READ ALONGSIDE THE SOURCE
Fort Walton Beach Council minutes — 10-12-1999 Joint — reading text
Part 2 of 7. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-3375-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
check valves, fix it,and all the County is saying is that was their preference, that it would be a County operated system, and
whether there is an Interlocal or consortium, and how the details are worked out and the cost for getting the water the Cities
need are the details they are trying to work out.
The question was posed on how large a capacity the County can afford to build without one or two of the Cities having to help
pay for it througb participation from taking some of that water. Mr. Litttell responded at the p-esent stage of the plan,and a$ a
I result of the meetings that have been held at the Central Sub-Regional as well as between the managers, the design ca11s for a
24" Jipe. A 24" pipeline will sopp1y the projected 20 year supplemental needs for Okaloosa County, it is designed to replace
the 650,000 gallons per day total production for Mary Esther, and it is designed to carry 1.9 million gallons per day for Fort
Walton Beach and to do it under gravity flow. He said to completely replace Fort Walton Beach' s production is not in the plan
right now, they would either have to step up the size of the pipeline to a 30" pipe instead of a 24" pipe, or pump the water
instead of letting it flow gravity. On a 24" pipe they could install pumps later and significantly increase the amount of water
they can bring south. He said under the present p- oposal, the draft Interlocal sent to the Cities in July, the County is proposing
to finance 100010 of that capacity even though they are including capacity for the Cities and they are proposing to sell them
water on a wholesale basis. He mentioned, as far as Okaloosa County staff is concerned, if in the futtue the Cities wanted to
put a pipeline of their own in the easement the County is being granted from Eglin,the County would have no objection to that
and there is probably enough room in the existing easement, and the County has no fundamental objection to the concept of
trying to locate the pipeline within the easement in a location where there is room for another pipeline.
Extensive discussion centered around the future water supply concerns, the construction of a 24" or 30" pipeline, the Cities
participation in the construction of the pipeline and participation in joint ownership, the Cities purchasing water from the
County as the long-term sole water suwIier, the Cities drawing from the pipeline at a time when the water is needed, and the
results of the model that would be extremely helpful in determining future water supply needs.
There was consensus of all parties to continue discussion on the water issue at another joint workshop meeting on Tuesday,
November 2, 1999 at 9:00 a.m.at the Fort Walton Beach Council Chambers
d : ~ ':-
iII!IiJlffi~~~~.- .
f-...~~
Mark Van Hala, Public Works Director, City of Fort Walton Beach, explained the Department of Environmental Protection's
DEP) primary concern is there be an Interlocal Agreement in plain figures if anything goes wrong. He noted in the Interlocal
Agreement the County will still be responsible for the collection system. The DEPs other concerns were about the flow valves
being put in and the capacity on the County system, not the City's system; DEP wanted the parties to know that what the
County delivers to the City could cause something to happen.
Mr. Littrell mentioned the variability and seasonal flow is important because it makes it more difficult from the County side.
Discussion included what the City could guarantee the County on flow rates, the seasonal flow, the areas involved, the term of
the agreement for a 20 year period with 10 year renewal options,and the time frame when the agreement could be implemented
once negotiations are completed; and what will be done with the funds received from the County, if the County would be
receptive to discuss the issue of turning over a portion of their system in the Mooney Road and Kenwood areas with the City
purchasing the in: fJastructure the County has paid for in those areas, or if the City could have an opportunity to bid on the solid
waste pickup.
There was consensus of all parties that the City Manager and County Manager will continue negotiations and continue
discussion of the Interlocal Agreement at the joint workshop meeting on November 2nd
I The meeting a<
ljoumed at 11 :57 a.m.
C _ RD:'\
c ~'.,~
Water & Sewer Issues Workshop Meeting
October 12, 1999
A and Okaloosa County workshop to discuss water and
joint city
sewer issues was called to order at 9: 05 a. m. at the Water and
Sewer Administration Building in Fort Walton Beach. Members
present were Dennis " Nick" Nicholson, Chairman; Paula Riggs, Vice-
I Chairman; William A. " Bill" Harrison; Kathleen A. O' Dell; and Ray
Sansom.
members
Mr.
Also present
of
were
the press.
Chris Holley, County Manager, and
he met with the Fort Walton Beach City Council
Holley reported
several months regarding the sewer issue.
ago Today' s workshop is
being held to continue dialogue between the Board of county
Commissioners and the City of Fort Walton Beach. Mr. Holley
continued, saying a meeting was held yesterday with DEP ( Department
of Environmental Protection) to discuss the transfer of wastewater
to the city of Fort Walton Beach for treatment and disposal. Mr.
Holley reported there are also a lot of issues to work out with
regard to an alternate water supply for the cities of Fort Walton
Beach and Mary Esther.
Mr. Jeff Littrell, Water and Sewer Director, explained that Fort
Walton Beach staff, Okaloosa
County staff, and the Water and Sewer
Department' s consulting engineer met with FDEP in Tallahassee
yesterday. The DEP representatives have questions and concerns
about the proposed interlocal agreement regarding the diversion of
wastewater to the City of Fort Walton Beach. Mr. Littrell
expressed the opinion DEP came out of the meeting feeling
comfortable. DEP was assured this is a doable project. Some of
the various options being looked at in expanding wastewater
treatment capacity were discussed with the next DEP. Whenever
capacity report is submittedexpectsto be
DEP, he
reporting to
lower flows than what has been reported in the past. Flow meters
are in place and he expects to be gfving DEP some revised flows.
Mr. Littrell said DEP requires that he have plans and
specifications completed by June 2000 regarding wastewater
capacity.
Mr. Reid
Silverboard, Fort Walton Beach city Manager, suggested
discussing the water issue first as this is something in which the
City of Mary Esther is also involved.
Discussion of the draft Interlocal Agreement on alternate water
supplY with the cities of Fort Walton Beach and Marv Esther
I Mr. Littrell gave a lengthy summary report of the activities for an
alternative water supply. He began the report with the March,
date in which the county formally presented its proposal to the
1995
Eglin Air Force Base Encroachment Committee to utilize Lightwood
Knot Creek as a source of surface water and request for a 55- acre
October 12, 1999 - 1- Minute Book 43, Page 276
Board of County Commissioners Meeting
site for a water treatment plant. Mr. Littrell ended the summary
with today' s meeting which is the second joint workshop to be held
between the Board of County Commissioners and the City Councils of
Fort Walton Beach and Mary Esther. The first joint workshop was
held on October 5, 1998.
Mr. Littrell reported the first formal draft Interlocal Agreement
was sent to the cities of Fort Walton Beach and Mary Esther on
March 15, 1999. The parties were ultimately unable to reach an
agreement on the draft to participate in the alternate water supply
project. On July 15 a second draft was submitted which was for a
modified take pay type agreement
or with no ownership in capacity
allowed. In August 1999 the cities of Fort Walton Beach and Mary
Esther formed the Fort Walton Beach- Mary Esther Regional Water
Supply System and applied for a Consumptive Use Permit from the
NWFWMD ( Northwest Florida Water Management District) to construct
Floridan Aquifer wells along the proposed pipeline. The Water
Management District returned the application marked " incomplete."
Mr. Littrell advised that staff has received written response from
the cities on the draft Interlocal Agreement bringing us up to
today.
NOTE: The Summary of Activities, Pages 1 through 6, is labeled
Attachment A and made a part of these minutes.
Mr. Littrell replied to questions from Mr. Nicholson that staff has
been discussing requirements for the Consumptive Use Permit with
the Northwest Florida Water Management District. The NWFWMD says
they aregoing to build a model with 85% of the cost to be funded
by the NWFWMD. The model will take 18 months to two years for
completion. Upon completion of the model, the entities that are
given a Consumptive Use Permit will take those models and do
additional mOdeling. There are presently two entities discussing
corridor wells to supply the extra water needed. Mr. Littrell
advised the corridor well issue will be placed on hold for a while.
Mr. Nicholson advised the county has been involved wi th the
Northwest Florida Wastewater Management District and the RUA
Regional Utility Authority) regarding the need for supplemental
water to be accomplished through a pipeline.
Mr. Silverboard said there couple of fundamental areas that
are a
need to be addressed. During past couple of years the cities
the
have been told that the water produced from the wells is necessary
to meet the county' s demands during the next several years. The
wells will meet some of the
