READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — 2013 meeting #1141 (date undetermined) — EMPG Agreement 2013-2014 — reading text
Part 6 of 9. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — 07-EMPG Agreement 2013-2014.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
of HSEEP. This refers to costs related to developing and maintaining a self-sustaining
State HSEEP which is modeled after the national HSEEP
* Other items. These costs are limited to items consumed in direct support of exercise activities such as the
rental of space/locations for planning and conducting an exercise, rental of equipment, and the
procurement of other essential nondurable goods. Grantees are encouraged to use free public
space/locations, whenever available, prior to the rental of space/locations. Costs associated with inclusive
17
practices and the provision of reasonable accommodations and modifications that facilitate full access for
children and adults with disabilities.
Unauthorized exercise-related costs include:
+ Reimbursement for the maintenance and/or wear and tear costs of general use vehicles (e.g., construction
vehicles) and emergency response apparatus (e.g., fire trucks, ambulances). The only vehicle costs that
are reimbursable are fuel/gasoline or mileage.
* Equipment that is purchased for permanent installation and/or use, beyond the scope of exercise conduct
(e.g., electronic messaging signs)
* Durable and non-durable goods purchased for installation and/or use beyond the scope of exercise
conduct
E. Equipment
Allowable equipment categories for the EMPG Program are listed on the web-based version of the Authorized
Equipment List (AEL) on the Responder Knowledge Base (RKB), which is sponsored by FEMA at
htip./www.rkb.us. Unless otherwise stated, equipment must meet all mandatory regulatory and/or FEMA-
adopted standards to be eligible for purchase using these funds. In addition, counties will be responsible for
obtaining and maintaining all necessary certifications and licenses for the requested equipment.
The select allowable equipment includes equipment from the following AEL categories:
Information Technology (Category 4)
Cyber-Security Enhancement Equipment (Category 5)
Interoperable Communications Equipment (Category 6)
Detection Equipment (Category 7)
Power Equipment (Category 10)
Chemical, Biological, Radiological, Nuclear, and Explosive (CBRNE) Reference Materials (Category 11)
CBRNE Incident Response Vehicles (Category 12)
Physical Security Enhancement Equipment (Category 14)
CBRNE Logistical Support Equipment (Category 19)
Other Authorized Equipment (Category 21)
ee ee
In addition to the above, general purpose vehicles (such as sports utility vehicles) are allowed to be procured in
order to carry out the responsibilities of the EMPG Program. If State agencies and/or local governments have
questions concerning the eligibility of equipment not specifically addressed in the AEL, they should contact their
contract manager who will coordinate with the FEMA Regional Program Analyst for clarification.
F. Management and Administration (M&A)
M&A activities are those defined as directly relating to the management and administration of EMPG Program
funds, such as financial management and monitoring. It should be noted that salaries of State and local
emergency managers are not typically categorized as M&A, unless the State or local EMA chooses to assign
personnel to specific M&A activities.
EHP
Recipients must comply with all applicable EHP laws, regulations, and Executive Orders (EQs) in order to draw
down their FY 2013 EMPG Program grant funds. Any project with the potential to impact natural resources or
historic properties cannot be initiated until FEMA has completed the required FEMA EHP review. Recipients
that implement projects prior to receiving EHP approval from FEMA risk de-obligation of funds. For these types
of projects, Recipients must complete the FEMA EHP Screening Form (OMB Number 1660-0115/FEMA Form
024-0-01) and submit it, with all supporting documentation to their Contract Manager. Recipients should submit
the FEMA EHP Screening Form for each project as soon as possible upon receiving their grant award. The
Screening Form must be submitted prior to funds being expended. Refer to IBs 329, 345, and 356 (located at
http:/vww.fema.gov/governmeni/grant/bulletins/index. shim)
18
The following types of EMPG projects are to be submitted to FEMA for compliance review under EHP laws and
requirements prior to initiation of the project:
= Any involvement with the installation of equipment,
= Ground-disturbing activities,
= New construction (installation and renovation), including communication towers, or
modification/renovation of existing buildings or structures
= Proposed construction or renovation projects that are part of larger projects funded from a non-FEMA
source (such as an EOC that is part of a larger proposed public safety complex)
= Renovation of and modification to buildings and structures that are 50 years old or older
= Any other construction or renovation efforts that change or expand the footprint of a facility or
structure including security enhancements to improve perimeter security
= Physical Security Enhancements, including but not limited to:
« — Lighting
« Fencing
« Closed-circuit television (CCTV) systems
* Motion detection systems
« Barriers, doors, gates and related security enhancements
= Field based training and exercises including activities that involve ground disturbance, use of
explosives, toxic agents or otherwise have the potential to cause impact to the environment or
historical resources. This is only a requirement if the exercise or field training is not being conducted
by a certified professional or at an existing facility with established procedures.
» Communication tower projects
The following activities do not require the submission of the FEMA EHP Screening Form: planning and
development of policies or processes; management and administration; classroom-based training; table top
exercises and functional exercises; and, acquisition of mobile and portable equipment (no installation).
All recipients of financial assistance will comply with the requirements of the NEPA, as amended, 42 U.S.C.
§4331 et seq., which establishes national policy goals and procedures to protect and enhance the environment,
including protection against natural disasters. To comply with NEPA for its grant-supported activities, DHS
requires the environmental aspects of construction grants (and certain non-construction projects as specified by
the component and awarding office) to be reviewed and evaluated before final action on the application.
For more information on FEMA’s EHP requirements, see Informational Bulletins below”
e = Information Bulletin 329, Environmental Planning and Historic Preservation Requirements for Grants,
available at http:/Awww fema.gov/pdf/government/grant/bulletins/info329. pdf;
« information Bulletin 345, Programmatic Environmental Assessment, available at
http:/Avww.fema.gov/pdf/government/grant/bulletins/info345.pdf; and
e Information Builetin 356, EHP Screening Form, available at
http:/Avww.fema.gov/pdf/government/grant/bulletins/info356. pdf.
Construction and Renovation
Construction and renovation activities for a local government's EOC as defined by the SAA are allowable under
the EMPG Program.
Written approval must be provided by FEMA prior to the use of any EMPG Program funds for construction or
renovation. Requests for EMPG Program funds for construction of an EOC must be accompanied by an EOC
Investment Justification (FEMA Form 089-0-0-3; OMB Control Number; 1660-0124 (available through ND
grants) to their Grant Program Manager for review. Additionally, grantees are required to submit a SF-424C
Budget and Budget detail citing the project costs.
When applying for funds to construct communication towers, grantees and sub-grantees must submit evidence
that the FCC’s Section 106 review process has been completed and submit all documentation resulting from
that review to GPD prior to submitting materials for EHP review. Grantees and sub-grantees are also
encouraged to have completed as many steps as possible for a successful EHP review in support of their
19
proposal for funding (e.g., coordination with their State Historic Preservation Office to identify potential historic
preservation issues and to discuss the potential for project effects, compliance with all State and EHP laws and
requirements). Projects for which the grantee believes an Environmental Assessment (EA) may be needed, as
defined in 44 CFR 10.8 and 10.9, must also be identified to the FEMA Program Analyst within six months of the
award and completed EHP review materials must be submitted no later than 12 months before the end of the
period of performance. EHP review packets should be sent to godehpinfo@fema.gov.
EMPG Program grantees using funds for construction projects must comply with the Davis-Bacon Act (40
U.S.C. 3141 ef seq.). Grant recipients must ensure that their contractors or subcontractors for construction
projects pay workers employed directly at the work-site no less than the prevailing wages and fringe benefits
paid on projects of a similar character. Additional information, including Department of Labor (DOL) wage
determinations, is available from the following website:
htto://www.dol.gov/complianceAaws/comp-dbra. htm.
Maintenance and Sustainment
The use of FEMA preparedness grant funds for maintenance contracts, warranties, repair or replacement
costs, upgrades, and user fees are allowable under all active and future grant awards, unless otherwise noted.
EMPG Program grant funds are intended to support the NPG and fund activities and projects that build and
sustain the capabilities necessary to prevent, protect against, mitigate the effects of, respond to, and recover
from those threats that pose the greatest risk to the security of the Nation. In order to provide grantees the
ability to meet this objective, the policy set forth in GPD’s IB 379 (Guidance to State Administrative Agencies to
Expedite the Expenditure of Certain DHS/FEMA Grant Funding) allows for the expansion of eligible
maintenance and sustainment costs which must be in 1) direct support of existing capabilities; (2) must be an
otherwise allowable expenditure under the applicable grant program; (3) be tied to one of the core capabilities
in the five mission areas contained within the National preparedness Goal, and (4) shareable through the
Emergency Management Assistance Compact. Additionally, eligible costs must also be in support of
equipment, training, and critical resources that have previously been purchased with either Federal grant or any
other source of funding other than DHS/FEMA preparedness grant program dollars.
Unallowable Costs
+ Expenditures for weapons systems and ammunition
* Costs to support the hiring of sworn public safety officers for the purposes of fulfilling traditional public
safety duties or to supplant traditional public safety positions and responsibilities
* Activities unrelated to the completion and implementation of the EMPG Program
In general, recipients should consult with their contact manager; who will coordinate with the FEMA Regional
Program Analyst prior to making any Investment that does not clearly meet the allowable expense criteria
established in this Guidance.
20
Attachment D
Deliverables
The objective of this funding is to assist in providing operating support for the areas outlined in
Attachment B and C to maintain a county emergency management program. The objective is to help fund
the county Emergency Management programs and maintain a 24-7 (this includes on-call coverage) daily
response to county emergencies. The minimum acceptable standard for payment is a twelve month 24-7
operation. Emergency Management operation below the minimum standard will result in a prorated
reduction in payment.
In addition, the County is to achieve the following emergency management goals throughout the contract
period to ensure county compliance and coordination with the state emergency management. Items listed
below are to be reviewed during the mid-year and
