READ ALONGSIDE THE SOURCE
Fort Walton Beach Council agenda — 10-14-03 regular Council agenda — reading text
Part 50 of 77. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-9771-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
of the applicant' s education, experience,
and contribution to wetland science.
Certified Prescribed Burn Manager - the Florida Department of Agriculture awards
this certification to applicants qualified to utilize prescribed fire in the state of
Florida.
Page: 10
Marv Hartshorn
As a Ecological Consuhant, Ms. Hartshorn prepares and manage Wetland Enviromnenta1 Resource
Permit Applications; Prepare and manage State Land Authorization Applications for marinas and
famBy docking facilities; DeEneate Army Corps of Engineers & Florida Department of
muJti.-
Environmmtal Protection wet1and lines; Assess function & value of wetlands for wat~ quality and
wildlife habitat value; Assess sites for the presence of endangered and threatened species and their
mitoring reports;Qualified Stonnwater Management Inspector;
habitat; Prepare mitigation plans and m:
Conduct various rreeti:ngs with clients and governmental agencies; Assist clients in plarming
development in an enviromnenta1 sensitive mann~ w1n1e allowing reasonable returns on their
investrrents
BULLOCK TICE ASSOCIATES
Jason Scarbrou2:h. Refrlstered Architect
Mr. Jason Scarbrough has gained experience in a variety of project types, ITom building
additions/ renovations to highly technical facilities. He recently managed several projects
through schematic design, design development, cost estimates, construction documents,
and contract administration. His exposure to different project types helps him adapt to
any type of facility. Mr. Scarbrough is proficient in computer- aided drafting ( CADD),
Metric and Imperial Units, Cost Estimating, Detailing, Design, Code Research and
Management. He is also familiar with MCACES.
Mr. Scarbrough' s project experience includes:
Smithsonian Tropical Research Institute
Gamboa Dock - Facility consisting of a fix to pier and several floating piers to
support research vessels and ferries.
Naos Dock - Facility consisting of a fixed and floating pier with roUing ramps to
support a large research vessel. A floating breakwater was also constructed along
with large jib crane on the fixed pier.
Barro Colorado Island Dock - Facility consisting of covered floating piers to
support research, supply vessels, and ferries.
POL Off-Loading Marine Terminal Pier, Hulburt Field,FL
REGISTRATION:
1998/ Architecture #0016352 Florida
Page: 11
@ FABRE ENGINEERING, INC.
PROJECT APPROACH
1. Project Purpose and Scope:
To evaluate the feasibility of development of a
25- slip marina facility extending into Santa
Rosa Sound : trom the Fort Walton Beach
Landing property. The Study will include an
evaluation of the environmental impact of the
proposed project to surrounding properties, a
hydrographic survey with location of
submerged grass beds, a submerged lands
survey of the area for the proposed marina,
water quality sampling, an evaluation of permitting difficulty and cost and a construction
cost estimate for a concrete, floating- dock facility with power, lighting and water for small
to medium size, transient, private vessels and a wastewater pump- out station.
II. Tasks:
1. Kick off meeting with City Staff and interested members of the City Council.
2. Pre- application conference with representatives of the Department of
Environmental Regulation and the Corps of Engineers.
3. Development of a Project Schedule and submission to City Project Manager.
The project should be completed within three ( 3) months.
4. Hydrographic Survey
5. Water Quality Testing .
6. Development of up to three marina layouts with a Dockmaster Building and a
Pump out Station and
presentation to City.
7. Evaluation of the
environmental' impact and
permitability of the selected
plan.
8. Preparation of an Opinion of
Probable Project Cost with
permitting, design, and
construction costs identified.
9. Preparation and Presentation of
Final Report to City Project
Manager.
10. Incorporate Comments
11. Presentation of Final Report to City Council.
Page: 12
18 8 8 8 8 8 8 8 8
d
g
0\
I-
g J.
DO '"
i
s m r N
M
g 1
I 50 W~ g i f
iIi
I~
t:>>
II!
i ~~ n..
it\
f
is
8
ii
Old;!
d!
8 &...;
a !':'
e
g
Ii
o
I:-<
I:-<
U
BJ DO DO
g
U~
t ~
tJ-i
tog
s .. ~
5! '= ~,g
III = ~. <=
i:~
It 17lt;
3 ..
i
i=;
J i o N
f .....
gi
j ~
51 .. ~
VJ
2a~-=
at Ct
o g~
u
j!~
g
i~, 00._,'"
VJ ~
VJ l~~
8
So J:!'= DO
i
UiI.,;
I:-<~
it] DO DO DO
b 01'"
r:;
tS .. 5
M N DO
g
f'..
r;...& j~
i i] N ~ ~ N ~ N ~ ~ N ~ ~
f'~g
r;... .
a
i"I>> g
iii po.=
iii... s s
C.= e:>
Eu~
r;... '"
0
S
j u
5
1 ij
rJ
Q
Ii
