READ ALONGSIDE THE SOURCE

Fort Walton Beach Council minutes — 08-22-06 regular minutes — reading text

Part 6 of 11. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — fwb-10875-original.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

indicated. 6) A detail sheet showing typical water and sewer line installation shall be included with the plans. Permitting: 1) It is the Developer' s responsibility to determine whether FDOT or FDEP permits are required for this development. If any permits are required, the permit applications and any subsequent correspondence shall be forwarded to the City prior to of the approval building penn it. Connection and Impact Fees: 1) Water and sewer impact fees shall apply to the development. Upon calculation of the number of ERUs, the impact fees shall be determined. Water is $ 700 per ERC and sewer is $ 807 per ERC. 2) Estimated water and sewer connection fees shall be determined upon submittal of the revised Utility Site Plan. Miscellaneous: 1) The development must meet FDEP environmental regulations and FDOT standards for sediment and soil erosion control. Sediment and erosion control measures shall be shown on the Demolition Plan. The proposed sediment and erosion control measures shall be installed prior to I commencement of any demolition of construction of the proposed existing building(s) or development. 2) Inflow protectors shall be installed in any new sanitary sewer manhole. 3) See the list of standard notes to be added to the final plans. The plans shall not be approved until all required standard notes are included on the plans. CDS Department - Inspection Division comments: 1) Three sets of plans and five site/civils shall be submitted. 2) Indicate name of threshold inspector. 3) Provide occupancy load on title page and note on plans that the posted for final inspection. occupant load shall be 4) Include on electrical plans all bonding of any metal portion of water lines, gas lines and etc., building including framing, which is applicable. I 15 Regular Council 8- 22-06 SITE PLAN APPROVAL - FIRST BAPTIST CHURCH cont. 5) A final letter of approval for the construction shall be submitted to this office by both the engineer and architect of design which means that all the hurricane connectors shall also be inspected by said engineer. 6) Signage for building, if any, shall be pennitted separately. 7) Note on plans that an as built survey shall be provided after slab inspection. 8) A geotechnical soil analysis shall be provided. 9) A compaction test shall be provided when done. 10) Any water heaters shall be insulated within 8' from unit - note on 11) Show physical plans. securing of mechanical units. 12) Provide insulation R-valves. 13) Show on plans devices which limit flow of water in accordance with Section 13-412 FBC. 14) Show on plans cleanouts on all vertical dwv plumbing. 15) Show water hammer arrestors. 16) Show automatic lighting shutoff as per Section 13-41. 1ABC. 1. 1. 17) Smoke detectors shall be in compliance with Section 606 and 607. 4 and 607. 8 ofFMC. 18) Show Duct detectors and access. 19) Provide product and NOC. approvals 20) Incidental use areas shall be fire separated in accordance with Table 302. 1.1. 21) Provide truncated dome transition strips, if applicable, at entrances/ sidewalk areas. 22) Provide water fountains. 23) And last, but not least, my question always is, why do you not include provisions for an elevator for future upstairs usage by everyone. CDS Department comments: 1) Please include number of parking spaces in Church parking lot (not on- street spaces) and verify that these meet the requirements of 1 parking space per 4 seats in the church. 2) Impervious surface coverage: the CF Future Land Use category allows a maximum 650/ 0 impervious surface coverage. In the site data table, you indicate the total site area for the entire church site, but do not show the calculation of impervious surface coverage for the entire site. The ISC must be based on the entire site unless the area of new construction is intended to be subdivided into a separate parcel. Please show the ISC square footage and percentage in the site data table. 3) Parking: a. In the site data table, please include the required parking for the church (1 space per 4 seats in chapel) and verify that the number of spaces provided meets this requirements ( do not include on-street parking spaces in this calculation). b. Please revise site plan to indicate that you will re- stripe two on- street spaces to accommodate handicapped parking at the Harbeson Avenue entrance to the new building. c.Please revise site plan to reconfigure curbing at the corner of Harbeson Avenue and First Street to allow for a landscaped area. Also, revise site plan to reconfigure the area in front of the First Street entrance to the r- building show a curbed, landscaped to area within the right-of- way. Since these projects are improving the right-of-way, the City can offer a 500/0 matching streetscape grant up to $ 10, 000 for this work. 4) The proposed building is less than 10' away from an adjacent building. The new building needs to be moved 2' approximately closer to First Street to address this issue. 5) Please add an awning/ porch cover to the Harbeson Avenue entrance like the one on the west elevation. Utilities Department - Environmental comments: 1) City request copies of all necessary permits ( Stormwater Management, etc.) from the FDEP be submitted to Environmental Specialist 2) According the FWB Land Development Code, side slopes should be no greater than 4: 1. On sheet C- 3 side slopes are shown at 3: 1, therefore requiring modification. 3) Engineer needs to place silt fence on sheet C- 3 and modify legend accordingly. 4) Engineer needs section views of 18" diameter perforated pipeto be shown on plans. 16 Regular Council 8- 22-06 SITE PLAN APPROVAL - FIRST BAPTIST CHURCH cont. 5) Engineer needs invert elevations of all catch basins along with details/ section views to be shown on plans. 6) Engineer needs to add std. erosion control notes provided by on to the plans. Utility Operations Manager 7) Engineer needs detail of " Pop Off" located inside retention pond be shown on plans.

Download this text file with its original spacing ↓