within four (4) months
Walton Beach should range between $ 10, 000 and $ 20, 000 and be completed
or less from the date of the Notice to Proceed.
MRD Associates. Inc. Fee Schedule Choctaw En~lineerina. Inc. Fee Schedule
125/ hour Principal $ 110/ hour
Principal Engineer 80/hour
Staff Engineer 70/ hour Registered Engineer $
50/ hour Project Manager $ 65/hour
Engineering Technician 40/ hour
Administrative 30/ hour Administration $
Reimbursable Expenses x1. 05 cost Registered Land Surveyor $ 65/ hour
Environmental Specialist $ 55/ hour
Project Engineer $ 55/ hour
Advanced Environmental Technoloaies. LLC
Technician $ 55/ hour
Project Coordinator $ 40/hour
Senior Wetland Scientist $ 85/ hour
Drafter $ 40/ hour
Two- man Field Crew $ 80/ hour
Three- man Field Crew $ 100/ hour
mrd associates, inc. 12-
Fort Walton Beach Landings Marina
Feasibility Study
Section 3. 0. PROdECT APPROACH
3. 1. Marina Feasibility Study
and Condition
The Marina Feasibility Study investigation will consist of four ( 4) parts: 1) Bathymetric
3) Marina Feasibility Assessment and
Survey; 2) Preliminary Environmental Impact Assessment;
to of Fort Walton Beach. This
Conceptual Design; and, 4) Marina Feasibility Report and Presentation City
Beach with the information to make informed
project approach provides the City of Fort Walton necessary
with the City
This of work will be refined
decisions toward advancing a transient docking facility. scope
of Fort Walton Beach during contract negotiations.
The hydrographic and the water quality sampling, analysis and reporting were
moved from the Marina
to the Environmental and Design
Feasibility Study phase ( as outlined in the Request for Proposals)
Studies phase. Although this is important information toward obtaining permits,
it is the Project Team' s
experience in Santa Rosa Sound and Choctawhatchee Bay
that water quality or the flushing capacity of
Based experience, the water body should
the waterbody should not result in the denial of a permit. on our
issues in Santa Ro~ nd regarding high
meet DEP' s flushing standards. There has been water quality
However, by providing a sewage pu~ put .~ tion and/ or using
levels of fecal coliforms and copper.
into the waterbody. These studie~~ intended to identify
concrete piles will reduce copper leaching
and that require mitigation or corrective action in the project's design.
environmental issues problems may
3. 1. 1. Bathymetric and Condition Survey
Inc. The purpose
The bathymetric and condition survey will be performed by Choctaw Engineering,
within the proposed project site. The survey will:
of the survey is to document existing conditions
location, and existing
a.) identify existing structures within and adjacent to the project
location
channel markers within the survey limits. The bathymetric survey will include:
NGVD29; and, extend
of the mean high water ( MHW) line; depths referenced 0. 0
and from the MHW to the ICWW
approximately 100 feet east and west of the project,
Federal navigation channel); upland utilities;
and
b.) be used in the development of the permit drawings, hydrodynamic and flushing study
provide the necessary information to be included in the State of Florida Submerged
Lands Lease; and,
the State of Florida
c.) be signed and sealed by a Professional Land Surveyor registered in
and be provided in ACAD.
3. 1. 2. Environmental Impact Assessment ( EIA)
assessment of the
Advanced Environmental Technologies, L.L.C. will conduct a preliminary
environmental resources typical of the area
potential impacts of the proposed project upon existing
or oyster beds will be mapped
such as sea grasses, oysters, benthic organisms. Sea grasses and/
so sediment samples will
and a summary of the findings will be prepared. Dredging is not anticipated
benthic macro invertebrates.
not need to be collected and analyzed for grain size distribution
or
3. 1. 3. Marina Feasibility Assessment and Conceptual Marina Site Plan
dock facility and develop a marina
The purpose of this section is to assess the feasibility of a transient
to permitting and design.
site plan to be presented to the City of Fort Walton Beach and advance
MRD Associates, Inc. will:
Goals and Obiectives
of the project;
a.) meet with the City of Fort Walton Beach to discuss the goals and needs
mrd associates, inc. 13-
Fort Walton Beach Landings Marina
Feasibility Study
Existina Facilities and Future Plans
b.) review existing waterside and upland facilities that may be used to support the docks;
c.) review proposed future improvements of the area and the Landings;
Proposed Facilities and Utilities
d.) assess the need for marina utilities and upland facilities to support
the transient marina;
e.) assess methods of ways to collect slip fees. Will it be advised to employ a Dock Master,
use collection meters or other methods? If a Dock Master is desirable, what facilities will
be needed? What are the costs?
assess the need of upland amenities ( Le., laundry, showers, etc.) to support
the faciiity;
f.)
Pump- Out Facilities
assess alternative pump- out facilities to determine the type system that should
be used,
g.)
of costs for construction and maintenance, and investigate
provide an opinion probable
the potential of
if mandatory pump-out may be required to stay at the facility to reduce
illegal discharge;
Fundina Sources
to
h.) investigate and document potential funding sources - state and federal grants
construct and maintain the facility. For example, the grants may be available through the
State of Florida for "Clean Vessel Station Projects" ( sewage pump- out facilities) ranging
from $ 1, 500 to $ 30, 000 depending on the need of the area.
Permit Feasibility
L) assess the feasibility of obtaining the necessary state and federal authorizations
for this
issues that will need to be
facility. The assessment will include potential permitting
resolved during the permitting process;
Conceptual Marina Site Plan
the
bathymetric survey and