READ ALONGSIDE THE SOURCE

Fort Walton Beach Resolution — 76-50-Contract with JP Converse — reading text

Part 1 of 1. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — fwb-7454-original.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

RESOLUTION NO. 76-0 A RESOLUTION AUTHORIZING THE CITY MANAGER ON BEHALF OF THE CITY OF FORT WALTON BEACH TO ENTER INTO ENGINEER SERVICE CONTRACTS FOR PUBLIC WORKS PROJECTS WITH J. B. CONVERSE AND COMPANY, INC., PROVIDING THE EFFECTIVE DATE HEREOF. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FORT WALTON BEACH, FLORIDA. SECTION I. The City Manager on behalf of the City of Fort Walton Beach, Florida, is hereby authorized to enter into the attached contracts with J. B. Converse and Company, Inc. for engineering services on the following projects: Improve sewer lines as outlined in Local Public Works Capital Development and Investment Project Application FWB-7. Improve drainage system as outlined in Local Public Works Capital Development and Investment Project Application FWB-8. Drill and complete four shallow water wells as out- lined in Local Public Works Capital Development and Investment Project Application FWB-6 Extend and replace water lines as outlined in Local Public Works Capital Development and Investment Project Application FWB-9 SECTION II. This resolution being of an administrative nature shall take full force and effect immediately upon its passage and approval by the Mayor. ADOPTED Fo pro 7/7 76 Lh NE. City Clerk Reviewed and approved by the City Attorney which will be legal when enacted by the City Council of the City of Fort Walton Beach, FL. WALTER J. SMITH City Attorney o) Oo AMENDMENT NUMBER 2 TO CONTRACT DATED MARCH 15, 1972 BETWEEN THE CITY OF FORT WALTON BEACH, FLORIDA AND J. B. CONVERSE & CO. , INC. The above Contract is amended in the following particulars only and the provisions herein apply only to work covered under this Amendment Number 2: The work covered by this Amendment is included in the applications for federal funds, under provisions of the Local Public Works Capital Development and Investment Program as authorized under PL 94-369, for the following projects: 1. Install and connect four (4) new wells to the Golf Course irrigation system; construct new potable water transmission main from elevated tank in Golf Course Area to existing city water main on Denton Blvd; and connect the existing well No. 10 to this water main. 2. Construction of various storm drainage facilities. as outlined in the Storm Drainage Grant Application. 3. Construction of various sanitary sewer improvements as outlined in the Sanitary Sewer Improvement Grant Application. 4. Construction of miscellaneous water system improvements as outlined in the Water System Improvement Grant Application. O oO B. Delete Article II, Basis of Payment, in its entirety and in lieu thereof substitute the following: Basis of Payment 1. Design Phase The Basis of Payment for design engineering services ‘under this Amendment No. 2 will be on the Lump Sum basis for each of the projects outlined in A. above. Said services as described in the grant applications to EDA under the Public Works Capital Development Program. The Lump | Sum design service for each project is as follows: Project No. 1 - $24, 600. 00 Project No. 2 - $14, 300. 00 90% of the design for this project has been completed by the City. The Engineer will prepare construction specifications, complete the project design and drawings, and assemble all documents for bidding purposes. Project No. 3 - $24, 800. 00 Project No. 4 - $32, 250. 00 2. Construction Phase - All Projects Payment to the Engineer for this phase of the work will be at the hourly rate shown on Exhibit A attached hereto times a multiplier of 2.30 for the personnel actually engaged in the work. Accurate time sheets certified by the Engineer shall be kept. Cost of travel, subsistence, telephone, telegraph, prints and printing and general out of pocket expenses required specifically for this project will be paid at actual cost plus handling charges of 10%. O : Oo IN WITNESS WHEREOF, this instrument is executed in duplicate, one copy being held by each party, this 10th day of November , 1976. ATTEST: THE CITY OF FORT WALTON BEACH, FLORIDA Jha 4 olan BY Jbudh LZ. lilllbe City Clerk-Finance Director City Manager ATTEST: J. B. CONVERSE & CO. , INC. CONSULTING ENGINEERS (CE (CED, ; APPENDIX A SPECIAL REQUIREMENTS . th the associated loan and/or “During and in connection’ wi United States Government and grant agreement between the _theCity of Ft, Walton Beach, Fla. (Name of Recipient of Yederal Financial Assistance) relating to the Federally assisted pregram, the ** B. Converse & Co., Igfnae of Addiltddch Engineer), its successors ano assigns (i) will to the extent applicable as contractors, sub- © any other capacity, comply, contractors, lessces, suppliers, or in with the applicable provisions of the Regulations of the United States Department of Commerce (Part 8 of Subtitle A of Title 15 of the Code of Federal Regulations) issued pursuant to Title VI of the Civil Rights Act of 1964 (P.L, 88-352), and will not thereby discriminate against any person on the ground of race, color, or national origin in their employment practices, in any of their own contractual arrengements, in all services or other business operations, (ii) they will previde the information required by or pursuant to said Regulations te ascertain jance with the Regulations and these assurances, and moliance with the nondiscrimination re- ssurances shall d Regulations and these as val arrangements with comp] ' (411) their, nonco quirements of sai constitute a breacn of their contract the Recipient of Federal financial assistance whereby said arrangements may be cancelled, terminated or suspended in whole or in part or may be subject to enforcenent otherwise by appropriate legal proceedings." This Agreement executed the day and year first above written. J. B. CONVERSE & CO., INC, CONSULTING ENGINEERS - THE CITY OF FORT WALTON BEACH, FLORIDA BY Dimi. 2 [liter City Manager . © a?) SCHEDULE OF HOURLY RATLS FOR FRO Project Managers $12.77 Senior Engineers . ys _ . 10.45 Design. Engineers ~ | | 7,55 ‘Design Draftsmen . 6.97 Draftsmen 4. 64 Chief of Party 7.09 Instrumentmen 3.87 Rodmen - Chainmen 3.02 Inspector 5. 81. Secretary 3.76 3.00 Stenographer - Clerical PERSONNEL OF VARIOUS CLASSIFICATIONS TO $ 19. 12, 10. .71 97 | 38 .15 87 16 77 45 84 64 . 70

Download this text file with its original spacing ↓