READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — April 21, 2015 — FleetCo First Amendment — reading text
Part 1 of 1. These parts divide the reading text for browsing; they are not the source document's page numbers.
FleetCo First Amendment — extracted reading text
Machine-extracted OCR text · Review label: Known limitations
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
FIRST AMENDMENT TO
CONTRACT WITH SPECIALTY VEHICLES SOUTHEAST, INC,
D/B/A FLEETCO, INC, (C15-2286-GM)
This, FIRST AMENDMENT, which shall be effective upon the signature of both parties,
amends Agreement C15-2286-GM with Specialty Vehicles Southeast, Inc, D/B/A FleetCo, Inc.
(the “Vendor™), and Okaloosa County, Florida (the “County™).
WHEREAS, on March 5, 2015, the County and the Vendor entered into Agreement C15-2286-
GM for refurbishment of two (2) trolleys (the “Agreement”); and
WHEREAS, the County was aware that once the project was underway that the tear down of the
trolleys could reveal hidden damage that the onsite inspection would not have exposed; and
WHEREAS, this hidden damage has resulted in additional costs due to additional work beyond
those specified; and
NOW THEREFORE, for good and valuable consideration, the sufficiency of which is
acknowledged by all parties, the County and the Vendor do agree as follows:
I. Agreement C15-2286-GM is hereby amended to reflect that the price for the
refurbishment of the trolleys is amended to be $195,843.50.
2. The letter dated from FleetCo, dated April 9, 2015, shall be included in this amendment
as Exhibit A.
3. All other provisions of Agreement C15-2286-GM, as subsequently amended, shall
remain in full force and effect.
IN WITNESS WHEREOF, the parties have executed this FIRST AMENDMENT as of the
last written below.
BOARD OF COUNTY COMMISSIONERS SPECIALTY VEHICLES
SOUTHEAST,INC. D/B/A FLEETCO,
INC.
\
BY: : r
Nathan D. Boyles, as Chairman PRINT NAME: 1.3 o&a E S risClions
DATE: DATE: q/ / ‘// 15
WITNES o
ATTEST:
CLERK OF THE CIRCUIT COURT
BY:
J. D. Peacock
Clerk of the Circuit Court
685 Broad Street Pensacola, FL 32534
850-477-7645 - 800-335-3287- Fax 850-478-6891
Email- johnbris@fleetco-specialty.com
Web Site - www.fleetco-specialty.com
April 9, 2015
Elliot L. Kampert, AICP; Director
Okaloosa County Growth Management Department
1804 Lewis Turner Blvd Suite 200
Ft Walton Beach, FL 32547
850-651-7180
Dear Mr, Kampert;
This letter is to confirm hidden damage discovered while tearing down and refurbishing the trollies. Several emails have been sent with
pictures showing damage. This damage was discovered after the floor and roof were removed. The main areas of considerable structural
damage are as follows;
I. Rear area at wheelchair lift and rear wheel house boxes structural frame across entire body is completely rusted thru. These are
basically portions of the body frame that rest on the chassis. The main support for the structure. It is necessary to replace the structural
steel tubing and frame members. These areas will be coated with a rust inhibiting primer and painted.
2. The wheelhouse area at front curbside is rusted thru as described above. It is necessary to replace the structural steel tubing and frame
members, These areas will be coated with a rust inhibiting primer and painted.
3. The area behind the driver’s area has rust in similar areas, but not as severe as the other side. These areas can be plated and
strengthened. These areas will be coated with a rust inhibiting primer and painted.
4, The plywood roof underlayment rotted from the water leaks, It is necessary for the plywood to be replaced. The rotted plywood will
be removed and replaced. The individual panels are cut and placed between tubing panels as shown in the attached pictures.
These repairs are necessary at they make up the structural integrity of the vehicle.
The additional costs are as follows;
1. Labor and material for frame structural replacement front and rear areas, Prime and paint, $5,644.00 per unit,
2. Labor and materials to remove and replace 16 sheets of plywood underlayment under roof skin, Cut individual panels to fit between
structural members. - $2,959.00 per unit
Total cost $8,603.00 per unit
Total cost both trolleys — $17,206.00
Total cost with original contract -$97,921.75 each
Total Cost -$195,843.50
Pictures Attached.
These areas are open for inspection and pictures are available. [ have included some pictures in the accompanying attachment,
Yours truly
John Briscione
President
Exhibit "A"
