READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — September 3, 2013 — Cell Phone Waiting Area Feasibility and Alternatives Analysis — reading text
Part 2 of 3. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — 164-Cell Phone Waiting Area Feasibility and Alternatives Analysis.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
airport. Additionally, the preliminary
budget does not include a contingency since this report evaluates the relative costs of the
four alternatives. A construction contingency of at least 25% is recommended to account for
unforeseen design or construction requirements which may be identified once design
begins.
Table 1: Preliminary Project Budget for Alternative No. 1
constr. Description Quantity Unit Price Total
A New Concrete Island 130 sy $50 $6,500
B Asphalt Removal 110 sy $10 $1,100
B,C Concrete Removal 80 sy $60 $4,800
D Removal of existing sidewalk canopy lump sum $8,000 $8,000
E Modification of vehicular markings lump sum $1,000 $1,000
F New asphalt pavement 100 sy $50 $5,000
G Cell Phone Waiting Area signage lump sum $2,000 $2,000
H FIDS message board and improvements lump sum $35,000 $35,000
H FIDS mounting structure lump sum $10,000 $10,000
H Communication and power to FIDS board 250 If $15 $3,750
| WiFi access point infrastructure lump sum $3,000 $3,000
Professional Design and Bidding Services lump sum $25,000 $25,000
Preliminary Budget: | $105,150
3.2 Alternative No. 2: North Loop Road
Alternative No. 2 represents areas along the existing terminal loop road north of the long-
term parking lot as depicted in Exhibit 3. This alternative adds 30 parallel parking spaces
on the north side of the road and allows vehicles to pass through on the left side of the road.
The current one-way road is approximately 20 ft wide and would be widened by 2 ft on the
north side to accommodate parallel parking along the north side of the road. The Okaloosa
County Land Development Code requires a minimum lane width of 12 ft adjacent to parallel
parking spaces and a width of 10 ft for the parallel parking space, requiring a total pavement
width of 22 ft. Concrete would be proposed for the new pavement due to the narrow width of
‘) { oKaLoosa county)
AIRPORTS
North
0 20 40
GRAPHIC SCALE iM FEET
ea
AVCON
AYCON, INC.
ENGINERRS & PLANNERS,
cee Cait WATE A MCRL BATES
CGrveck. anny Ue-anss ta an We-sean
FU CORTWCANE co msteomaATON WEEE Wd
wes
“Cals Prone wee REGRADE *CELL, PHONE MATS yr MELacATION OF “CELL, PHONE wAmINO
- OvEREAD FOS / ACCOMOOATE [ seen scmace (EvERY SHOULDER ° Soe ©asnG UTLTES (8) MEK SIGE (F)
| WESSAGE BOARD (H) PARALLEL PARKING (0) | 3 spaces). 1. (F) © _ 2 L [
NORTHWEST FLORIDA
REGIONAL AIRPORT
CELL PHONE WAITING
AREA FEASIBILITY AND
ALTERNATIVES ANALYSIS
—
8
bt
MATCHLINE - A
a
i
i
i
E
“ aoe none iene XL LONG TERM PARKING LOT
Fy
ALTERNATE NO. 2:
NORTH LOOP ROAD
(30 SPACES)
REDRADE SHALOER (C) 1 ‘|
H \E DESIGNED BY: IRC.
: - ORAWN BY: JAW.
eae O CHECKED BY: JRC.
APPROVED BY: Vie
DATE: SEPTEMBER 2013
! ; i ;
Let TOT tet Tt
3 ¢ —_——
MATCHLINE -A
AVCON PROJECT NO. 2013.00.05
J EXHIBIT 3
Cell Phone Waiting Area Feasibility and Alternatives Analysis
September 2013
the widening. Placing and compacting asphalt of this width would be difficult and the
appearance of this new asphalt would more than likely be poor. The new curbs will be
integral with the widening concrete because it would be economical from a construction
standpoint to extend the concrete to the edge of the existing road.
Several existing utilities may be affected by this
lane widening, including | underground
electrical, underground fiber optic
communications, and _ irrigation. Existing
utilities that would be affected are depicted in
Photos 4 and 5. Based on coordination with
airport staff, it is understood that the existing
fiber optic infrastructure is owned by Sprint and
serves as the primary trunk line for the airport.
This line also serves Eglin Air Force Base.
Relocation of this line may require moving it
approximately 2 ft to the north without cutting Rie re eee aes
the line if the line has enough slack to do so. Photo 3: Alternative No. 2
The relocation could be much more costly if the
line has to be cut and relocated. Fiber Optic Cable splices may also be functionally and
operationally unacceptable to the customer base. For these reasons, the preliminary project
budget for this task included in Table 2 assumes that the existing line would be relocated
without cutting.
This lane widening will require removal/relocation of the existing palm trees along the north
edge of the terminal loop road and modification of the existing concrete stormwater flumes.
A concrete stormwater flume is depicted in Photo 6.
Photo 6: Concrete
stormwater flume
Photo 4: Sprint fiber Photo 5: Gulf Power
optic utilities transformer
Concrete curb improvements are proposed on the east side of the parallel parking spaces to
organize the traffic into the left drive-through lane. The FIDS message board location is
proposed over the terminal loop road on the west end of the proposed parallel parking
spaces to provide visibility to all of the CWA parking spaces. However, the easternmost
parking space would be approximately 680 ft from the FIDS message board and may be
difficult to see from the easternmost spaces. The communication line improvements for the
Cell Phone Waiting Area Feasibility and Alternatives Analysis
September 2013
FIDS would be installed from the FIDS location to the existing fiber optic communication
panel location just west of the Credit Card Parking Lot entrance/exit. The run length for this
alternative is estimated at 550 If.
No new parking lot lighting is proposed as the proposed area has adequate lighting from the
existing parking lot along the south edge of the terminal loop road.
The proposed additional impervious area is approximately 1,400 sf which is less than the
impervious area threshold amount of 4,000 sf to trigger a state stormwater permit through
the Northwest Florida Water Management District. Therefore, no stormwater permit
application is anticipated with this alternative. The existing stormwater infrastructure will be
maintained, including concrete flumes and curb inlets, to convey stormwater to the existing
swale located north of the terminal loop road.
The infrastructure improvements for Alternative No. 2 generally include:
FOMMOOWD
and
Removal of existing concrete curb and relocation of existing palm trees,
Relocation of existing utilities and irrigation lines,
Shoulder grading and sodding,
Placement of new concrete pavement with integral concrete curbs,
Placement of pavement markings,
Placement of vehicular signage,
Modification of existing concrete stormwater flumes,
Installation of FIDS message board and communication and power infrastructure,
Installation of communication and WiFi access point infrastructure
A preliminary project budget for Alternative No. 2 is provided below in Table 2.
Table 2: Preliminary Project Budget for Alternative No. 2
oe Description Quantity Unit Price Total
A Removal of concrete curb 700 If $5 $3,500
A Removal of landscaping lump sum $5,000 $5,000
B Relocation of irrigation lines 750 If $8 $6,000
B Relocation of existing comm. utilities 750 If $5 $3,750
B Relocation of existing electrical utilities 750 If $5 $3,750
Cc Grading and sodding lump sum $10,000 $10,000
D New concrete pavement 150 sy $100 $15,000
D New concrete curb 725 If $25 $18,125
E New pavement markings lump sum $5,000 $5,000
G Modification of concrete flumes 2ea $300 $600
F New vehicular signage lump sum $4,000 $4,000
H FIDS message board and improvements lump sum $35,000 $35,000
H FIDS mounting structure lump sum $25,000 $25,000
H Communication and power to FIDS board 550 If $15 $8,250
| WiFi access point infrastructure lump sum $3,000 $3,000
Professional Design and Bidding Services lump sum $30,000 $30,000
Preliminary Budget: | $175,975
Cell Phone Waiting Area Feasibility and Alternatives Analysis
September 2013
3.3 Alternative No. 3: Terminal By-Pass Road
Alternative No. 3 utilizes the existing south lane of the three-lane terminal by-pass road to
provide 14 parallel parking spaces as depicted in Exhibit 4. Although the parking spaces
provided by this alternative are less than half of the desired 30 parking spaces for the CWA,
the existing concrete curb and asphalt pavement orientation is ideally set up to
accommodate parallel parking so no curb or asphalt modifications are required. Tubular
markers are recommended to highlight the existing crosswalks as identified in the exhibit.
The FIDS message board would be located on the east end of the parking area to provide
visibility to all of the CWA users and is positioned to straddle the existing sidewalk. A clear
height of 8 ft from the bottom of the message board to the sidewalk is recommended so the
existing sidewalk remains unobstructed and still accessible to pedestrians. The FIDS
message board is approximately 450 ft from the westernmost parking space so it may be
difficult to see from these spaces. The communication improvements for the FIDS are
proposed to run from the existing fiber optic infrastructure at the Baldwin Building to the
FIDS message board. The estimated length of the cable run length is approximately 175 If.
No new parking lot lighting is proposed since the area is illuminated by existing parking lot
lights along the north side of the terminal by-pass road.
This alternative would require that drivers make an entire loop around the terminal loop road
to access the airport terminal. The development time and cost appears to be minimal for
this alternative due to the relatively limited infrastructure improvements.
Photo 7: Alternative No. 3 from east Photo 8: Proposed location of FIDS
message board
The infrastructure improvements for Alternative No. 3 generally include:
Removal of existing “STOP” markings in south lane,
Installation of new pavement markings,
Installation of tubular markers,
Installation of FIDS message board and communication and power infrastructure,
and
Installation of communication and WiFi access point infrastructure
9OW>
m
ball)
North
r 20 40
GRAPHIC SCALE IN FEET
errd
NOW PAVEMENT
MARINGS, TYP. (B)
OKALOOSA COUNTY )
AIRPORTS
AVCON, INC.
NORTHWEST FLORIDA
REGIONAL AIRPORT
CELL PHONE WAITING
AREA FEASIBILITY AND
ALTERNATIVES ANALYSIS
ALTERNATE NO. 3:
TERMINAL BYPASS
ROAD (14 SPACES)
DESIGNED BY: JRC.
DRAWN BY: JAW.
CHECKED BY: JRC.
APPROVED BY: vow
DATE: SEPTEMBER 2013,
AVCON PROJECT NO. 2013.050.05
EXHIBIT 4
Cell Phone Waiting Area Feasibility and Alternatives Analysis
September 2013
A preliminary project budget for Alternative No. 3 is provided below in Table 3.
Table 3: Preliminary Project Budget for Alternative No. 3
Constr. Description Quantity Unit Price Total
A Marking removal lump sum $5,000 $5,000
B Place pavement markings lump sum $2,000 $2,000
Cc Tubular markers 16 markers $100 $1,600
D FIDS message board and improvements lump sum $35,000 $35,000
D FIDS mounting structure lump sum $10,000 $10,000
D Communication and power to FIDS board 175 If $15 $2,625
E WiFi access point infrastructure lump sum $3,000 $3,000
Professional Design and Bidding Services lump sum $25,000 $25,000
Preliminary Budget: $84,225
3.4 Alternative No. 4: East Loop Road
Alternative No. 4 proposes a new parking area on the east side of the terminal loop road in a
currently landscaped area as identified in Exhibit 5 and depicted in Photos 9 and 10.
Alternative No. 4 includes two variations (4A and 4B) with each variation providing a slightly
different parking layout. Each variation is analyzed separately below.
Alternative No. 4A provides 16, 45-degree parking spaces which are less than the desired
number of 30 parking spaces. A 3-ft wide concrete island is proposed to separate the traffic
on the terminal loop road from the parking activities of the CWA users. The Okaloosa
County Land Development Code requires a 12-ft wide access aisle adjacent to 45-degree
parking stalls, as depicted in the exhibit.
Several existing utilities have been identified in this area which include fiber optic
communication lines, irrigation lines, Sprint communication lines, and electrical transformer
and underground power lines. The irrigation control