6) A detail sheet
showing typical water and sewer line installation shall be included with the
plans.
Permitting:
1) It is the Developer' s
responsibility to
determine whether FDOT or FDEP
permits are
required for this development. If any permits are required, the
permit applications and any
subsequent correspondence shall be forwarded to the
City prior to of the
approval
building penn it.
Connection and Impact Fees:
1) Water and sewer
impact fees shall apply to the development. Upon calculation of the
number of ERUs, the impact fees shall be
determined.
Water is $ 700 per ERC and sewer is $ 807
per ERC.
2) Estimated water and sewer connection fees shall
be determined upon submittal of the
revised Utility Site Plan.
Miscellaneous:
1) The development must meet FDEP
environmental regulations and FDOT standards for
sediment and soil erosion control. Sediment
and erosion control measures shall be
shown on the Demolition Plan. The
proposed sediment and erosion control measures
shall be installed prior to
I
commencement of any demolition of
construction of the proposed existing building(s) or
development.
2) Inflow protectors shall be
installed in any new sanitary sewer manhole.
3) See the list of standard notes
to be added to the final
plans. The plans shall not be
approved until all required standard notes are included on
the plans.
CDS Department - Inspection
Division comments:
1) Three sets of
plans and five site/civils shall be submitted.
2) Indicate name of threshold
inspector.
3) Provide
occupancy load on title page and note on plans that the
posted for final inspection. occupant load shall be
4) Include on electrical
plans all bonding of any metal portion of
water lines, gas lines and etc., building including framing,
which is applicable.
I
15
Regular Council 8- 22-06
SITE PLAN APPROVAL - FIRST BAPTIST
CHURCH cont.
5) A final letter of approval for the construction
shall be submitted to this office
by both the
engineer and architect of design which means that all the hurricane connectors
shall also
be inspected by said
engineer.
6) Signage for
building, if any, shall be pennitted separately.
7) Note on plans that an as built
survey shall be provided after slab inspection.
8) A geotechnical soil
analysis shall be provided.
9) A compaction test shall be
provided when done.
10) Any water heaters shall be insulated
within 8' from unit - note on
11) Show physical
plans.
securing of mechanical units.
12) Provide insulation R-valves.
13) Show on plans devices which limit flow of
water in accordance with Section 13-412 FBC.
14) Show on plans cleanouts on all vertical
dwv plumbing.
15) Show water hammer arrestors.
16) Show automatic
lighting shutoff as per Section 13-41. 1ABC. 1. 1.
17) Smoke detectors shall be in
compliance with Section 606 and 607. 4 and 607. 8 ofFMC.
18) Show Duct detectors and access.
19) Provide product and NOC.
approvals
20) Incidental use areas shall be fire
separated in accordance with Table 302. 1.1.
21) Provide truncated dome transition
strips, if applicable, at entrances/ sidewalk areas.
22) Provide water fountains.
23) And last, but not least,
my question always is, why do you not include provisions for an
elevator for future upstairs
usage by everyone.
CDS Department comments:
1) Please include number of
parking spaces in Church parking lot (not on- street spaces) and
verify that these meet the requirements of 1 parking space per 4 seats in the church.
2) Impervious surface coverage: the CF Future Land Use category allows a maximum 650/ 0
impervious surface coverage. In the site data table, you indicate the total site area for the
entire church site, but do not show the calculation of
impervious surface coverage for the
entire site. The ISC must be based on the entire site unless
the area of new construction
is intended to be subdivided into a
separate parcel. Please show the ISC square footage
and percentage in the site data table.
3) Parking:
a. In the site data table, please include the
required parking for the church (1 space per 4
seats in chapel) and verify that the
number of spaces provided meets this
requirements ( do not include on-street
parking spaces in this calculation).
b. Please revise site plan to indicate that
you will re- stripe two on- street spaces to
accommodate handicapped parking at the Harbeson Avenue entrance
to the new
building.
c.Please revise site plan to reconfigure
curbing at the corner of Harbeson Avenue and
First Street to allow for a landscaped area. Also, revise site
plan to reconfigure the
area in front of the First Street entrance to the
r-
building show a curbed, landscaped
to
area within the right-of-
way. Since these projects are improving the right-of-way, the
City can offer a 500/0 matching streetscape grant up to $ 10, 000 for this work.
4) The proposed building is less than 10'
away from an adjacent building. The new building
needs to be moved 2'
approximately closer to First Street to address this issue.
5) Please add an awning/ porch cover to the Harbeson Avenue
entrance like the one on the
west elevation.
Utilities Department - Environmental comments:
1) City request copies of all
necessary permits ( Stormwater Management, etc.) from the
FDEP be submitted to Environmental
Specialist
2) According the FWB Land
Development Code, side slopes should be no greater than 4: 1.
On sheet C- 3 side slopes are shown at 3: 1, therefore
requiring modification.
3) Engineer needs to place silt fence on sheet C- 3 and
modify legend accordingly.
4) Engineer needs section views of 18" diameter
perforated pipeto be shown on plans.
16
Regular Council 8- 22-06
SITE PLAN APPROVAL - FIRST BAPTIST
CHURCH cont.
5) Engineer needs invert elevations of all catch basins along with details/ section views
to be
shown on plans.
6) Engineer needs to add std. erosion
control notes provided by
on to the plans.
Utility Operations Manager
7) Engineer needs detail of "
Pop Off" located inside retention pond be shown on plans.