Preserved among the August 6, 2015 Okaloosa County Board of County Commissioners meeting materials (IQM2 meeting 1293). The date shown is the verified meeting context, not an independently established creation date for every attachment. The download catalog used ; the meeting date was corrected using the agenda/minutes heading and matching source filename.
Original publication
Road Construction
Date
August 6, 2015
Publisher
Okaloosa County Board of County Commissioners
Where to find it
3
Reference collection
Okaloosa County Board of County Commissioners (IQM2 public portal)
Source date and document identity checked for this intake. Machine text has not received independent human proofreading.
HOW FAR THIS HAS BEEN CHECKED
File / copy authenticity
Preserved files carry a SHA-256 fingerprint fixed at ingest; whether those bytes match the original capture is not independently verified.
Transcription / extraction
Each reading-text file shows its recorded review status below.
Machine extraction of the preserved PDF embedded text using pdftotext -layout. Form-feed page boundaries retained; no words rewritten. Not independently human proofread; consult the original for layout and uncertain characters.
Compare reading text with the preserved source. Line breaks and spacing are retained; long lines wrap to fit the screen. A file's role does not establish that its text has been checked.
Road Construction — extracted reading text
Machine-extracted OCR text · Review label: Known limitations
BOARD OF COUNTY COMMISSIONERS
OKALOOSA COUNTY, FLORIDA
SERVICE AREA: TRANSPORTATION
DEPARTMENT/PROGRAM: ROAD/BRIDGE CONSTRUCTION
PROGRAM DESCRIPTION: The Public Works Department provides to the public; road and stormwater
construction, enhancement, and replacement; resurfacing and open graded hot mix asphalt (formerly cold mix
base stabilization); bridge construction; and other major infrastructure construction services. Projects are
performed by in-house staff as well as contract services. The division also provides both rescue and recovery
operations during disasters and other emergencies which impact road and stormwater infrastructure
REVENUE: Road and Bridge Construction is funded within the Road & Bridge Construction Fund.
Supporting revenue of the Road & Bridge Construction Fund are “non-discretionary” (local option gas tax
(LOGT)) fuel taxes, constitutional gas taxes (CGT), interest, other miscellaneous revenue and state grants.
MAJOR ACCOMPLISHMENTS LAST YEAR:
Ø Robinson Road – began dirt to pave project – 1.9 miles
Ø Davis Road – began dirt to pave project
Ø Foxwood Subdivision Phase III – begin final phase of major storm-water rehabilitation
Ø Mount Olive Road – Resurfacing
Ø Lake Lorraine – Major storm-water rehabilitation
Ø Old Ebenezer – overlay/preservation of cold mix
Ø Okaloosa Lane Bridge construction – via Okaloosa Restore Act
Ø PJ Adams Emergency Overlay - ~ two miles
Ø Millings Conversion Roads
o William Gary Johnson Rd
Ø Resurfacing/Road Preservation
31.5 miles of road resurfaced/chip sealed/micro-surfaced
PROGRAM GOAL: The mission of the Okaloosa County Public Works Department is to provide
transportation and infrastructure services to residents and visitors of Okaloosa County. The goal is to
accomplish this mission through its six primary divisions: Engineering, Environmental Services, Traffic
Operations, Roads, Resources, and Administrative Services.
KEY OBJECTIVES:
1. To construct the roads, bridges, and associated infrastructure to support the transportation needs of
unincorporated Okaloosa County.
2. Complete the annual Overlay Program for Commissioner Districts 1 – 5.
3. Rehabilitate cold mix roads that are currently near or beyond their life expectancy
4. Oversee contracted construction projects.
5. Convert wooden bridges to concrete.
6. Oversee/Construct Emergency Watershed Projects.
7. Stabilize dirt roads with millings.
8. Antioch Road – Drainage improvements and resurface.
9. Okaloosa Lane – Dirt to pave & Bridge project
10. Kervin Road – Install drainage swales and stabilize road.
11. Robinson Road – Dirt to pave.
12. Davis Road – Dirt to pave.
13. Live Oak Church Road-Overlay
PERFORMANCE MEASURES:
Actual Estimated Adopted
Performance Measures
FY12/13 FY13/14 FY14/15
Number of FTEs 95 95 94
Input Constitutional / Local Option Gas Tax Projected Revenue $3,450,000 $3,450,000 $3,450,000
Miles of roads resurfaced 19.8 20.1 27
Output Miles of roads restriped (focus was on School Zones) 24.7 25 8
Jurisdictional miles of roads maintained 939 942 946
Efficiency
Miles of cold mix stabilized roads rehabilitated 8 10 5.3
Effectivenes
Miles of dirt roads improved 0.9 0.84 10
Bridge conversions (c
Only a preview is loaded on this record page. The linked reading pages contain the remaining text and work without JavaScript.
Citation & reuse
Okaloosa County Board of County Commissioners. “Okaloosa County BOCC — August 6, 2015 — Road Construction.” August 6, 2015. Road Construction. Crypt of Echoes evidence ID LED-2026-ece82aa02be84eb0abafa842e7579542. http://127.0.0.1:58097/evidence/LED-2026-ece82aa02be84eb0abafa842e7579542. Accessed [date].
Catalogue citation: Okaloosa County Board of County Commissioners, Road Construction, meeting materials for August 6, 2015. https://okaloosacountyfl.iqm2.com/Citizens/FileOpen.aspx?Type=4&ID=9039&MeetingID=1293
Preserved county public-record source. Third-party attachments may retain their original rights.