READ ALONGSIDE THE SOURCE
Fort Walton Beach Council agenda — 10-14-03 regular Council agenda — reading text
Part 47 of 77. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-9771-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
foot radius for public notification by the
FDEP
Deed for the upland property ( this deed establishes the City' s riparian right to
access and utilize the submerged lands)
In additionJo the-8b requirements by the FDEP, staff expects similar, and in some
. ove
cases more stringent, requirements from the U. S. Army Corps of Engineers ( Corps).
While
the FDEP restricts projects of this nature based on expected environmental impact, the Corps
restricts projects based on their expected impact to navigation channels. The proposed
marina under consideration closely approaches the 100- foot buffer from the main channel of
Santa Rosa Sound. Staff will need to gain Corps concurrence before proceeding with the
pennitting element of this project.
CONCLUSION:
Prior to beginning the pennitting process for this facility, staff must first develop a
Request for Proposal (RFP) which outlines the required elements described above.
Developing a RFP at this time will be accomplished at the Staff level and does not require
additional funding. After:development of the RFP, the project will be bid out in order to
solicit quotes from qualifietFengineering finns which specialize in this type of service. Staff
estimates the following costs for specific elements of the project:
Hydrographic Study $ 5, 000
Boundary Survey of Submerged Lands Lease Area $ 1, 000
Water Quality Testing $ 5, 000 to 10, 000
Based on the above infonnation, the feasibility study/pennitting phase of the project will
likely cost between $ 10, 000 and $20, 000 depending on the scope of services specified in the
RFP. However, the overall cost may change depending on the level of competition and
degree of interest among engineering finns.
Should Council agree to proceed, Staff will short- list the interested finns and present
this list, in ranked order, for Council approval at a later date. This element ofthe. project
must be completed prior to seeking approval from the Governor and Cabinet. Once all
preliminary approvals are received, Staff w'ill request Council approval for the final d~ ign
element of the project.
RECOMMENDATION:
Staff recommends City Council approval to begin the Request for Proposals ( RFP)
to perfonn a feasibility study for a
process to secure a qualified, competent engineering finn
new 50- slip marina to be located at the City of Fort Walton Beach Landing property. If
approved, Staff will provide a short- list of ranked finns for Council review at a later date.
Submitted Bv:
John Hofstad, Assistant Public Works Director Date
Reviewed and Submitted Bv:
2
Date
Gene Peters, Parks and Recreation Director
Reviewed and Concur:
Date
Reid Silverboard, City Manager
3
i
1
J.
j
REQ~ STFOR,PROPOSALS~ .
EN:GINEERlNG ~ERVlCES,
FORT WALTON BE.ACII. LA~ ING MARINA
119 .,
RFP03..
AUGUSTS, 2003
- ACT NAME:, WilliarnY. Pbi11ips~'n"p.E.
CQiq
E- mail: phil.phillips@fabreinc:com. '.
fABREENGINEERlNG INC. 1I9GREGORY SQUARE PENSACOLA, FLORIDA 32SQ1
TEL: ( 850) 433"6438 FAX~ (8? O) 1842
434--
@ FABRE ENGINEERING, INC. Eaglneers . Plannen . Suneyon
TABLE OF CONTENTS
DESCRIPTION PAGE NO.
Letter of Transmittal ------------------------------------------------------------ 1
General Information ------------------------------------------------------------- 2
ir. ilities----------------------------------------------------------------- 3
nrr<: al'at>
5
Project EXl'erience --------------------------------------------------------------
8
Project T earn --------------------------------------------------------------------
12
Proj ect Al'l'roach ---------------------------------------------------------------
13
Project Man Hours and <:ost--------------------------------------------------
19
Prol'oser' s Certification---------------------------------------------------------
AddendU1Il Page------------------------------------------------------------------ 20
FlefereIlces ------------------------------------------------------------------------ 21
@ FABRE ENGINEERING INC
ENGINEERS . PLANNERS . SURVEYORS
August 5, 2003
Ms. Helen Spencer, City Clerk
City of Fort Walton Beach-
107 Miracle Strip Parkway SW
Fort Walton Beach, FL 32548
RE: Engin'eering Services for Fort Walton Beach
Landing Marina - RFP 03- 119
Dear Ms. Spencer:
Fabre Engineering fuc. is pleased to submit this proposal to the City of Fort Walton Beach for the
surveying, engineering and scientific services required to evaluate the feasibility of constructing a twenty-
five slip marina at the Fort Walton Beach Landing. Our qualifications and performance record verify that
we are well suited to assist the City on this project as we have provided surveying, planning, permitting,
in Okaloosa, Santa
design, and construction administration ( in whole or in part) for nineteen marinas
Rosa, and Escambia Counties. fu addition, I am the Owner/ Captain of a 50 foot vessel and am intimately
familiar with numerous marina types and features from a user standpoint. .
We will provide all engineering and surveying in-house and use the services of Edmisten and Associates
for biological and ecological evaluations and .BuDock-Tice and Associates for architecturalllandscape
P.E.
services for the dock master building evaluation. I will be Principal- In- Charge, Mr. Phil Phillips,
be in of surveying. We will work
will be our Project Manager and Mr. Ricky Sears, P. S. M. will charge
with Project Manager, keeping him to date on our progress and, hopefully, getting him to
closely your up
attend our meetings with the regulatory agencies. We point out that some of the proposed tasks may
not
Also, should the City
be required and that our proposed fee would be reduced accordingly. we or
the fee
determine at any point that the project is not feasible, work will be immediately halted and
deem the project feasible, the work
adjusted to reflect work done up to that point. Should the City
accomplished during our Study will be used in permitting and design phaSes to follow.
state, and federal
Fabre Engineering, Inc. is thoroughly familiar with all applicable city, county,
all regulatory
regulations and 'has a close working relationship with City Staff and representatives of
of engineering
agencies as well as a successful record in obtaining permits. Weare nearing completion
this project.
and surveying services on our other City projects and are able to immediately begin work on
We appreciate the opportunity to submit this Proposal for your consideration and
we pledge to provide
services with which you will be pleased.
top- quality, professional, and timely engineering and surveying
or desire additional information, please contact me at ( 850) 64- 38
433;.
If should have
you any questions
or byemail atfrank.fabre@fabreinc. com.
Sincerely,
FABRE ENGINEERING, INe.
President
L~
119 GREGORY SQUARE PENSACOLA, FLORIDA 32501 . TEL: ( 850) 433- 6438 FAX: ( 850) 434-7842
@ FABRE ENGINEERING, INC. EngIneers. Plmmers . Surveyors
GENERAL INFORMATION
Submitting Firm: Fabre Engineering, Inc.
119 Gregory Square
Pensacola, Florida 32502- 4915
Contact Person: William V. Phil)
( Phillips, n, P.E.
Senior Project Manager
Hours: Monday - Friday 7: 30 a.m - 5: 00 p.m (CST)
Business: Locally Owned and Operated Firm
President - Frank J. Fabre, P.E.,P. S. M.
Incorporated in September 1981 as
Fabre Engineering, Inc.
Staff: Five ( 5) - Professional Engineers
One ( 1) - Profession31 Surveyor and Mapper
One (1) - Engineer Intern
Two ( 2) - Construction Inspector
Four (4) - CADD Technicians
Four ( 4) - Administrative Support Staff
Five (5) - Survey Crew Members
Total Employees: Twenty-two ( 22)
Certifi.~1ion: Florida Certified for Engineering and Surveying
Page: 2
FIRM ITIES
@ CAPABD..
FABRE ENGINEERING, INC.
119 Gregory Square - Pensacola, FL 32502
Telephone - ( 850) 433- 6438
Facsimile ( 850) 434-7842