READ ALONGSIDE THE SOURCE

Okaloosa County BOCC — September 24, 2015 — Agenda Packet — reading text

Part 12 of 47. These parts divide the reading text for browsing; they are not the source document's page numbers.

Agenda Packet — extracted reading text

Machine-extracted OCR text · Review label: Known limitations

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

FWBFort AgmtWalton for Landing Beach PROPOSED DESIGN 1.d.a 1.g.a Packet Pg. 25 58 Attachment:I.I.g. Attachment: d.City FWBof FWB Landing Interlocal Master for Plan_PHASING (4118 Landing (4777 : City : City of of FWBFort AgmtWalton for Landing Beach 1.d.a 1.g.a Attachment:I.I.g. Attachment: d.City FWBof FWB Landing Interlocal Master for Plan_PHASING (4118 Landing (4777 : City : City of of FWBFort AgmtWalton for Landing Beach IMPROVEMENT PLAN • Phase 1: Waterfront Improvements • Estimated Cost = $1.6 Million • Primary elements include performance stage, seawall, boardwalk, dock improvements, and coastal ecology demonstration area • Phase 2: Upland Interior Improvements • Estimated Cost = $1.0 Million • Primary elements include interactive water feature, park signage, picnic areas, and parking area improvements • Phase 3: Street Frontage Improvements • Estimated Cost = $0.4 Million • Primary elements include on street parking and pedestrian crossing improvements Packet Pg. 26 59 1.d.a 1.g.a Attachment:I.I.g. Attachment: d.City FWBof FWB Landing Interlocal Master for Plan_PHASING (4118 Landing (4777 : City : City of of FWBFort AgmtWalton for Landing Beach PHASE 1 IMPROVEMENTS • Phase 1: Waterfront Improvements (Estimated Cost = $1.6 Million) • “The Bowl” Event Lawn • Seating Terraces • Renovated Boardwalk & Seawall • Covered Performance Stage • “Passive” Boat Launch Area • Coastal Ecology Demonstration Area • Design & Permitting • Site Demolition • Design & Permitting completed in FY 2015-16 • Demolition & Construction to begin in late FY 2015-16 with completion in FY 2016-17 Packet Pg. 27 60 1.d.a 1.g.a Attachment:I.I.g. Attachment: d.City FWBof FWB Landing Interlocal Master for Plan_PHASING (4118 Landing (4777 : City : City of of FWBFort AgmtWalton for Landing Beach PHASE 1 COST BREAKDOWN • Phase 1: Waterfront Improvements (Estimated Cost = $1.6 Million) • Engineering Design = $100,000 • Permitting = $25,000 • Site Demolition = $170,000 • Covered Performance Stage = $450,000 • Seating Terraces = $250,000 • Seawall = $320,000 • Boardwalk = $285,000 Packet Pg. 28 61 1.d.a 1.g.a Attachment:I.I.g. Attachment: d.City FWBof FWB Landing Interlocal Master for Plan_PHASING (4118 Landing (4777 : City : City of of FWBFort AgmtWalton for Landing Beach PHASE 1 FUNDING • Phase 1: Waterfront Improvements (Estimated Cost = $1.6 Million) • City of Fort Walton Beach FY 2015-16 CRA Revenues = $125,000

Download this text file with its original spacing ↓