READ ALONGSIDE THE SOURCE

Okaloosa County BOCC — 2013 meeting #1141 (date undetermined) — EMPG Agreement 2013-2014 — reading text

Part 6 of 9. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — 07-EMPG Agreement 2013-2014.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

of HSEEP. This refers to costs related to developing and maintaining a self-sustaining State HSEEP which is modeled after the national HSEEP * Other items. These costs are limited to items consumed in direct support of exercise activities such as the rental of space/locations for planning and conducting an exercise, rental of equipment, and the procurement of other essential nondurable goods. Grantees are encouraged to use free public space/locations, whenever available, prior to the rental of space/locations. Costs associated with inclusive 17 practices and the provision of reasonable accommodations and modifications that facilitate full access for children and adults with disabilities. Unauthorized exercise-related costs include: + Reimbursement for the maintenance and/or wear and tear costs of general use vehicles (e.g., construction vehicles) and emergency response apparatus (e.g., fire trucks, ambulances). The only vehicle costs that are reimbursable are fuel/gasoline or mileage. * Equipment that is purchased for permanent installation and/or use, beyond the scope of exercise conduct (e.g., electronic messaging signs) * Durable and non-durable goods purchased for installation and/or use beyond the scope of exercise conduct E. Equipment Allowable equipment categories for the EMPG Program are listed on the web-based version of the Authorized Equipment List (AEL) on the Responder Knowledge Base (RKB), which is sponsored by FEMA at htip./www.rkb.us. Unless otherwise stated, equipment must meet all mandatory regulatory and/or FEMA- adopted standards to be eligible for purchase using these funds. In addition, counties will be responsible for obtaining and maintaining all necessary certifications and licenses for the requested equipment. The select allowable equipment includes equipment from the following AEL categories: Information Technology (Category 4) Cyber-Security Enhancement Equipment (Category 5) Interoperable Communications Equipment (Category 6) Detection Equipment (Category 7) Power Equipment (Category 10) Chemical, Biological, Radiological, Nuclear, and Explosive (CBRNE) Reference Materials (Category 11) CBRNE Incident Response Vehicles (Category 12) Physical Security Enhancement Equipment (Category 14) CBRNE Logistical Support Equipment (Category 19) Other Authorized Equipment (Category 21) ee ee In addition to the above, general purpose vehicles (such as sports utility vehicles) are allowed to be procured in order to carry out the responsibilities of the EMPG Program. If State agencies and/or local governments have questions concerning the eligibility of equipment not specifically addressed in the AEL, they should contact their contract manager who will coordinate with the FEMA Regional Program Analyst for clarification. F. Management and Administration (M&A) M&A activities are those defined as directly relating to the management and administration of EMPG Program funds, such as financial management and monitoring. It should be noted that salaries of State and local emergency managers are not typically categorized as M&A, unless the State or local EMA chooses to assign personnel to specific M&A activities. EHP Recipients must comply with all applicable EHP laws, regulations, and Executive Orders (EQs) in order to draw down their FY 2013 EMPG Program grant funds. Any project with the potential to impact natural resources or historic properties cannot be initiated until FEMA has completed the required FEMA EHP review. Recipients that implement projects prior to receiving EHP approval from FEMA risk de-obligation of funds. For these types of projects, Recipients must complete the FEMA EHP Screening Form (OMB Number 1660-0115/FEMA Form 024-0-01) and submit it, with all supporting documentation to their Contract Manager. Recipients should submit the FEMA EHP Screening Form for each project as soon as possible upon receiving their grant award. The Screening Form must be submitted prior to funds being expended. Refer to IBs 329, 345, and 356 (located at http:/vww.fema.gov/governmeni/grant/bulletins/index. shim) 18 The following types of EMPG projects are to be submitted to FEMA for compliance review under EHP laws and requirements prior to initiation of the project: = Any involvement with the installation of equipment, = Ground-disturbing activities, = New construction (installation and renovation), including communication towers, or modification/renovation of existing buildings or structures = Proposed construction or renovation projects that are part of larger projects funded from a non-FEMA source (such as an EOC that is part of a larger proposed public safety complex) = Renovation of and modification to buildings and structures that are 50 years old or older = Any other construction or renovation efforts that change or expand the footprint of a facility or structure including security enhancements to improve perimeter security = Physical Security Enhancements, including but not limited to: « — Lighting « Fencing « Closed-circuit television (CCTV) systems * Motion detection systems « Barriers, doors, gates and related security enhancements = Field based training and exercises including activities that involve ground disturbance, use of explosives, toxic agents or otherwise have the potential to cause impact to the environment or historical resources. This is only a requirement if the exercise or field training is not being conducted by a certified professional or at an existing facility with established procedures. » Communication tower projects The following activities do not require the submission of the FEMA EHP Screening Form: planning and development of policies or processes; management and administration; classroom-based training; table top exercises and functional exercises; and, acquisition of mobile and portable equipment (no installation). All recipients of financial assistance will comply with the requirements of the NEPA, as amended, 42 U.S.C. §4331 et seq., which establishes national policy goals and procedures to protect and enhance the environment, including protection against natural disasters. To comply with NEPA for its grant-supported activities, DHS requires the environmental aspects of construction grants (and certain non-construction projects as specified by the component and awarding office) to be reviewed and evaluated before final action on the application. For more information on FEMA’s EHP requirements, see Informational Bulletins below” e = Information Bulletin 329, Environmental Planning and Historic Preservation Requirements for Grants, available at http:/Awww fema.gov/pdf/government/grant/bulletins/info329. pdf; « information Bulletin 345, Programmatic Environmental Assessment, available at http:/Avww.fema.gov/pdf/government/grant/bulletins/info345.pdf; and e Information Builetin 356, EHP Screening Form, available at http:/Avww.fema.gov/pdf/government/grant/bulletins/info356. pdf. Construction and Renovation Construction and renovation activities for a local government's EOC as defined by the SAA are allowable under the EMPG Program. Written approval must be provided by FEMA prior to the use of any EMPG Program funds for construction or renovation. Requests for EMPG Program funds for construction of an EOC must be accompanied by an EOC Investment Justification (FEMA Form 089-0-0-3; OMB Control Number; 1660-0124 (available through ND grants) to their Grant Program Manager for review. Additionally, grantees are required to submit a SF-424C Budget and Budget detail citing the project costs. When applying for funds to construct communication towers, grantees and sub-grantees must submit evidence that the FCC’s Section 106 review process has been completed and submit all documentation resulting from that review to GPD prior to submitting materials for EHP review. Grantees and sub-grantees are also encouraged to have completed as many steps as possible for a successful EHP review in support of their 19 proposal for funding (e.g., coordination with their State Historic Preservation Office to identify potential historic preservation issues and to discuss the potential for project effects, compliance with all State and EHP laws and requirements). Projects for which the grantee believes an Environmental Assessment (EA) may be needed, as defined in 44 CFR 10.8 and 10.9, must also be identified to the FEMA Program Analyst within six months of the award and completed EHP review materials must be submitted no later than 12 months before the end of the period of performance. EHP review packets should be sent to godehpinfo@fema.gov. EMPG Program grantees using funds for construction projects must comply with the Davis-Bacon Act (40 U.S.C. 3141 ef seq.). Grant recipients must ensure that their contractors or subcontractors for construction projects pay workers employed directly at the work-site no less than the prevailing wages and fringe benefits paid on projects of a similar character. Additional information, including Department of Labor (DOL) wage determinations, is available from the following website: htto://www.dol.gov/complianceAaws/comp-dbra. htm. Maintenance and Sustainment The use of FEMA preparedness grant funds for maintenance contracts, warranties, repair or replacement costs, upgrades, and user fees are allowable under all active and future grant awards, unless otherwise noted. EMPG Program grant funds are intended to support the NPG and fund activities and projects that build and sustain the capabilities necessary to prevent, protect against, mitigate the effects of, respond to, and recover from those threats that pose the greatest risk to the security of the Nation. In order to provide grantees the ability to meet this objective, the policy set forth in GPD’s IB 379 (Guidance to State Administrative Agencies to Expedite the Expenditure of Certain DHS/FEMA Grant Funding) allows for the expansion of eligible maintenance and sustainment costs which must be in 1) direct support of existing capabilities; (2) must be an otherwise allowable expenditure under the applicable grant program; (3) be tied to one of the core capabilities in the five mission areas contained within the National preparedness Goal, and (4) shareable through the Emergency Management Assistance Compact. Additionally, eligible costs must also be in support of equipment, training, and critical resources that have previously been purchased with either Federal grant or any other source of funding other than DHS/FEMA preparedness grant program dollars. Unallowable Costs + Expenditures for weapons systems and ammunition * Costs to support the hiring of sworn public safety officers for the purposes of fulfilling traditional public safety duties or to supplant traditional public safety positions and responsibilities * Activities unrelated to the completion and implementation of the EMPG Program In general, recipients should consult with their contact manager; who will coordinate with the FEMA Regional Program Analyst prior to making any Investment that does not clearly meet the allowable expense criteria established in this Guidance. 20 Attachment D Deliverables The objective of this funding is to assist in providing operating support for the areas outlined in Attachment B and C to maintain a county emergency management program. The objective is to help fund the county Emergency Management programs and maintain a 24-7 (this includes on-call coverage) daily response to county emergencies. The minimum acceptable standard for payment is a twelve month 24-7 operation. Emergency Management operation below the minimum standard will result in a prorated reduction in payment. In addition, the County is to achieve the following emergency management goals throughout the contract period to ensure county compliance and coordination with the state emergency management. Items listed below are to be reviewed during the mid-year and

Download this text file with its original spacing ↓