READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — March 18, 2013 — reading text
Part 39 of 39. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — 01-Agenda Packet.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
funding from grants, as well as enhanced
revenue resulting from consolidations of water and wastewater services in
partnership with local utility and military entities.
OPERATIONAL PHILOSOPHY
We believe in being helpful, reliable, open, honest, accessible, responsive,
and well informed. We are problem solvers who believe in teamwork and
personal commitment and who pay particular attention to cost
effectiveness and fiscal responsibility. We have respect and appreciation
for the public and are dedicated to providing the highest quality services
possible for all who live in and visit our community.
82
Packet Pg. 369
8.1.b
GOALS, OBJECTIVES & STRATEGIES
Goal 1 Increase the availability and sustainability of additional drinking
water supplies through future water resource planning
Objective To continue planning activities for the future water supply
Attachment: 2013-2014 Strategic Plan (1428 : Approval of FY 2014 Strategic Plan and Commissioner Priorities)
program
Action/Strategies
a) Continue to implement planning efforts in utilizing direct
withdrawal from the Shoal River with offline reservoir to provide
for combined use with existing groundwater supply
b) Focus planning efforts on the land acquisition portion of the
program, working with NWFWMD, to obtain land for the future
reservoir, water treatment plant, associated infrastructure and
wetland mitigation
c) Evaluate water quality in the Shoal River and treatment
alternatives
d) Work closely with the NWFWMD, ACOE, and Eglin AFB in
planning and to obtain any available funding
Goal 2 Increase the efficiency and coordination between payment
postings and update of the cut off list enhancing effectiveness in
Customer Service and streamlining the process for an improved
customer experience
Objective To increase level of communication between field and office
to eliminate unnecessary cut offs
Action/Strategies
a) Implement a real time link between Customer Service and
meter reading technicians via handheld device or laptop
83
Packet Pg. 370
8.1.b
Goal 3 Maintain and improve the key components of the OCWS
infrastructure to ensure reliable, consistent and efficient service
Objective To increase the performance of key water and sewer system
components
Action/Strategies
a) Replacement Main Okaloosa Island Lift Station in Fiscal
Year (FY) 2013
b) Ft. Walton Beach 36” Force Main in FY2013
Attachment: 2013-2014 Strategic Plan (1428 : Approval of FY 2014 Strategic Plan and Commissioner Priorities)
c) New Del Cerro II Well in FY2013
d) Replacement Meigs-Seminole Lift Station and other associated
force mains in FY2014
e) Newcastle Area Water Main Improvement Project – funded by
Community Development Block Grant in FY2013-FY2014
f) Water & Sewer System Rehab projects – water main
replacement/upsizing, gravity sewer main lining, and manhole
lining – work progressing every fiscal year
g) Bob Sikes Industrial Park elevated water tank in FY2016-FY2017
Goal 4 Increase awareness of conservation strategies and reduce
energy costs throughout the department
Objective To increase communication of OCWS intent to improve
sustainability
Action/Strategies
a) To educate and inform our customers on the many ways to do
business with us and the advantage of e-bills as a green way to
reduce operating costs and environmental waste
b) Investigate going to a 10-hour -day work week by fully shutting
down operations for one day each week
c) Install timers on high horsepower motors where appropriate to
assist in energy conservation
84
Packet Pg. 371
8.1.b
Goal 5 Develop and grow system by expanding the search for
relationships that will result in the consolidation of potable water supply
as well as wastewater treatment and disposal services, resulting in
increased operational efficiencies and increased revenue to reduce
future rate increases
Objective To increase consolidation of services where possible –
including partnering with the military as customers providing increased
revenue and environmental conservation
Action/Strategies
Attachment: 2013-2014 Strategic Plan (1428 : Approval of FY 2014 Strategic Plan and Commissioner Priorities)
a) Implement the consolidation of Eglin’s Wastewater Treatment
plants; specifically Duke Field, Camp Rudder, and two Eglin
sewer plants – includes construction and tie in to OCWS system
resulting in additional revenue streams
b) Be proactive in seeking out Eglin AFB’s Utility Privatization
c)Diversion of the County’s wastewater flow from the NVOC
plant to OCWS’ Arbennie Pritchett Water Reclamation
d) Assist Eglin AFB with any water and sewer projects that arise,
such as the Navy EOD Site and the Taxiway H Water Main
Extension.
Goal 6 Maintain bad debt write offs at a level of less than 1% of total
annual billings to minimize losses and reduce future rate increases
Objective To decrease the dollar amount of bad debt write offs
Action/Strategies
a) Place a high priority on internal collection efforts
b) Continue to monitor and utilize outside collection efforts
Goal 7 Maximize cost savings by increasing the utilization of in-house
resources improving flexibility and timely completion of internal projects
as well as providing the ability to attract new clients to our customer
base
Objective To increase relationships with existing military installations
Action/Strategies
a) Support Eglin Air Force Base on any projects related to BRAC,
including housing privatization and utility privatization and
encourage them to utilize our services wherever needed
b) A large majority of projects are performed by in-house
construction crews
c) Continue to seek out federal and state grants that can be used
for these type of projects
85
Packet Pg. 372
