five civns for review by various departments 5) Provide two extra sets qf cQmpleted plans for review by fire Dept and 1 nspe.c!.i on. . .' .... ". 3) $ how site ' a<? c.essibllity. in accordance with Section 11.of FBG 7) Include a completed Title Page 8) Include Flood Zone 9) Provide th( eshold '", spector name and certifications. N'ote on plans that inspection reports shall also be forwarded to th~ Inspection Dept of City Han' . 10) No~e oriplans that as built surVeys will be requIred after slab inspections 11) Stip~ latG termite treatments r;' ~~~~~ 11' '':' I \. A,permanent str~et addr~ss shall be provid~ d at final inspection t2) 1.3) All signage shall be permitted separately 14) Show back flow preventor and note on piansthat AI Jordan of our Water Ops Dept ( at 833-9630) shall be can~ d for a final inspection' of the w backfh;> 15) Include all required transition strips at egress / ingress points to site 16) Submit an product approvals . .. h ~I" . . f""''-' i.~:-:. .', I' _~ I .., ........... CITY OF FORT WALTON BEACH, FLORIDA MEMORANDUM DATE: May 15, 2007 TO: Christy Johnson, CRA Planner FROM: John B. Geurin, Engineering Division SUBJECT: THE LANDMARK CENTE'R MIRACLE STRIP PARKWAY AND PERRY AVE. I have reviewed the preliminary site information for the Public Works Department of the above referenced development which was re- submitted for the DRC to be held May 24, 2007. The Engineering Division offers the following comments in order to reach plan approval by the Public Works Department: 1. All issues identified on my review memo dated April 30,' 2007 are still outstanding and will have to be resolved in order to gain approval by the Public Works Department. 2. The following additional comments are offered to gain plan approval: a. Revise General Note # 12 to remove reference to Rolling Ridge subdivision. b. Verify the requirements for perforated pipe between Catch Basin # 4 and Storm Manhole # 3. c. Revise demolition plan to denote the removal of additional curb and gutter in the existing parking lot on the west side of the site. This review was performed for the Development Review Committee meeting. The major areas oT review inCluded availability or water and sewer, easement restrictions, stormwater management, driveway connections, parking lot layout, access for solid waste collectioh, sidewalk provisions with handicap accessibility and environmental concerns. Further submittals may be necessary for more technical review in order to reach approval for a building permit. John B. Geurin, P. E. City Engi neer U:\ Public Works Admin\ New Developments\ Landmark Center\ Lanclmark- 02- DRC.070515.doc CITY OF FORT WALTON BEACH, FLORIDA MEMORANDUM DATE: April 30, 2007 TO: Christy Johnson, CRA Planner FROM: . John B. Geurin, Engineering Division SUBJECT: THE LANDMARK CENTER MIRACLE STRIP PARKWAY AND PERRY AVE. I have reviewed the preliminary site information for the Public Works Department of the above referenced development which was submitted for the DRC to be held May 3, 2007. the Engineering Division offers the following comments in order to reach plan approval by the. Public Works Department; , 1. Provide a survey of the adjacent properties showing the boundary, all existing above ground and underground features and existing topography. The survey shall also include the following: a. the locations of any existing setbacks; easements, alleys, rights- of- ways, etc. that are on, or immediately adjacent to, the property. b. the locations of all existing utility lines that are on, or immediately adjacent to, the property to include water, sanitary sewer, storm sewer, natural gas and electrical. c. a legal description of the property to be developed. If multiple parcels are ' to be developed under this project, legal descriptions of each individual parcel shall be included. cl. the verfical datum used ( NGVD ' 29 or NA VD ' 881 shall be noted on the survey and construction' documents. e. the survey shall be signed and sealed by a land surveyor registered in the State of FloridC1 in accordance with applicable State statutes. that will be 2. Identify any easements that are to be abandoned and new easements required. For new easement, identify the type of easement and provide legal description. 3. Revise survey by Choctaw Engineering to show existing water and sanitary sewer features Avenue. Revise plans accordingly to show these features. along Perry 4. Show dimensions of each parking area ( stall size, etc.). 5. Provide a crosswalk at the north driveway entrance. The crosswalk shall comply with the Manual on Uniform Traffic Control Devices ( MUTCD). A copy of the pertinent section is provided. 6. Show dimensions of dumpster enclosure. City Standard ST- 14 is provided. Place a note on the plans stating that the minimum opening for the enclosure is 10' - 6". 7. Remove driveway apron along Perry Avenue on the east side of the site and replace with roll back curb and gutter (detail provided). 8. Extend existing sidewalk on Perry Avenue south an~ tie in to the existing sidewalk at the Perry Avenue/ Highway 98 intersection. the 9. A Letter of Credit to the City of Fort Walton Beach will be required for installation of the proposed public sidewalk along Perry Avenue. The Letter of Credit will be released after of sidewalk is approved by the Public completion Works Department. A copy of an acceptable format for a Letter of Credit will be provided at the DRC meeting. code. 10. Provide handic.ap ed ramps at all raised curbs per Florida Accessibility Install detectable warning mats as noted on FDOT standards ( provided). 11. Show footprint for proposed parking garage. Verify that there are no conflicts between the proposed garage and the proposed parking area. 12. Add suffici.ent sp.ot ele. vati.o.ns to the grading-plan to demonstrate that. call runoff flows to the proposed drainage system. 16 13. New driveway connection shall comply with City Standards ST- l1 and ST provided). Add details to the plans. 14. Show location of the proposed construction entrance and detail.. provide 15. Add standard notes as noted on the handout provided. 16. A Stormwater management plan that meets the City' s stormwater regulations ( a copy provided) shall be submitted for approval. Stormwater runoff from the entire site must be treated, including runoff from the driveways. a. Notice of aJ3proval from the Florida Department of environmental Protection ( FDEP) for the stormwater management plan must be provided prior to the City' s approval for a building permit. b. Copies of FDEP and NPDES permits shall be submitted for approval prior the City' s approval of the building permit. c. Must. meet FDEP environmental regulations and Florida Department of Transportation ( FDOT) standards for sediment and soil erosion control. This review was performed for the Development Review Committee meeting. Themajor arects of review included ~ vailability of water and sewer, easement restrictions, stormwater management, driveway connection~, parking lot layout, access for solid waste collection, sidewalk provisions with handicap accessibility and environmental concerns. Further submittals may be necessary for more technical review in order to reach approval for a building permit. John B. Geurin, P. E. City Engineer U:\ E'ngineering - Office.\Reviews\ 5E Quad\ Landmnrk- 02- DRC.070427.doc CITY OF FORT WALTON BEACH, FLORIDA MEMORANDUM DATE: May 24, 2007 TO: David E. Smith, P. E.,Moore Bass Consulting FROM: Michael D. Beedie, P. E., Utilities Operations Manager SUBJECT: DRC Plan Review for The Landmark Center ( Perry Avenue SE & Miracle Strip Parkway SE) I have reviewed the site plan infarmation for the above referenced development which was submitted for the DRC to be held May 24, 2007. The Utilities Department offers the fallawing comments in order to. reach plan approval: Concurrency Comments: 1) A completed Concurrency Package was submitted with this package. The estimated water demand was indicated as 39,990 gpd, and the estimated sewer demand was 30, 659 gpd. Water & Sewer Comments: 1) The Utility Plan shall clearly indicate any praposed water mains and service lines. This shall include the size and locatian af taps, water meters, fire hydrants, etc. The City' s Water Reference Maps indicating the existing water system in the vicinity af the project have been attached ( See Water Reference Nas. 185, 263, 309, 310, & 361).

Download this text file with its original spacing ↓