READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — September 24, 2015 — Agenda Packet — reading text
Part 12 of 47. These parts divide the reading text for browsing; they are not the source document's page numbers.
Agenda Packet — extracted reading text
Machine-extracted OCR text · Review label: Known limitations
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
FWBFort
AgmtWalton
for Landing
Beach
PROPOSED DESIGN
1.d.a
1.g.a
Packet Pg. 25
58
Attachment:I.I.g.
Attachment: d.City
FWBof FWB
Landing
Interlocal
Master for
Plan_PHASING (4118
Landing (4777 : City
: City
of of
FWBFort
AgmtWalton
for Landing
Beach
1.d.a
1.g.a
Attachment:I.I.g.
Attachment: d.City
FWBof FWB
Landing
Interlocal
Master for
Plan_PHASING (4118
Landing (4777 : City
: City
of of
FWBFort
AgmtWalton
for Landing
Beach
IMPROVEMENT PLAN
• Phase 1: Waterfront Improvements
• Estimated Cost = $1.6 Million
• Primary elements include performance stage, seawall, boardwalk,
dock improvements, and coastal ecology demonstration area
• Phase 2: Upland Interior Improvements
• Estimated Cost = $1.0 Million
• Primary elements include interactive water feature, park signage,
picnic areas, and parking area improvements
• Phase 3: Street Frontage Improvements
• Estimated Cost = $0.4 Million
• Primary elements include on street parking and pedestrian crossing
improvements
Packet Pg. 26
59
1.d.a
1.g.a
Attachment:I.I.g.
Attachment: d.City
FWBof FWB
Landing
Interlocal
Master for
Plan_PHASING (4118
Landing (4777 : City
: City
of of
FWBFort
AgmtWalton
for Landing
Beach
PHASE 1 IMPROVEMENTS
• Phase 1: Waterfront Improvements (Estimated Cost =
$1.6 Million)
• “The Bowl” Event Lawn
• Seating Terraces
• Renovated Boardwalk & Seawall
• Covered Performance Stage
• “Passive” Boat Launch Area
• Coastal Ecology Demonstration Area
• Design & Permitting
• Site Demolition
• Design & Permitting completed in FY 2015-16
• Demolition & Construction to begin in late FY 2015-16 with
completion in FY 2016-17
Packet Pg. 27
60
1.d.a
1.g.a
Attachment:I.I.g.
Attachment: d.City
FWBof FWB
Landing
Interlocal
Master for
Plan_PHASING (4118
Landing (4777 : City
: City
of of
FWBFort
AgmtWalton
for Landing
Beach
PHASE 1 COST BREAKDOWN
• Phase 1: Waterfront Improvements (Estimated Cost =
$1.6 Million)
• Engineering Design = $100,000
• Permitting = $25,000
• Site Demolition = $170,000
• Covered Performance Stage = $450,000
• Seating Terraces = $250,000
• Seawall = $320,000
• Boardwalk = $285,000
Packet Pg. 28
61
1.d.a
1.g.a
Attachment:I.I.g.
Attachment: d.City
FWBof FWB
Landing
Interlocal
Master for
Plan_PHASING (4118
Landing (4777 : City
: City
of of
FWBFort
AgmtWalton
for Landing
Beach
PHASE 1 FUNDING
• Phase 1: Waterfront Improvements (Estimated Cost =
$1.6 Million)
• City of Fort Walton Beach FY 2015-16 CRA Revenues = $125,000
