sections, which is built on a permanent chassis and designed
to be used with or without a permanent foundation when connected
to the required utilities. The term also includes park trailers,
travel trailers and similar transportable structures placed on a
site for 180 consecutive days or longer and intended to be
improved property.
"National Geodetic Vertical Datum (NGVD)" es corrected in 1929 is
a vertical control used as a reference for establishing varying
elevations within the floodplain.
"New Construction" means structures for which the "start of
construction" commenced on or after the effective date of this
ordinance.
"Sand Dunes" means naturally occurring accumulations of sand
ridges or mounds landward of the beach.
(26) "Start of Construction" (for other than new construction or
substantial improvements under the Coastal Barrier Resources Act)
(P.L. 97-348), includes substantial improvement, and means the
date the building permit was issued, provided the actual start of
construction, repair, reconstruction or improvement was within 160
days of the permit date. The actual start means the first
placement of permanent construction of a structure (including a
manufactured home) on a gite, such as the pouring of slabs or
footings, installation of piles, construction of columns or any
work beyond the stage of excavation or the placement of a
manufactured home on a foundation. Permanent construction does
not include land preparation, such as clearing, grading and
filling: nor does it include the installation of streets and/or
walkways: nor does it include excavation for a basement, footings,
piers or foundations or the erection of temporary forms; nor does
it include the installation on the property of accessory
buildings, such as garages or sheds not occupied as dwelling units
or not part of the main structure.
(27) "Structure" means a walled and roofed building that is principally
apove ground, 4 manufactured home, a gas or Liquid storage tank or
other man-made facilities or infrastructures.
(28) "Substantial Improvement" means any repair, reconstruction,
alteration or improvement to a structure, the cost of which equals
or exceeds fifty (50) percent of the market value of the
structure, either (1) before the repair or improvement is started,
or (2) if the structure has been damaged and is being restored
before the damage occurred. For the purposes of this definition,
"substantial improvement" is considered to occur when the first
alteration of any wall, ceiling, Floor or other structural part of
the building commences, whether or not that alteration affects the
external dimensions of the structure. The term does not, however,
include any project for improvement of a structure required to
comply with existing health, sanitay or safety code specifications
which are solely necessary to assure safe living conditions.
(29) "Variance" is a grant of relief from the requirements of this
chapter which permits construction in a manner otherwise
prohibited by this chapter where specific enforcement would resuit
in unnecessary hardship.
ARTICLE 3. General Provisions.
SECTION A. Land To Which This Chapter Applies. This Chapter shali
apply to all areas of special flood hazard within the jurisdiction of
the City of Fort Walton Beach.
SECTION B. Basis for Establishing the Areas of Speciel Flood Hazard.
The Official Flood Map of the City shall be the latest Flood Insurance
Rate Hap, with all explanatory matter or waterial attached thereto,
prepared and published by the Federal Emergency Management Agency and
adopted by resolution of Council.
SECTION C. Establishment of Development Permit. A Development Permit
shall be required in conformance with the provisions of this Chapter
prior to the commencement of any development activities.
SECTION D. Compliance. Ho structure of idand shall hereafter be
located, extended, converted or structurally altered without full
coupliance with the terms of this Chapter and other applicable
regulations.
SECTION E. Abrogation and Greater Restrictions. This Chapter is not
intended to repeal, abrogate or iwpair any existing easements,
covenants or deed restrictions. However, where this Chapter and
another conflict or overlap, whichever imposes the more stringent
restrictions shall prevail.
SECTION F. Interpretation. In the interpretation and application of
this Chapter all provisions shall be: (1) considered as minimum
requirements; (2) liberally construed in the favor of the governing
body; and (3) deemed neither to limit nor repeal any other powers
granted under state statutes.
SECTION G. Warning and Disclaimer of Liability. The degree of flood
protection required by this Chapter is considered reasonable for
regulatory purposes and is based on scientific and engineering
consideration. Larger floods can and will occur on rare occasions.
Flood heights may be increased by man-made or natural causes. This
Chapter does not imply that land outside the areas of special flood
hazard or uses permitted within such areas will be free from flooding
or flood damages. This Chapter shall not create Liability on the part
of the City of Fort Walton Beach or by any officer or employee thereof
for any flood damages that result from reliance on this Chapter or any
adawinistretive decision lawfully made thereunder.
SECTION H. Penalties for Violation. Violation of the provisions of
this Chapter or failure to comply with any of its requirements,
including violation of conditions and safeguards established in
comnection with grants of variance, shall constitute a misdemeanor.
Any person who violates this Chapter or fails to comply with any of its
requirements shall, upon conviction thereof, be fined not more than
$500.00 or imprisoned for not more than ninety (90) days, or both, and
in addition, shall pay all costs and expenses involved in the case.
Each day such violation continues shall be considered a separate
offense. Nothing herein contained shall prevent the City of Fort
Walton Beach from taking such other Lawful action as is necessary to
prevent or remedy any violation.
ARTICLE 4, Administration.
SECTION A. Designation of Administrator.
The City Manager or his designee is hereby appointed to aditinister and
implement the provisions of this Chapter.
SECTION B. Permit Procedures. Application for Development Permit
shall be made to the City Manager or his designee on forms furnished by
him or her prior to any development activities, and may include, but
not be limited to, the following plans in duplicate drawn to scale
showing the nature, location, dimensions and elevations of the area in
question; existing or proposed structures, fill, storage of materials,
drainage facilities and the location of the foregoing. Specifically,
the following information is required:
(1) Application Stage.
(a) Elevation in relation to mean sea level of the
proposed lowest floor (including basement) of ail
structures;
(b) Elevation in relation to mean sea level to which
nonresidential structure will be flood-proofed;
{c) Certificate from a registered professional engineer
or architect that the nonresidential flood-proofed
structure will meet the flood-proofing criteria in
Article 5, Section B (2);
(d) Description of the extent to which any watercourse
wili be altered or relocated as a result of proposed
development, and;
(2) Construction Stage.
Provide a floor elevation of flood-proofing certification
after the Lowest floor is completed, or in instances where
the structure is subject to the regulations applicable to
Coastal High Hazard Areas, after placement of the
horizontal structural members of the Lowest fioor. Upon
placement of the lowest floor, or flood proofing by
whatever construction means, or upon placement of the
horizontal structural members of the lowest floor,
whichever is applicable, it shall be the duty of the permit
holder to submit to the City Manager or his designee a
certification of the elevation of the lowest floor
Elood-proofed elevation, or the elevation of the lowest
portion of the horizontal structural members of the lowest
floor, whichever is applicable as built, in relation to
mean sea level. Said certification shail be prepared by or
under direct supervision of a registered land surveyor or
professiona engineer and certified by same. When
flood-proofing is utilized for a particular building, said
certification snuall be prepared by or under the direct
super ed)
certifi 2. Any work undertaken prior to subiission
of the certification shall be at the permit holder's risk.
The City HManaer or his designee shall review the floor
elevation survey data submitted. Deficiencies detected by
such review shall be corrected by the permit holder
immediately and prior to furtner progressive work being
permitted to proceed. Failure to submit the survey or
faiiure to make said corrections hereby, shall be cause to
issue a stop work order for the project.
. ape Ae at aye, oe ye ey yee pe maaty it tee " ws cp yp
& proresoionar. engineer or arenitect and
py
SECTION C. Duties and Responsibilities of the City Manager or his
signee: Duties of the City Manager or his designee shall include but
net be limited to:
(1) Review all development permits to assure that the permit
requirements of this Chapter have been satisfied.
(2) Advise permittee that additional federal or state permits
tlay be required, and if specific federal or state pernit
requirewents are known, require that copies of such permits
be provided and maintained on file with the developiwent
permit.
(3) Notify adjacent communities and the Departnent of Natural
Resources prior to any alteration or relocation of a
watercourse, and submit evidence of such notification to
the Federal Energency Management Agency.
(4) Assure that maintenance is provided within the altered or
relocated portion of said watercourse so that the
flood-carrying capacity is not diminished.
(5) Verify and record the actual elevation {in relation to mean
seal level) of the Lowest floor (including basement) of all
new or substantislly improved structures, in accordance
with Article 4, Section 5 (2).
(6) Verify and vrecord the actuai elevation (in relation to mean
seal level) to which the new or substantially improved
structures have been flood-proofed, in accordance with
Article 4, Section B (2).
(7) In Coastal Hazard Areas, certification shall be obtained
from a registered professional engineer or architect that
the structure is designed to be securely anchored to
adequately anchored pilings or columns in order to
rithstand velocity waters and hurricane wave wash.
(8) In Coastal High Nazard Areas, the City Manager or his
designee shall review plans for adequacy of breakaway walls
in accordance with Article 5, Section B (4) (h).
(9) When flood-proofing is utilized for a particular structure,
the City Hanager or his designee shall obtain certification
from a registered professional engineer or architect, in
accordance with Article 5, Section B (2).
(10)
(11)
SECTION D.
(1)
(2)
(4)
Where interpretation is needed as to exact location of
boundaries or the areas of special flood hazard (for
exauple, where there appears to be a conflict between a
wapped boundary and actual field conditions) the City
Manager or his designee shall make the necessary
interpretation. The person contesting the location of the
boundary shall be given a reasonable opportunity to appeal
the interpretation as provided in this Article.
When base flood elevation data or floodway data have not
been provided in accordance with Articie 3, Section B, then
the City Hanager or his designee shall obtain, review and
reasonably utilize any base flood elevation and floodway
data available from a federal, state or other source, in
order to administer the provisions of Article 5.
All cecords pertaining to the provisions of this Chapter
snall be maintained in the office of the City Manager or
his designee and shali be open for public inspections.