the scope of services required of HAL
Rehabilitate Existing RBCs - The existing RBC facility will require extensive renovation
to meet today' s more stringent operating standards. HAl estimates this cost to be
2, 650, 000, another $1, 468, 750 in renovations to ancillary equipment for a total of
plus
4,118,750. The 30- year present worth for this alternative is estimated at $ 7, 094,366 and
includes the reinvestment of capital dollars at the end of the equipment' s useful life in the
fifteenth and twentieth years. All of the quoted costs include associated fees for engineering,
permitting, and contingency. The attractiveness of this option is its low upfront capital
cost.
are the reinvestment of capital dollars in years fifteen and
Conversely, the negatives high
in the future. RBC, or
twenty and the probability of more stringent effluent regulations
fixed- film, type facilities typically are not designed to achieve nutrient removal. Should the
Environmental Protection Agency pass more stringent effluent regulations for nutrients in
the future, this type of facility will require additional renovations.
Constroct New Oxidation Ditch Facility - HAl estimates the cost to dismantle the RBC
another $ 531, 250
facility and construct a new Oxidation Ditch facility to be $4,262, 500, plus
in renovations to ancillary equipment for a total of $4,793,750. The 30- year present worth
for this alternative is estimated at $6, 798, 997 and includes the reinvestment of capital dollars
at the end of the equipment's useful life in the fifteenth and twentieth years. All
of the
The
quoted costs include associated fees for engineering, permitting, and contingency.
Oxidation Ditch option provides a better long- term benefit to the City as less capital dollars
This is explained
are
required for reinvestment in out years as compared to the RBC facility.
than RBC facilities and,
by the fact that Oxidation Ditches have less mechanical equipment
therefore, future replacement costs are less. In addition, Oxidation Ditches of the type
recommended by this study are designed to achieve sufficient nutrient removal in the event
this type
regulations become more stringent in the future. The obvious negative pursuing
to
of facility over renovating the existing facility is the increase in up front capital dollars, which
is $ 675, 000 higher than for rehabilitating the existing RBCs.
is
Develop Regional Facility with Okaloosa County - Okaloosa County planning
to
build a new 9. 6 MGD facility to replace their aging 6. 5 MGD Gamier' s Treatment Plant.
to site this facility on the
Eglin' s Encroachment Committee has given conceptual approval
2
This proposed location
County's leased sprayfield located at the end of Roberts Boulevard.
is immediately east of the City' s current plant location on Percy L.Coleman Road.
of
Combining flows with the County at this location would require little in the way City
infrastructure improvements. Staff has expressed an interest in exploring the feasibility of
are currendy
combining with the County on a plant to service both needs. County personnel
staff the City with proportionate share costs for
working with their consulting to provide
Aside from capital
building a facility to accommodate this added flow requirement.
the is share proportionate amount of all associated
construction costs, City. expected to a
costs for the Environmental Assessment, Environmental Baseline Survey, and Unexploded
This information was unavailable at the time this report was prepared
Ord#nance Survey.
but will be provided as an attachment prior to the Council meeting date.
The City' s consulting engineers, HAl, are recommending in the Facilities Plan that the City proceed
with designing and pennitting an Oxidation Ditch facility to replace the existing RBC facility.
this the in the best position to handle its future needs, providing the
City
Certainly, option places
flexibility for addressing future regulatory concerns as well as capital reinvestment
concerns.
most
Detailed infonnation regarding a combined facility with Okaloosa County will be provided at a later
date, along with the completed WWfP Facilities Plan. Once direction is provided by Council,
Staffs intent is to fund the project with a State Revolving Fund loan through the Florida
Department of Environmental Protection.
Conclusion:
Staff requests City Council acceptance of the WWfP Facilities Plan as drafted by Hartman &