The City has a future Capital Improvement Praject within the CRA scheduled to install
a new water main within the western right- af- way af Perry Avenue. This praject was
designated to. serve the praposed develapment. If the Developer proposes to. install
this new main, a credit w.ill be- receiv.ed far th.e f the water
transmission po.rtion .a-
impact fees.
a. The City shall be respansible for perfarming any required taps and installing the
required water meters.
b. The Developer shall be responsible for installing all onsite piping and any required
backflow preventers and appurtenances.
c. Water meters shall be installed within a right- of- way or easement and shall be
located within a grassed area.
d. Backflow preventers are required for all water service connections. The backflow
preventers shall be located on private property and shall be tested and inspected
by City personnel.
e. Prior to commencing installation of the proposed water system, the Contractor
shall contact the Utilities Operations Manager at ( 850) 833- 9613 to conduct an
onsite pre- construction conference.
f. Prior to placing the new fire main into service, the main shall be pressure tested to
a minimum of 150
psi or twice the working pressure, whichever is greater, and the
backflow preventer shall be inspected by the City's Water Operations Division.
2) The Utility Plan indicates a new 8" sanitary sewer gravity main with manholes
throughout the development. Sewer Reference No. 427 has been attached indicating
the location of the City's existing gravity sewer system. The Utility Plan shall clearly
indicate all proposed sewer items, including pipe size, material, length, slope, and invert
elevations.
a. The Developer shall be. responsible for all sanitary sewer installation.
b. Prior to commencing installation of the new sewer system, the Contractor shall
contact the Utilities Operations Manager at ( 850) 833- 9613 to conduct an onsite
pre~construction conference.
c. A post- construction internal video inspection shall be conducted to veri.fy the
installation of the new sewer system.
d. All new manholes shall have stainless steel inflow protectors installed.
Connection and Impact Fees:
1) To determine the required impact fees, an ERC Determination Form shall be submitted.
A copy of the form has been attached.
2) Once the revised Utility Plan is submitted, the estimated water and sewer connection
fees can be calculated.
4 . . ..
Miscellaneous Comments
1) See the attached list of standard notes to be added to the final plans. The plans shall
not be approved until all required standard notes are included on the plans.
2) Prior to demolition of existing facilities, any water and sewer services that may be
affected by the demolition activities shall be disconnected by the City.
3) The Developer shall be responsible for obtaining all required FDEP and FDOT permits
to construct the new building and infrastructure. Copies of all correspondence with the
permitting agencies shall be forwarded to the City. Proof of approved permits shall be
shown to the City prior to approval of the building permit.
4) The development must meet FDEP environmental regulations and FDOT standards for
sediment and. soil erosion control. Sediment and . erosion control m~ asures shall be
shown on appropriate plan sheets. The proposed sediment and erosion control
the
measures shall be installed prior to commencement. of any demolition of existing
building( s) or construction of the proposed development.
5) Please contact the Environmental Specialist at ( 850) 833- 9932 for discussion on any
environmental concerns.
6) Please contact the City Engineer at ( 850) 833- 9608 for discussion on any stormwater
concerns.
These items constitute the Utilities Department's preliminary review of the submitted site plans
for the DRC. A more detailed technical review shall be conducted upon submittal for a building
permit. This review only includes items affecting the water and sewer service and is only a
preliminary review. If you have any questions, please contact me at ( 850) 833- 9612 or
mbeedie@fwb. org.
Michael. D. Beedie, P. E.
Utilities Operations Manager
CRA regular meeting ATTACHMENTD 7. 11. 07
UEST FOR SITE PLAN A T CHURCH co t.
2. The existing curb inlet on Harbeson Dr. neeas to -nave the top el ation and invert
elevation along with pipe sizes identified on Sheet C- 103 and Sh t C.. 202.
Sheet C- 103 has calculations shown for the retention pond entifying the runoff
treated is below acceptable City of FWB LOC code, pleas revise. Key elements
hen designing the Stormwater Management Plan includ , following:
Retention pond design should meet or exceed the 2 year 24 hr rain event or the
retention requirement, whichever is greater.
Si, slopes for the retention pond should not e
Rete . on Areas are to be stabilized with sod.
Overfl from retention pond cannot dr n on adjacent properties unless
designed f a 100 yr storm event.
Percolation ts are to be perform in proposed retention areas, with
elevations of wa table determined.
Bottom of retention rea to be no clo r than 2 feet to water table.
Separate Drainage Ba ' ns are to beefined.
Top and Bottom of rete ' on area 0 be defined.
4. All roof runoff must be direct int etentlon facilities.
2. Prior to Certificate of Completion:
a. All public sidewalks/ cross walk hall be constructed and striped as per City
specifications as applicable, incl ing onslstency with ADA requirements.
b. All required City and State eas ments d permits (i.e. storm water, utility, sidewalk,
driveway, etc.) shall be execu and appr ed by the appropriate agency.
Mr. Pagliari seconded motion a it carried u animously with Bobo, Covey, Gossom,
Kennedy, Pagliari, Reed, and Re in favor.
CONCEPTUAL SITE PLAN - H BOUR PLACE APART . TS
Review Conceptual site plan or Harbour Place Apartments ocated at 7 and 8 Bobolink Street.
Requested by Michael Kent Progressive Management.
to testify were given the oath.
Patti Sunnerberg, Oir <::
tor of Okaloosa Community Development Corp tion, briefly described the
Project to rebuild th transitional housing buildings with the construction of 8 units on two lots with an
option to buifd up 0 6 more units on the site at such time the zoning is cn nged to allow additional
units per acre a . increased densities through approved bonus points.
The CDS Dir: ctor submitted the staff report into the record.
The Cha an opened the public hearing. As there was no one who wished to s
hearin as closed.-
Mr. ovey moved to recommend to City Council conceptual approval of the propos. d 18 unit
ap ment development at 7 and 8 Bobolink Street NE. Mr. Reed seconded motio and it
c led unanimou$ ly wlJh Sobo, Covey, GO$ som, Kennedy, Pagllari, Reed, and Rettie in Yor.
SITE PLAN APPROVAL - LANDMARK CENTER/JOINT VENTURE
CRA Case 07-02- SP, consideration of site plan approval for Landmark Center/Joint Venture located
at 206 Perry Avenue SE. Fort Walton Beach Development Partners LLC.
All individuals who expected to testify were given the oath.
of li1
CRA regular meeting 7- 11- 07
SITE PLAN APPROVAl- LANDMARK CENTER/JOINT VENTURE cont.
Bruce HoweU, Fort Walton Beach Development Partners, briefly described the project to construct a
mixed- use development to be known as the Landmark Center which will contain retail, restaurant,
office and residential uses to include a 343 space parking garage.
David Smith, Moore Bass Construction, described the proposed project to be located on Perry
Avenue and Highway 98 on approximately 1. 28 acres in the Mixed~Use main Street District with
and 38
approximately 19, 00 sq. ft. of retail, 12,00 sq. ft. of restaurants, 19, 000 sq. ft. of office space,
residential units. He reported they utilized the bonus point system and will provide 14 feet on the first
floor of the building to place all utilities underground, will provide decorative side lighting, win provide
public access parking, will provide a public plaza along Perry Avenue, and will provide street furniture.
Donald Gray, Jr., and Wayne Dewhurst of DAG Architects, presented a 3- D power point of the
proposed project to include Miracle Strip Parkway, Perry Avenue, and First Street, showing traffic
flow, pedestrian traffic, and appearance of the building and the parking gar~ge.
The Chairman asked if there were any questions from the Board for the applicant.
The Board inquired whether the applicant would be receptive to purchasing the garage and the City
land under the garage from the City at fair market value, and was advised much would depend on the
economics of the situation. Further discussion included that the proposal includes the use of City
units proposed
property and is a critical component to the Landmark project; the size of the residential
at 1, 200 to 1, 500 square feet; the need to ' dress up' the building as seen from Highway 98, with
attention to color and decorative awnings; and that access to the parking garage will be from all three
streets, Highway 98, Perry Avenue, and First Street.
The Chairman asked for public input.
Millie Thrush, 316 Sudduth Circle, expressed her excitement at the proposed project and the
partnership between the City and the developer.
Chris Gibson, 249 Brooks Street, received clarification that 360 total parkihg spaces wi\! be available
in the garage, with 38 spaces reserved for the residents. It was noted that the current parking lot
contains only 119 parking spaces.
Lee McDonald, 10 Ru de Ie Roi in the Kenwood area, expressed concern that the citizens