READ ALONGSIDE THE SOURCE
Fort Walton Beach Council agenda — 10-14-03 regular Council agenda — reading text
Part 53 of 77. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-9771-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
Associates, Inc. representative experience with marina projects requested under the Request
for Proposals - Fort Walton Beach Mar;na are as follows:
Destin West Yacht Harbour, Okaloosa Island, Florida 100 slip marina
300 slip marina expansion
Baytowne Marina, Sandestin, Florida
Marbella Yacht Club, Destin Harbor, Florida 60 slip marina
East Pass Yacht Club, Destin, Florida 40 slip marina
Port St.Joe Marina, Gulf County, Florida dry municipal marina
180 wet/
Galati Yachts, Destin Harbor, Florida 12 slip sales facility
Un. named Resort Marina, Turks and Caicos, B. W.\. 100 slip marina
Harbor Walk Marina, Destin, Okaloosa County, Florida 49 slip marina
150 slip marina
Bayside Marina Complex, Shalimar, Florida
Sabal Bay Marina, Naples. Collier County, Florida 400 wet/ dry slip marina
Bonita Beach Club Marina, Collier County, Florida 24/ 90 wet/dry slip marina
mrd associates, inc. 3-
Feasibility Study Fort Walton Beach Landings Marina
2.2.2. Hydrographic (Circulation and Pollutant Transport Studies) Surveys
Michael R. Dombrowski, P. E. has conducted more than 20 hydrographic ( circulation and pollutant
transport) surveys over the past 10- years. These studies have included field investigations and
applied models to document existing conditions and predict potential changes in water Girculation
patterns and assess the of the waterway to flush a potential pollutant to 10% of the initial
potentipl
concentration within a 4- day period to meet DEP permit requirements. MRD Associates, Inc. has
the background and experience with a variety of hydrodynamic, sediment transport and water quality
numerical models including:
AQUASEA - 2- D hydrodynamic and water quality
RMA2 - 2- D estuarine and coastal hydrodynamics
RMA4 - 2- D water quality transport
SED2 - sediment transport
MRD Associates, Inc. representative experience with hydrographic surveys requested under the
Request for Proposals - Fort Walton Beach Marina are as follows:
Marsh Harbor, Santa Rosa Sound, Fort Walton Beach, Florida
Fountainhead Condominium Docking Facility, The Narrows, Fort Walton Beach, Florida
Brooks Bridge Marina, Choctawhatchee Bay, Okaloosa Island, Florida
Destin West Yacht Harbour, Choctawhatchee Bay, Okaloosa Island, Florida
East Pass Yacht Club, Choctawhatchee Bay, Destin, Florida
Perdido Key Water Club, Old River, Perdido Key, Florida
Cornwell Dock Addition, Boggy Bayou, Niceville, Florida
Mahr Boat Basin, Sikes Cut, St. George Island, Florida
Mercury Marine Testing Facility (2), Milton and Bay County, Florida
2. 2. 3. Bathymetric and Submerged Lands Lease Surveys
Choctaw Engineering, Inc. has conducted topographic, bathymetric and condition surveys, and
prepared submerged lands lease surveys for many clients in Northwest Florida. Projects
of the bathymetric and submerged lands lease services requested under the Request
representative
for Proposals - Fort Walton Beach Marina are as follows:
Fort Walton Yacht Club, Fort Walton Beach Submerged Land Lease Survey
Emerald Coast Boat Show, Fort Walton Beach Submerged Land Lease Survey
Harbor Cottages, Destin Bathymetric Survey
Galati Yacht Sales, Destin Bathymetric Survey
Submerged Land Lease Survey
Falling Waters, Mary Esther Bathymetric Survey
Submerged Land Lease Survey
Cornwell Dock Addition, Niceville Bathymetric Survey
Submerged Land Lease Survey
Marbelia Yacht Club, Destin Submerged Land Lease Survey
Ben' s lake Marina, Eglin Air Force Base Submerged Land Lease Survey
Destin West Yacht Harbour, Okaloosa Island Bathymetric Survey
Submerged Land Lease Survey
Sea Breeze, Fort Walton Beach Submerged Land Lease Survey
Rum Island Docks, Mary Esther Submerged Land Lease Survey
Brooks Bridge Marina, Okaloosa Island Bathymetric Survey
Submerged Lands Lease Survey
laguna landing, Fort Walton Beach Submerged Lands Lease Survey
mrd associates, inc. 4-
Feasibility Study Fort Walton Beach Landings Marina
2.2. 4. Civil Engineering Experience in the Brooks Street Area
Choctaw Engineering, Inc. has completed numerous civil engineering projects along Brooks Street
that will assist in the development of the feasibility study by providing the necessary information on
existing and proposed infrastructure, and site conditions. Projects representative of the civil
engineering that may be necessary under the Request for Proposals - Fort Walton Beach Marina are
as follows:
MTM Development, Mean High Water Line ( MHWL) SlIrvey
340 A&B Brooks Street, FEMA Flood Elevation Certificate
Talesin South Lot 7, FEMA Flood Elevation Certificate
Henderson Property, Wetland Delineation/ USACE Wetland Line Verification
Richard Ullrich Property, Topographic and MHWL Survey
The Wade Building, Site Engineering and Permitting
304 Brooks Street, FEMA Flood Elevation Certificate
Miramar Place Phase I, Phase I Environmental Site Assessment
Camp Walton Hall, Site Design and Engineering, Surveying, FOOT Permits
Camp Walton Hall Docks, DEP/uSACE Permitting and Submerged Land Lease
Sprint Telephone, Right of Way Stake Out - Brooks Street
Angela Snowball, Topographic and Boundary Survey
Camp Walton Village, Engineering, Surveying, Permitting, Submerged Land Lease
Indlanola Inn Site Engineering, Environmental Services, and Surveying
Kirksey Property, Traffic Analysis, Water, Sewer, Stormwater Concurrency
Miramar Place, As-built of Water and Sewer Facilities
Water Mark, Boundary and Topographic Survey, Engineering and Site
Improvement Plans; Water, Wastewater and Stormwater
Management Plan
2. 3. Past Performance
Destin West Yacht Harbour Mr. Bill Kreuser
Tolbert Bayslde Development Company
1500 Miracle Strip Parkway S. E.
Fort Walton Beach, Florida 32548
850. 243. 9161 voice 850. 243. 5166 fax
Baytowne Marina Mr. Russ Scott
Beach & Marina Manager
Intrawest Sandestin Resorts, Inc.
9300 Emerald Coast Parkway West
Sandestin, Florida 32550
850.428. 0079 voice 850. 267. 8178 fax
East Pass Yacht Club Mr. Robert G. Reid
Crystal Shores Development
30 Moreno Point Road, Suite 203A
Destin, Florida 32541
850. 654.4935 voice 850. 654.4930 fax
Galati Yacht Sales Facility Mr. Joseph Galati
Galati Brothers of Florida, Inc.
314 Highway 98, Suite 104
Destin, Florida 32541
850. 654. 1575 voice 850. 654. 1306 fax
mrd associates, inc. 5-
Feasibility Study Fort Walton Beach Landings Marina
2.4. Kev Personnel
Michael R. Dombrowski, P. E. will be the point of contact between the Project Team and the City of Fort
Walton Beach. He will serve as Project Manager for the contract and perform all planning and
engineeringrelated with the marina. He will coordinate activities and projects among the Project Team.
Michael is President of MRD Associates, Inc. and is located in Destin, Florida. Michael holds a current
Professional Engineer registration in Florida, Alabama, Mississippi and Louisiana.
The key personnel at Choctaw Engineering, Inc. have extensive civil engineering, environmental, and
surveying experience in the Brooks Street area as well as throughout Northwest Florida. Choctaw
Engineering, Inc. will conduct thebathymetric and condition surveys; prepare the State of Florida
submerged land lease survey; and, provide any upland civil engineering services.
Mr. Mark Siner, P .E. is President of Choctaw Engineering, Inc. He joined our firm in 1997, bringing
a wide variety of experience to the firm. Since coming to Choctaw Engineering, Inc., Mr. Siner
has
been the Project Engineer for numerous civil engineering projects along Brooks Street including site
design, water and sewer and design, stormwater management and grading plans. Mr. Siner
planning
holds a current
