RESOLUTION NO. 76-0
A RESOLUTION AUTHORIZING THE CITY MANAGER
ON BEHALF OF THE CITY OF FORT WALTON BEACH
TO ENTER INTO ENGINEER SERVICE CONTRACTS
FOR PUBLIC WORKS PROJECTS WITH J. B. CONVERSE
AND COMPANY, INC., PROVIDING THE EFFECTIVE
DATE HEREOF.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF FORT WALTON BEACH, FLORIDA.
SECTION I. The City Manager on behalf of the City of
Fort Walton Beach, Florida, is hereby authorized to enter into the
attached contracts with J. B. Converse and Company, Inc. for
engineering services on the following projects:
Improve sewer lines as outlined in Local Public Works
Capital Development and Investment Project Application
FWB-7.
Improve drainage system as outlined in Local Public
Works Capital Development and Investment Project
Application FWB-8.
Drill and complete four shallow water wells as out-
lined in Local Public Works Capital Development and
Investment Project Application FWB-6
Extend and replace water lines as outlined in Local
Public Works Capital Development and Investment
Project Application FWB-9
SECTION II. This resolution being of an administrative
nature shall take full force and effect immediately upon its
passage and approval by the Mayor.
ADOPTED Fo pro 7/7 76
Lh NE.
City Clerk
Reviewed and approved by the City Attorney
which will be legal when enacted by the City
Council of the City of Fort Walton Beach, FL.
WALTER J. SMITH
City Attorney
o) Oo
AMENDMENT NUMBER 2
TO
CONTRACT DATED MARCH 15, 1972
BETWEEN THE
CITY OF FORT WALTON BEACH, FLORIDA
AND
J. B. CONVERSE & CO. , INC.
The above Contract is amended in the following particulars only
and the provisions herein apply only to work covered under this
Amendment Number 2:
The work covered by this Amendment is included in the applications
for federal funds, under provisions of the Local Public Works
Capital Development and Investment Program as authorized under
PL 94-369, for the following projects:
1. Install and connect four (4) new wells to the Golf Course
irrigation system; construct new potable water transmission
main from elevated tank in Golf Course Area to existing city
water main on Denton Blvd; and connect the existing well
No. 10 to this water main.
2. Construction of various storm drainage facilities. as
outlined in the Storm Drainage Grant Application.
3. Construction of various sanitary sewer improvements as
outlined in the Sanitary Sewer Improvement Grant Application.
4. Construction of miscellaneous water system improvements
as outlined in the Water System Improvement Grant Application.
O oO
B. Delete Article II, Basis of Payment, in its entirety and in lieu
thereof substitute the following:
Basis of Payment
1. Design Phase
The Basis of Payment for design engineering services
‘under this Amendment No. 2 will be on the Lump Sum basis
for each of the projects outlined in A. above. Said services
as described in the grant applications to EDA under the
Public Works Capital Development Program. The Lump |
Sum design service for each project is as follows:
Project No. 1 - $24, 600. 00
Project No. 2 - $14, 300. 00
90% of the design for this project has been completed by the
City. The Engineer will prepare construction specifications,
complete the project design and drawings, and assemble all
documents for bidding purposes.
Project No. 3 - $24, 800. 00
Project No. 4 - $32, 250. 00
2. Construction Phase - All Projects
Payment to the Engineer for this phase of the work will
be at the hourly rate shown on Exhibit A attached hereto times
a multiplier of 2.30 for the personnel actually engaged in the
work. Accurate time sheets certified by the Engineer shall be
kept.
Cost of travel, subsistence, telephone, telegraph, prints
and printing and general out of pocket expenses required
specifically for this project will be paid at actual cost plus
handling charges of 10%.
O : Oo
IN WITNESS WHEREOF, this instrument is executed in duplicate,
one copy being held by each party, this 10th day of November , 1976.
ATTEST: THE CITY OF FORT WALTON BEACH,
FLORIDA
Jha 4 olan BY Jbudh LZ. lilllbe
City Clerk-Finance Director City Manager
ATTEST: J. B. CONVERSE & CO. , INC.
CONSULTING ENGINEERS
(CE (CED,
; APPENDIX A
SPECIAL REQUIREMENTS
.
th the associated loan and/or
“During and in connection’ wi
United States Government and
grant agreement between the
_theCity of Ft, Walton Beach, Fla. (Name of Recipient of
Yederal Financial Assistance) relating to the Federally
assisted pregram, the ** B. Converse & Co., Igfnae of
Addiltddch Engineer), its successors ano assigns (i) will
to the extent applicable as contractors, sub- ©
any other capacity,
comply,
contractors, lessces, suppliers, or in
with the applicable provisions of the Regulations of the
United States Department of Commerce (Part 8 of Subtitle
A of Title 15 of the Code of Federal Regulations) issued
pursuant to Title VI of the Civil Rights Act of 1964
(P.L, 88-352), and will not thereby discriminate against
any person on the ground of race, color, or national
origin in their employment practices, in any of their
own contractual arrengements, in all services or other
business operations, (ii) they will previde the information
required by or pursuant to said Regulations te ascertain
jance with the Regulations and these assurances, and
moliance with the nondiscrimination re-
ssurances shall
d Regulations and these as
val arrangements with
comp]
' (411) their, nonco
quirements of sai
constitute a breacn of their contract
the Recipient of Federal financial assistance whereby said
arrangements may be cancelled, terminated or suspended in
whole or in part or may be subject to enforcenent otherwise
by appropriate legal proceedings."
This Agreement executed the day and year first above written.
J. B. CONVERSE & CO., INC,
CONSULTING ENGINEERS
- THE CITY OF FORT WALTON
BEACH, FLORIDA
BY Dimi. 2 [liter
City Manager
. © a?)
SCHEDULE OF HOURLY RATLS FOR
FRO
Project Managers $12.77
Senior Engineers . ys _ . 10.45
Design. Engineers ~ | | 7,55
‘Design Draftsmen . 6.97
Draftsmen 4. 64
Chief of Party 7.09
Instrumentmen 3.87
Rodmen - Chainmen 3.02
Inspector 5. 81.
Secretary 3.76
3.00
Stenographer - Clerical
PERSONNEL OF VARIOUS CLASSIFICATIONS
TO
$ 19.
12,
10.
.71
97 |
38
.15
87
16
77
45
84
64
. 70