flexible bollards, lane markings, and signage.
Further Potential Modification: Emphasize the left-turn restriction. This
would be accomplished with a median island to channel the traffic.
Benefit: Decreases US 98 traffic delays caused by left- turning vehicles.
Status:
FDOT approved the immediate modification.
An FDOT contractor will install the thermoplastic striping in
coordination with their striping at the US 98/ SR 85/Brooks Street
intersection. Estimated timing - mid- February.
VMS, the FDOT asset management contractor, will install the flexible
bollards and signage after the striping is installed. Estimated timing -
mid- February.
Photo 1: US 98/ Ferrv Road Intersection
Further Potential Modification
Immediate Modification
US 98 Congestion Traffic Congestion Improvement Project (As of 2/ 1/07)
Location: US 98/Municipal Parking Lot (just west of Florida Place)
Immediate Modification: Eliminate left-turn movements at this intersection,
making the Municipal Parking Lot access right- in and right- out only. This
would be accomplished with flexible bollards and signage.
Benefit: Decreases US 98 traffic delays caused by left-turning vehicles.
Status:
FDOT approved the immediate modification.
VMS, the FDOT asset management contractor, will install the flexible
bollards and signage in coordination with the bollards and signage
installation at the US 98/ Ferry Road intersection ( or sooner). Estimated
timing - mid- February.
Photo 2: US 98/ Municioal Parkina Lot
Immediate Modification
US 98 Congestion Traffic Congestion Improvement Project (As of 2/ 1/07)
Location: US 98 at Florida Place
Immediate Modification: Relocate the stop bar for the southmost westbound
lane, moving it east in order to increase the radius for the Florida Place
vehicles turning east onto US 98.
Benefit: Improve traffic safety by providing greater separation between
vehicles in the intersection.
Status:
FDOT approved the immediate modification.
An FDOT contractor will install the thermoplastic striping in
coordination with their striping installation at the US 98/ SR 85/Brooks
Street intersection. Estimated timing - mid- February.
Photo 3: US 98 at Florida Place
Immediate Modification