READ ALONGSIDE THE SOURCE
Fort Walton Beach Council agenda — 08-10-2007 special agenda - Landmark — reading text
Part 5 of 181. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-13614-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
five civns for review by various departments
5) Provide two extra sets qf cQmpleted plans for review by fire Dept and
1 nspe.c!.i on. . .' .... ".
3) $ how site ' a<?
c.essibllity. in accordance with Section 11.of FBG
7) Include a completed Title Page
8) Include Flood Zone
9) Provide th( eshold '", spector name and certifications. N'ote on plans that
inspection reports shall also be forwarded to th~ Inspection Dept of City
Han' .
10) No~e oriplans that as built surVeys will be requIred after slab
inspections
11) Stip~ latG termite treatments
r;' ~~~~~
11' '':'
I \.
A,permanent str~et addr~ss shall be provid~ d at final inspection
t2)
1.3) All signage shall be permitted separately
14) Show back flow preventor and note on piansthat AI Jordan of our Water
Ops Dept ( at 833-9630) shall be can~ d for a final inspection' of the
w
backfh;>
15) Include all required transition strips at egress / ingress points to site
16) Submit an product approvals . ..
h ~I" . . f""''-'
i.~:-:. .', I' _~ I .., ...........
CITY OF FORT WALTON BEACH, FLORIDA
MEMORANDUM
DATE: May 15, 2007
TO: Christy Johnson, CRA Planner
FROM: John B. Geurin, Engineering Division
SUBJECT: THE LANDMARK CENTE'R
MIRACLE STRIP PARKWAY AND PERRY AVE.
I have reviewed the preliminary site information for the Public Works Department of
the above referenced development which was re- submitted for the DRC to be held May
24, 2007. The Engineering Division offers the following comments in order to reach plan
approval by the Public Works Department:
1. All issues identified on my review memo dated April 30,' 2007 are still outstanding
and will have to be resolved in order to gain approval by the Public Works
Department.
2. The following additional comments are offered to gain plan approval:
a. Revise General Note # 12 to remove reference to Rolling Ridge subdivision.
b. Verify the requirements for perforated pipe between Catch Basin # 4 and
Storm Manhole # 3.
c. Revise demolition plan to denote the removal of additional curb and gutter
in the existing parking lot on the west side of the site.
This review was performed for the Development Review Committee meeting. The major
areas oT review inCluded availability or water and sewer, easement restrictions,
stormwater management, driveway connections, parking lot layout, access for solid waste
collectioh, sidewalk provisions with handicap accessibility and environmental concerns.
Further submittals may be necessary for more technical review in order to reach
approval for a building permit.
John B. Geurin, P. E.
City Engi neer
U:\ Public Works Admin\ New Developments\ Landmark Center\ Lanclmark- 02- DRC.070515.doc
CITY OF FORT WALTON BEACH, FLORIDA
MEMORANDUM
DATE: April 30, 2007
TO: Christy Johnson, CRA Planner
FROM: . John B. Geurin, Engineering Division
SUBJECT: THE LANDMARK CENTER
MIRACLE STRIP PARKWAY AND PERRY AVE.
I have reviewed the preliminary site information for the Public Works Department of
the above referenced development which was submitted for the DRC to be held May 3,
2007. the Engineering Division offers the following comments in order to reach plan
approval by the. Public Works Department; ,
1. Provide a survey of the adjacent properties showing the boundary, all existing
above ground and underground features and existing topography. The survey shall
also include the following:
a. the locations of any existing setbacks; easements, alleys, rights- of- ways,
etc. that are on, or immediately adjacent to, the property.
b. the locations of all existing utility lines that are on, or immediately
adjacent to, the property to include water, sanitary sewer, storm sewer,
natural gas and electrical.
c. a legal description of the property to be developed. If multiple parcels are '
to be developed under this project, legal descriptions of each individual
parcel shall be included.
cl. the verfical datum used ( NGVD ' 29 or NA VD ' 881 shall be noted on the
survey and construction' documents.
e. the survey shall be signed and sealed by a land surveyor registered in the
State of FloridC1 in accordance with applicable State statutes.
that will be
2. Identify any easements that are to be abandoned and new easements
required. For new easement, identify the type of easement and provide legal
description.
3. Revise survey by Choctaw Engineering to show existing water and sanitary sewer
features Avenue. Revise plans accordingly to show these features.
along Perry
4. Show dimensions of each parking area ( stall size, etc.).
5. Provide a crosswalk at the north driveway entrance. The crosswalk shall comply
with the Manual on Uniform Traffic Control Devices ( MUTCD). A copy of the
pertinent section is provided.
6. Show dimensions of dumpster enclosure. City Standard ST- 14 is provided. Place
a
note on the plans stating that the minimum opening for the enclosure is
10' - 6".
7. Remove driveway apron along Perry Avenue on the east side of the site and
replace with roll back curb and gutter (detail provided).
8. Extend existing sidewalk on Perry Avenue south an~ tie in to the existing
sidewalk
at the Perry Avenue/ Highway 98 intersection.
the
9. A Letter of Credit to the City of Fort Walton Beach will be required for
installation of the proposed public sidewalk along Perry Avenue. The Letter of
Credit will be released after of sidewalk is approved by the Public
completion
Works Department. A copy of an acceptable format for a Letter of Credit will
be
provided at the DRC meeting.
code.
10. Provide handic.ap ed ramps at all raised curbs per Florida Accessibility
Install detectable warning mats as noted on FDOT standards ( provided).
11. Show footprint for proposed parking garage. Verify that there are no conflicts
between the proposed garage and the proposed parking area.
12. Add suffici.ent sp.ot ele. vati.o.ns to the grading-plan to demonstrate that. call runoff
flows to the proposed drainage system.
16
13. New driveway connection shall comply with City Standards ST- l1 and ST
provided). Add details to the plans.
14. Show location of the proposed construction entrance and detail..
provide
15. Add standard notes as noted on the handout
provided.
16. A Stormwater management plan that meets the
City' s stormwater regulations ( a
copy provided) shall be submitted for approval. Stormwater runoff from the
entire site must be treated, including runoff from the
driveways.
a. Notice of aJ3proval from the Florida Department of environmental
Protection ( FDEP) for the stormwater management
plan must be provided
prior to the City' s approval for a building permit.
b. Copies of FDEP and NPDES permits shall be submitted for approval prior
the City' s approval of the building permit.
c. Must. meet FDEP environmental regulations and Florida Department of
Transportation ( FDOT) standards for sediment and soil erosion control.
This review was performed for the Development Review Committee
meeting. Themajor
arects of review included ~
vailability of water and sewer, easement restrictions,
stormwater management, driveway connection~,
parking lot layout, access for solid waste
collection, sidewalk provisions with handicap
accessibility and environmental concerns.
Further submittals may be necessary for more technical review in order to reach
approval for a building permit.
John B. Geurin, P. E.
City Engineer
U:\ E'ngineering - Office.\Reviews\ 5E Quad\ Landmnrk- 02- DRC.070427.doc
CITY OF FORT WALTON BEACH, FLORIDA
MEMORANDUM
DATE: May 24, 2007
TO: David E. Smith, P. E.,Moore Bass Consulting
FROM: Michael D. Beedie, P. E., Utilities Operations Manager
SUBJECT: DRC Plan Review for The Landmark Center ( Perry Avenue SE & Miracle Strip
Parkway SE)
I have reviewed the site plan infarmation for the above referenced development which was
submitted for the DRC to be held May 24, 2007. The Utilities Department offers the fallawing
comments in order to. reach plan approval:
Concurrency Comments:
1) A completed Concurrency Package was submitted with this package. The estimated
water demand was indicated as 39,990 gpd, and the estimated sewer demand was
30, 659 gpd.
Water & Sewer Comments:
1) The Utility Plan shall clearly indicate any praposed water mains and service lines. This
shall include the size and locatian af taps, water meters, fire hydrants, etc. The City' s
Water Reference Maps indicating the existing water system in the vicinity af the
project have been attached ( See Water Reference Nas. 185, 263, 309, 310, & 361).