READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — August 24, 2013 — West Hangar Area Public Parking and ECA Terminal Development Internal Coordination Sheet_Tabulation of Bids_Recommendation of Award Letter — reading text
Part 1 of 1. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — 08-West Hangar Area Public Parking and ECA Terminal Development Internal Coordination Sheet_Tabulation of Bids.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
CONTRACT & LEASE INTERNAL COORDINATION SHEET
Contract/Lease Number: Tracking Number: MIL]
Contractor/Lessee Name: Birkshire Johnstone, LLC. Grant Funded: YES_X_ NO___
Purpose: Award the construction contract with Birkshire Johnstone, LLC.
Date/Term: 1. BX} GREATER THAN $50,000
Amount: $580,269.93 2. L.) GREATER THAN $25,000
Department: Bob Sikes CEW 3. L] $25,000 OR LESS
Dept. Monitor Name: Sunil Harman
Document has been reviewed and includes any attachments or exhibits.
Purchasing Review
Procur ir¢ments are met:
Date: 08-(r-|%
Purchasing Director or designee
Risk Management Review
Approved as written:
Date:
Risk Manager or designee
County Attorney Review
Approved as written:
Date:
County Attorney
Following Okaloosa County approval:
Contract & Grant
Document has been received:
Date:
Contracts & Grants Manager
FULL SERVICE FBO FACILTIES |
Aversft Me PRLS
August 7, 2013
Tracy Stage
Deputy Director of Airports
Okaloosa County
1701 State Road 85 North
Fort Walton Beach, FL 32542
Dear Mr. Stage,
This letter serves as an expression of my understanding of our path forward on the Bob Sikes Airport
West Hangar Area Public Parking and ECA Terminal Development Project.
As verbally discussed, I have awarded Schedule C to Robert Cadenhead, a local Crestview contractor.
Mr. Cadenhead’s quote and our contract have previously been provided to you as courtesy copies. I feel
confident in Mr. Cadenhead’s ability to undertake and successfully complete this project at a
competitive cost, but most importantly I enjoy that he is a local contractor utilizing local subcontractors.
Supporting my local economy is very important to me.
As far as Schedule B, I do commit to the award to Birkshire Johnstone, LLC under the name Okaloosa
County for a grand total of $37,170.00. I will reimburse Okaloosa County this amount at the completion
of the project. As we both agree, this is the best solution as far as efficiency is concerned.
I am much aware and appreciative of the hard work and many hours you’ve spent to get us this far on
this project. I look forward to breaking ground and celebrating a successful project with Okaloosa
County in a few months’ time.
Regards,
Tom Rimkus on behalf of
Jonathan Dunn
President/Owner
850-951-3616
Hran On cr Bob Sikes Airport, KCEW
5445 Jobe Gwers Road, Crestwiew FL 32539
A450 3GR A7EG
AVCON, INC.
ENGINEERS & PLANNERS
320 Bayshore Drive, Suite A
Niceville, Florida 32578
Phone: (850) 678-0050
Fax: (850) 678-0040
www.avconinc.com
2010.050.08/Recommendation of Award 6-12-13
June 12, 2013
Mr. Tracy Stage, A.A.E.
Deputy Airports Director
Okaloosa County Airports
1701 State Road 85 North
Eglin Air Force Base, FL 32542
Reference: Tabulation of Bids and Recommendation of Award
West Hangar Area Public Parking and ECA Terminal Development
Bob Sikes Airport, Crestview, Florida
Dear Mr. Stage:
On Thursday, April 30, 2013 at 3:00 p.m. local time, bids were received at the Okaloosa County office at 302
N. Wilson Street in Crestview for the West Hangar Area Public Parking and ECA Terminal Development
project at Bob Sikes Airport (CEW). A total of five bids were received and a tabulation of the bids is enclosed
herein as Attachment A for your reference. The total bid amounts, including Schedules A, B, and C, are
summarized as follows:
Bidder Total Bid Schedule A Schedule B Schedule C
1. Birkshire Johnstone, LLC $1,513,712.13 $550,269.93 $53,442.20 $ 910,000.00
2. _RAM Construction and Dev., LLC $1,541 ,426.93 $640,394.71 $61,739.05 $839,293.17
| Engineer's Opinion of Probable Cost —_$1,584,235.50 $532,355.50 $51,880.00 $1,000,000.00 |
3. Speegle Construction, Inc. $1,659,729.72 $622,905.02 $52,824.70 $ 984,000.00
4, Lord and Son Construction, Inc. $1,679,117.25 $777,307.25 $45,210.50 $ 856,600.00
5. Anderson Columbia Co., Inc. $2,153,951.05 $989,266.87 $77,934.18 $1,086,750.00
As stated in Item 10, Page BF-Page 4 of 6, “the Basis of Award shall be the Total Bid Amount, price and other
factors considered.” Based on our review of the submittals by the five bidders, Birkshire Johnstone, LLC
appears to be a responsible contractor with the lowest Total Bid Amount. We have reviewed the scope of work
and DBE goals with Birkshire Johnstone and have confirmed their understanding of the project.
The Total Bid Amount by Birkshire Johnstone is approximately 4.5% less than the Engineer’s Estimate;
therefore, we believe that the bid amount submitted for this project is reasonable for the proposed work.
Based on our previous coordination, we understand that it is in the County’s best interest to award all work
within any identified funding limitations. As you are also aware, the work contained in Schedules B and C,
which include the ECA Terminal Building and associated site work improvements, is being funded by Emerald
Coast Aviation, Inc. and may or may not be awarded for this project. Therefore, we recommend that the
original contract amount to be awarded reflect Schedule A, which includes the West Hangar Area Public
Parking improvements, and that the County withhold awarding Schedules B and C until it is determined
whether this work will be awarded.
CIVIL & STRUCTURAL ENGINEERING & AIRPORT & AVIATION CONSULTING ® TRANSPORTATION DESIGN & PLANNING
Mr. Tracy Stage, A.A.E.
June 12, 2013
Page 2 of 2
A review of the bid proposals indicated a potential discrepancy between the written unit price and the extended
bid price (in numerals) associated with Item No. 425-2, Type F DBI, of Schedule A for the bid submitted by
Birkshire Johnstone. The written about is “three thousand five hundred seventy thousand” and the numerical
value shown under the Unit Price column is “$3,570.00.” This appears to be a typographical error and the
intended written amount was “three-thousand, five-hundred seventy.” Item No. 430-1, 18” RCP, Class III, of
Schedule A submitted by Birkshire Johnstone also included a potential discrepancy. The written amount is
“thirty two” and the numerical value shown under the Unit Price column is “$32.48.” As stated in Section
17.1 Instruction to Contractors of the bidding documents, discrepancies between words and figures will be
resolved in favor of the words; therefore, the unit price included in the bid tabulation for Item No. 430-1
includes the unit price written in words ($32.00). The unit price included in the bid tabulation for Item No.
425-2 includes the numerical value written in the Unit Price column due to the obvious typographical error.
Several of the remaining contractor’s bids included minor discrepancies which appear to have no direct bearing
on our recommendation of award provided herein, but may require County legal review in the event that the
project is ultimately awarded to a firm other than Birkshire Johnstone who provided the apparent low bid.
The Disadvantaged Business Enterprise Program form (OC-10) submitted by Birkshire Johnstone includes
subcontractors for electrical, mechanical, and painting but does not include estimated amounts for each
subcontractor or a total estimated DBE participation percentage. We reviewed the DBE requirements of the
bidding documents with Birkshire Johnstone and they confirmed that the 4.03% DBE participation
requirement is reasonable and will be achieved for this project.
Notwithstanding the County’s final review of the complete project documents and legal review of bid forms,
we recommend award of Schedule A for the West Hangar Area Public Parking and ECA Terminal
Development contract to Birkshire Johnstone, LLC at the bid amount of $550,269.93, subject to available
funding and concurrence by FDOT.
We stand ready to assist the Airport in the implementation of this project based on your determination of the
desirability of the award at this time. Should you have any questions or require additional information, please
do not hesitate to contact us at your convenience.
Sincerely,
AVCON, INC.
John Collins, P.E.
Project Manager
Enclosures as list below:
1. Attachment A—Bid Tabulation
BIO TABULATION
‘West Hangar Area Public Parking and EAC Terminal Development
Bob Sikes
Aicpor, yw, Floris
BID OPENING: May 30, 2013 AT 3:00 PML
ATTACHMENT "A"
MBIA CO. INC.
ITEM DESCRIPTION
ENGINEERS ESTIMATE te wwe.
EXTENDED =z EXTENDED TxTEROED EXTENDED
Jovetfounenry] usr once | Protas ror. fom | erence | Porat Tora
SRPERICES
Tololatatatotctotet
Sena _
7 xa
FRE 7
A Oe TROT” iz EATERENT OF EROSION NO WATER POULUTIN +
aes
TH
in mE
CE ane REMOVAL AAD PERLATTNG 5
SECURE ENC UATON DAD EISASERT iH
Zi
ne
;
n
;
t
Cae
75
a
“
35
3
ame
CONCRETE BUMPS TEN PAD-ENCLOSURE KIO APRON :
:
:
[VEHICULAR PAVEMENT MARKINGS. WHITE. 7000 _|
=
Ema
Se ERC 0G CENTER EARNS :
:
ae Ts 513,156.00
SST Soe nSTearE WAR UNG RETUGNG AL VALVES TEES MO FITINGE at ee
ier Sencar aE
Se a a a ce (ATERRE WITT STOS UEC WATER METER MOREE me
See [P omnect euRmeD Beers aH
Se OP AMAT SILO WTOP =
oie [eo SaMARY Sone a
Sias3 [eo SANT SEVER me
SEspa — SUTaaY SonER EARLE aE
Fe Oe ae esata NCE WADI. TT ERSED WARE ATTAIN a
FE Re RRIGUATE GATE WIRED ates
Tee area Stor at
Fe REA Den COMPLETE Tas
Set — at? PER LOWRIE
RT SRLS OS AONE
oa RCE
7
:
ma
1s
mH
ise g
3201S
To
oT
7
3
oH
ats
100
"
3-1
;
B
Ty
eS ET Wooo |S sssess |S Soares 7] $535 00000]
Semone ieee aan
Teisess amen § 438458 $ tsnzess § nse steerer
$ 2,152,95105