I
City ofFort Walton Beach
MEMORANDUM
TO: Joyce Shanahan, Interim City Manager
FROM: John Hofstad, Assistant Public Works-Director
THROUGH: Gene Peters, Parks and Recreation Director
DATE: September 15, 2003
SUBJECT: Fort Walton Landing Marina Feasibility Study, CD 20/ 2002
BACKGROUND:
On May 27, 2003, City Council directed Staff to begin the Request for Proposals (RFP) process
2S- slip -
to secure a qualified, competent engineering firm to perform a feasibility study for a new
marina to be located at the City of Fort Walton Beach Landing property. -. A copy ofRFP 03- 119
Landing Marina is
Feasibility Study" in the additional materials folder for reference by
provided
Council, if necessary. In short, the RFP process offers the City the advantage of accUrately and
fairly evaluating engineering firms based on key criteria such as qualifications, related work
experience, personnel fee schedules, and reference recommendations.
Staff drafted the RFP for this study in June, advertised in July, and opened sealed proposals in
early August. Of the 29 proposals solicited for this study, the City received 2 responsive
proposals from the following firms:
MRD Associates, Incorporated of Destin, (MRD)
Fabre Engineering, Incorporated of Pensacola, (FEl)
The City' s Purchasing Department delivered copies of the 2 responsive proposals to the Public
Works Department for review on August 6, 2003. Once received, a four-member selection
committee comprised of the Public Works Director, Assistant Public Works Director, City
Engineer, and Parks and Recreation Director reviewed both proposals. In early September, the
selection committee met for a final time to rank the firms based on the merits of each firm' s
proposal.
DISCUSSION:
The development of a marina facility involvenhe evaluation of several critical areas in order to
gainthe concurrence of State and Federal agencies. Staff, anticipating the
regulatory
of services and
concurrency needs of these regulatory agencies, developed required scope
a
included this project scope in RFP 03- 119. The following list outline~ these required elements.
Environmental impact evaluation of-the proposed project
Hydrographic study to determine impact of the project on the natural flushing of
the channel
Submerged lands survey to include locations of grass beds within project area
Public notification process to inform property owners within a SOD- foot radius
of the project area
1://3
Water quality testing within proposed project area for metals, fecal coliform, and
oil & grease
The selection committee determined that FEI was better suited for delivering on each of these
needs and ranked their firm ahead ofJ:\.
1RD.
key
Of the two proposals submitted, FEI presented a more thorough understanding of the project
of FEI visited the site and discussed
scope and numerous permitting obstacles. Representatives
with Staff to the submission deadline and tailored their proposal to
theproject length
at prior
to the selection
our
particular project needs. Upon reviewing both proposals, it was clear
committee that FEI had a clear understanding of all the required task elements and time
constraints for completing each task. This was evident in FEl's commitment to complete the
their competitor.
feasibility study within three months compared to four months for
Both firms presented a fee schedule and project estimate in their respective proposals. FEI
1RD, with :MRD' s overall project total
presented slightly lower personnel hourly rates than J:\.
lower ($20, 000 for:MRD versus $ 21, 059 for FEI). However, FEI accounted for all
slightly
1RD offered a broad range estimate that
associated project costs in their estimate, whereas, J:\.
would have to be negotiated once they better understood the project scope. In addition, FEI
indicated in their that". . . some of theproposed tasks may not be required and that our
proposal
proposed fee would be reduced accordingly." Ultimately, the State and Federal regulatory
agencies may reduce some of the permitting requirements as the project progresses.
FEI has experience working with the City Staff and is currently in the final design stages of three
of
largewater and reuse water Should this
projects. projectprogress further, FEI is very capable
continuing this effort by way of engineering and design, permitting, and project management.
Staff has a very good working relationship with FEI and, conversely, FEI understands the City' s
commitment to complete projects within budget constraints.
Staff recommends awarding the Landing Marina Feasibility Study to Fabre Engineering,
in the FY
Incorporated of Pensacola, Florida. Funding for this project is currently programmed
04-05 budget year in the amount of $20,000. Should Council desire to shift priority for this
and move it up one year, Staff will fund the cost of the study out of FY 03- 04
project
contingency funds and revise the existing ClP as necessary;
RECOMMENDATION:
Staff requests City Council direct the Interim City Manager to negotiate with the top ranked -
a feasibility study for the Fort Walton Landing
firm, Fabre Engineering Incorporated, toprovide
Marina. Staff further requests authorization for the City Manager to execute a contract in an
amount not to exceed $ 20, 000. Should negotiations fail with the top ranked firm,
staff will
proceed with the next ranked fIrm.
fr/'1-1J3
Date
2
Reviewed and Submitted By:
G_~ G~ 9..
t1- o3
Gene Peters, Parks and Recreation Director Date
Reviewed and Concur:
rHfA.JL- f. 7-
/tJ '"3
Date
Attachments (Additional Materials Folder):
1. MRD & Associates Proposal
2. Fabre Engineering Proposal
3. Staff Report - Landing Marina dated May 20, 2003
4. RFP for Landing Marina Feasibility Study dated July 2, 2003
3
City of Fort Walton Beach
MEMORANDUM
TO: Reid Silverboard, City Manager
FROM: John Hofstad, Assistant Public Works Director
THROUGH: Gene Peters, Parks and Recreation Director
DATE: May 20, 2002
SUBJECT: Fort Walton Landing Marina, CD 20/ 2002
BACKGROUND:
for
Last year, City Council directed Staff to research the feasibility and requirements
constructing a 50- slip marina extending into Santa Rosa Sound from
the- tWalton Landing
FoI.'
for transient vessels, this new
property. In addition to providing overnight accommodations
facility will include:
Dock Master facility located landward of the marina to regulate traffic entering
and leaving the marina
cost central location
Sewage pump- out station to provide boating traffic a low-
for dumping waste tanks
Potable water and electrical hook-ups for overnight and short- term docking
for
Potentially, the facility may also include a fueling station and rental opportunities
the City does not offer
recreational water sports such as canoeing and kayaking. Currently,
any of the accommodations listed
above with its existing 8- slip dock located at the Landing
property.
DISCUSSION:
The City' s Engineering Division utilized aerial photography together with a computer-
aided- drawing overlay to produce a conceptual rendering of the marina facility and presented
staff
this to Council on March 11, 2003. As part of the planning effort for this facility,
forwarded a copy of the conceptual rendering to the Florida Department of Environmental
to
Protection ( FDEP) for permitting guidance. Ms. Susan Radford of the FDEP responded
in an email dated April 17, 2003. According to Ms. Radford, the City will need
this request
to address the following issues in order to gain the FDEP' s approval
for the project:
Acquire approval of the Governor and Cabinet (required if-the project exceeds 50
slips or 50, 000 square feet)
Water depth measurements for the entire area of the proposed marina
Public easement ( required if a channel must be dredged to gain access)
marina
Survey of any submerged grassbeds in the area of the proposed
Water quality testing for metals, fecal coliform, and oil & grease
of the
Hydrographic study to determine facility' s impact to the natural flushing
channel
for the
Boundary survey of the proposed lease area with a legal description
submerged lands lease
List of property owners within a 500-