development.
2) See list of standard notes to be
added to the final plans. The
until all pertinent standard notes are plans shall not be approved
included on the plans.
2. Prior to Certificate of
Occupancy:
a. All
public sidewalks/ crosswalks shall be constructed and
striped as per City II. ,
specifications as applicable, including
b. All required
consisency with ADA requirements.
City and State easements and permits ( i. e., stormwater,
driveway, etc.) shall be executed and approved by the utility, sidewalk,
Mr. Patterson seconded appropriate agency.
motion and it carried
Tucker, Pullen, Hartwell, and Minich in unanimously with Holmes, Patterson, Campbell,
favor.
13
Regular Council 8- 22- 06
SITE PLAN APPROVAL - FIRST BAPTIST
CHURCH OF FWB CHRISTIAN LIFE CENTER
Consideration of a request by property owner First
Baptist Church of Fort Walton Beach, for Site Plan
approval for First Baptist Church of Fort Walton Beach Christian Life Center
located at 21 First Street
SE, consisting of the construction of 15, 776 sf
building to be used as a multi- purpose gymnasium, stage,
storage, weight room, game room, and offices associated with the church.
The City Attorney gave the oath to all individuals
I"""" who expected to testify on the matter.
Ski Royster, Royster Construction,
representing the applicant, confirmed there was no objection to the
staff report.
Peggy Fowler, CDS Planner II, submitted the staf report for the record.
The Mayor opened the floor for
public input. There being none, the public hearing was closed.
Mr. Campbell moved to
approve the site plan for First Baptist Church of FWB Christian Life
Center, located at 21 First Street SE,
subject to the following conditions:
Note: Recommendation is based
upon the application submitted by the applicant, site
drawings developed by Devon Pelham ( project 05832, dated 5/ 10/ 06, revised 7/ 14/ 06), plan and
architectural drawings developed
by Allen R. McGinnis and included in the site plan package
under the project number 05832 ( Devon Pelham)
dated 5/ 10/ 06.
1. Prior to issuance of a
building penn it:
a. A survey shall be submitted of the construction
area identifying
on the site.
existing protected trees
b. A landscape plan
prepared by a professional landscape architect or nurseryman must be
submitted and approved by CDS staff. The
plan must comply with all applicable
regulations in Section 12. 71 of the LDC, including appropriate
mitigation for removing
existing protected trees. Design for an irrigation system with a well must be
c. The proposed " passenger
provided.
loading/ unloading" area on First Street SE must be designed to
meet the approval of the Public Works
Department.
d. The plans must address all
applicable items submitted by Public Works/ Engineering,
Utilities, CDS, and Building
Inspections departmehts/ divisions in memorandums
distributed at the June 29, 2006 DRC
meeting, ( as follows):
Public Works Department - Enaineerina Division
comments:
1) The official address for the
development being determined.
is
2) According to Section 20. 755 of the
City' s Land Development Code, 5 foot wide sidewalk is
required along the right-of-way of First Street. The sidewalk can be installed in an
existing 10 foot easement behind the on- street parking.
3) A Letter of Credit to the
City of Fort Walton Beach will be required for the installation of
the proposed sidewalk. The Letter of Credit will be
released after completion of sidewalk
is approved by the Public Works
Department.
4) Handicap ramps for sidewalks shall be
constructed at raised curbs,
according to the
t""'" latest Florida Accessibility Code.
5) Existing parking spaces
may be marked out for the pedestrian entrance from First Street
as shown on the plan, but
remaining spaces are not to be altered unless a detailed
striping plan is submitted.
6) Please identify the vertical datum used for elevations
provided, such as, NGVD '29.
Utilities Department comments:
Concurrency:
1) Concurrency forms were submitted for this
development. The number of Equivalent
Residential Units ( ERUs) shall be calculated on
Page 2 of the concurrency forms. Once
the ERUs are calculated, Page 2 should be resubmitted.
14
Regular Council 8- 22- 06
SITE PLAN APPROVAL - FIRST BAPTIST
CHURCH cont.
Water & Sewer:
1) The Utility Site Plan does not show
any water lines or water service connections.
Attached with this memo are reference
maps of the existing City water system in the area
of the new development. Please add
these water lines to the plans and indicate
any
existing or proposed service connections for the development on the Site Plan.
a. The Utility
Developer shall be responsible for the installation of all onsite water service lines.
b. The City shall be
responsible for making any required water taps,
installing water
service lines up to the right-of- way or easement lines, and
installing any required
I,. ,. '. . :. .
water meters. 1
ii,
c. The Contractor shall
notify the Utilities Operations Manager at (850) 833- 9613 prior to
construction of water mains.
2) For the proposed water service line(
s), please indicate the
of the proposed
pipe material(s) and length( s)
piping on the Utility Site Plan.
3) Backflow preventers are
required for all water service connections. Please show the
location and type of any
existing or proposed backflow preventers on the Utility Site Plan.
Backflow preventers shall be located on
private property. Water meters shall be installed
within a righto- f- way or easement and shall be located in a
4) There is a 6" PVC sewer main grassed area.
available to the west of the proposed
all existing or proposed sewer laterals building. Please show
on the Utility Site Plan.
a. The
Developer shall be responsible for all sewer installation and the
connection( s) to existing sewer mains or manholes. required
b. The Contractor shall
notify the Utilities Operations Manager at (850) 833- 9613 prior to
connecting to the existing sewer system.
5) For the proposed sewer lateral( s),
please indicate the pipe material( s), invert elevations,
and slopes. The location of all cleanouts
shall also be