READ ALONGSIDE THE SOURCE

Fort Walton Beach Council agenda — 10-14-03 regular Council agenda — reading text

Part 53 of 77. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — fwb-9771-original.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

Associates, Inc. representative experience with marina projects requested under the Request for Proposals - Fort Walton Beach Mar;na are as follows: Destin West Yacht Harbour, Okaloosa Island, Florida 100 slip marina 300 slip marina expansion Baytowne Marina, Sandestin, Florida Marbella Yacht Club, Destin Harbor, Florida 60 slip marina East Pass Yacht Club, Destin, Florida 40 slip marina Port St.Joe Marina, Gulf County, Florida dry municipal marina 180 wet/ Galati Yachts, Destin Harbor, Florida 12 slip sales facility Un. named Resort Marina, Turks and Caicos, B. W.\. 100 slip marina Harbor Walk Marina, Destin, Okaloosa County, Florida 49 slip marina 150 slip marina Bayside Marina Complex, Shalimar, Florida Sabal Bay Marina, Naples. Collier County, Florida 400 wet/ dry slip marina Bonita Beach Club Marina, Collier County, Florida 24/ 90 wet/dry slip marina mrd associates, inc. 3- Feasibility Study Fort Walton Beach Landings Marina 2.2.2. Hydrographic (Circulation and Pollutant Transport Studies) Surveys Michael R. Dombrowski, P. E. has conducted more than 20 hydrographic ( circulation and pollutant transport) surveys over the past 10- years. These studies have included field investigations and applied models to document existing conditions and predict potential changes in water Girculation patterns and assess the of the waterway to flush a potential pollutant to 10% of the initial potentipl concentration within a 4- day period to meet DEP permit requirements. MRD Associates, Inc. has the background and experience with a variety of hydrodynamic, sediment transport and water quality numerical models including: AQUASEA - 2- D hydrodynamic and water quality RMA2 - 2- D estuarine and coastal hydrodynamics RMA4 - 2- D water quality transport SED2 - sediment transport MRD Associates, Inc. representative experience with hydrographic surveys requested under the Request for Proposals - Fort Walton Beach Marina are as follows: Marsh Harbor, Santa Rosa Sound, Fort Walton Beach, Florida Fountainhead Condominium Docking Facility, The Narrows, Fort Walton Beach, Florida Brooks Bridge Marina, Choctawhatchee Bay, Okaloosa Island, Florida Destin West Yacht Harbour, Choctawhatchee Bay, Okaloosa Island, Florida East Pass Yacht Club, Choctawhatchee Bay, Destin, Florida Perdido Key Water Club, Old River, Perdido Key, Florida Cornwell Dock Addition, Boggy Bayou, Niceville, Florida Mahr Boat Basin, Sikes Cut, St. George Island, Florida Mercury Marine Testing Facility (2), Milton and Bay County, Florida 2. 2. 3. Bathymetric and Submerged Lands Lease Surveys Choctaw Engineering, Inc. has conducted topographic, bathymetric and condition surveys, and prepared submerged lands lease surveys for many clients in Northwest Florida. Projects of the bathymetric and submerged lands lease services requested under the Request representative for Proposals - Fort Walton Beach Marina are as follows: Fort Walton Yacht Club, Fort Walton Beach Submerged Land Lease Survey Emerald Coast Boat Show, Fort Walton Beach Submerged Land Lease Survey Harbor Cottages, Destin Bathymetric Survey Galati Yacht Sales, Destin Bathymetric Survey Submerged Land Lease Survey Falling Waters, Mary Esther Bathymetric Survey Submerged Land Lease Survey Cornwell Dock Addition, Niceville Bathymetric Survey Submerged Land Lease Survey Marbelia Yacht Club, Destin Submerged Land Lease Survey Ben' s lake Marina, Eglin Air Force Base Submerged Land Lease Survey Destin West Yacht Harbour, Okaloosa Island Bathymetric Survey Submerged Land Lease Survey Sea Breeze, Fort Walton Beach Submerged Land Lease Survey Rum Island Docks, Mary Esther Submerged Land Lease Survey Brooks Bridge Marina, Okaloosa Island Bathymetric Survey Submerged Lands Lease Survey laguna landing, Fort Walton Beach Submerged Lands Lease Survey mrd associates, inc. 4- Feasibility Study Fort Walton Beach Landings Marina 2.2. 4. Civil Engineering Experience in the Brooks Street Area Choctaw Engineering, Inc. has completed numerous civil engineering projects along Brooks Street that will assist in the development of the feasibility study by providing the necessary information on existing and proposed infrastructure, and site conditions. Projects representative of the civil engineering that may be necessary under the Request for Proposals - Fort Walton Beach Marina are as follows: MTM Development, Mean High Water Line ( MHWL) SlIrvey 340 A&B Brooks Street, FEMA Flood Elevation Certificate Talesin South Lot 7, FEMA Flood Elevation Certificate Henderson Property, Wetland Delineation/ USACE Wetland Line Verification Richard Ullrich Property, Topographic and MHWL Survey The Wade Building, Site Engineering and Permitting 304 Brooks Street, FEMA Flood Elevation Certificate Miramar Place Phase I, Phase I Environmental Site Assessment Camp Walton Hall, Site Design and Engineering, Surveying, FOOT Permits Camp Walton Hall Docks, DEP/uSACE Permitting and Submerged Land Lease Sprint Telephone, Right of Way Stake Out - Brooks Street Angela Snowball, Topographic and Boundary Survey Camp Walton Village, Engineering, Surveying, Permitting, Submerged Land Lease Indlanola Inn Site Engineering, Environmental Services, and Surveying Kirksey Property, Traffic Analysis, Water, Sewer, Stormwater Concurrency Miramar Place, As-built of Water and Sewer Facilities Water Mark, Boundary and Topographic Survey, Engineering and Site Improvement Plans; Water, Wastewater and Stormwater Management Plan 2. 3. Past Performance Destin West Yacht Harbour Mr. Bill Kreuser Tolbert Bayslde Development Company 1500 Miracle Strip Parkway S. E. Fort Walton Beach, Florida 32548 850. 243. 9161 voice 850. 243. 5166 fax Baytowne Marina Mr. Russ Scott Beach & Marina Manager Intrawest Sandestin Resorts, Inc. 9300 Emerald Coast Parkway West Sandestin, Florida 32550 850.428. 0079 voice 850. 267. 8178 fax East Pass Yacht Club Mr. Robert G. Reid Crystal Shores Development 30 Moreno Point Road, Suite 203A Destin, Florida 32541 850. 654.4935 voice 850. 654.4930 fax Galati Yacht Sales Facility Mr. Joseph Galati Galati Brothers of Florida, Inc. 314 Highway 98, Suite 104 Destin, Florida 32541 850. 654. 1575 voice 850. 654. 1306 fax mrd associates, inc. 5- Feasibility Study Fort Walton Beach Landings Marina 2.4. Kev Personnel Michael R. Dombrowski, P. E. will be the point of contact between the Project Team and the City of Fort Walton Beach. He will serve as Project Manager for the contract and perform all planning and engineeringrelated with the marina. He will coordinate activities and projects among the Project Team. Michael is President of MRD Associates, Inc. and is located in Destin, Florida. Michael holds a current Professional Engineer registration in Florida, Alabama, Mississippi and Louisiana. The key personnel at Choctaw Engineering, Inc. have extensive civil engineering, environmental, and surveying experience in the Brooks Street area as well as throughout Northwest Florida. Choctaw Engineering, Inc. will conduct thebathymetric and condition surveys; prepare the State of Florida submerged land lease survey; and, provide any upland civil engineering services. Mr. Mark Siner, P .E. is President of Choctaw Engineering, Inc. He joined our firm in 1997, bringing a wide variety of experience to the firm. Since coming to Choctaw Engineering, Inc., Mr. Siner has been the Project Engineer for numerous civil engineering projects along Brooks Street including site design, water and sewer and design, stormwater management and grading plans. Mr. Siner planning holds a current

Download this text file with its original spacing ↓