please show one-
way arrows on the drives.
2) The fa~ ade
facing Florida Blanca Place has the appearance of the " back" of the
Please add some features that will make this look less building.
like the rear of the
building and
give it some sort of "pedestrian" face as seen from Florida Blanca Place.
3) Parking:
a. In the site data table, please indicate that the required parking is 10 spaces ( 1
space/ 400 s.f.).
Utilities Deoartment comments:
Cover sheet:
1) Please add an approval block for the Utilities
Department on the Cover Sheet.
2) Please add the contact information for
Okaloosa County Water and Sewer to the
Utility
Companies list on the Cover Sheet.
Utility Plan:
1) The Utility Plan shows a
proposed 2" water service connection to an existing 6" water
main within the western
right-of-way of Florida Blanca Place.
a. The City shall be responsible for
making the 2" water tap, installing the 2" water
service line to the right-of-way, and
installing the 2" water meter and meter box. The
water meter shall be installed within the
right-of-way or easement.
b. The Developer shall be
responsible for installing the backflow preventer on private
property and the water service line from the right-of-way to the building.
c. An
existing 16" water main owned and maintained by Okaloosa County Water and
Sewer should be located and shown on the
plans. The 16" water main lies within the
eastern right-of-way of Florida Blanca Place. Prior to construction,
OCWS should be
contacted at ( 850) 651- 7176. A note shall be
placed on the Utility Plan to warn the
Contractor of the 16" water main.
d. There are two existing backflow
preventers shown on the plans. During construction,
all possible measures should be taken to avoid
damaging the backflow preventers.
e. Water Meters are to be accessible to the
meter readers and shall be installed in a
grassed area, not a parking space or driveway.
f. The Contractor shall coordinate all water main installation with
the Utilities Operations
Manager at (850) 833- 9613.
2) The Utility Plan shows a proposed 4"
sanitary sewer lateral connecting to an existing 8"
terra cotta sewer main lying along the centerline of Florida Blanca
Place. The 8" sewer
main was lined in place in
January 1993. However, there are three available stub-outs that
could be utilized to provide the required sewer service: the first stub- out
lies 23' north of
MH # 124 ( TBM # 2); the second stub- out lies 61' north of MH # 124; and
the third stub- out
lies 122' north of MH # 124. Please
verify the location of these stu b- outs and show them
on the Utility Plan.
a. The Developer shall be responsible for
installing all onsite sewer piping and making
the required connection to the
existing sewer system.
b. An existing 16" sanitary sewer force main owned and maintained Okaloosa
by County
Water and Sewer should be located and shown on the
plans. The 16" sewer force
main lies within the western right-of- of Florida Blanca Place. Prior to
way
construction, OCWS should be contacted at (850) 651- 7176. A note shall be
placed on
the Utility Plan to warn the Contractor of the 16" force main.
12
Regular Council 8- 22-06
SITE PLAN APPROVAL- HOLLIS REALTV
OFFICE BUILDING cont
c. A
sanitary sewer cleanout shall be installed near the building in addition to one at the
righto- f- way line.
d. The Contractor shall coordinate the
sewer installation with the Utilities
Operations
Manager at (850) 833- 9613.
3) For the proposed water service line,
please indicate the pipe material and length of the
proposed piping on the Utility Plan.
4) For the proposed sewer lateral,
Iil,. ", 1".
J,.
please indicate the pipe material, length, and slope.
5) A backflow preventer is
required on all water service lines and shall be installed on
private
property. The locations of the backflow preventer shall be shown on the
Connection and Impact fees: Utility Plan.
1) Water and sewer
impact fees shall apply to all units of the development. 1, 000 te Office
Building = 0. 35 ERCs.
Based on the square footage of the
development, the estimated total number of ERCs for
this development is 1. 37.
Water is $ 700 per ERC and sewer is $ 807
per ERC.
The estimated water impact fees are $ 959,
and the estimated sewer
1, 105. 59. impact fees are
2) Based on the required water and sewer
connections, the estimated water and sewer
connection fees are as follows:
2" water tap and meter = $1, 000; 4"
sanitary sewer = $600
These fees do not include other incidentals that may be required to connect to the
any
existing water and sanitary sewer systems.
Grading and Drainage Plan:
1) On the first
page of the Stormwater Management Plan, the parcel is
Section 24, not Section 14. actually located in
2) In the Drainage
Facility Design section, the total storage capacity is listed as 2, 137 cubic
feet. However, when
discussing the FDEP and City of Fort Walton Beach storage
requirements, the capacity is listed as 2, 583 cubic feet. Please
calculations and resubmit the Stormwater verify the drainage
3) The percolation test was
Management Plan.
performed at the location of the proposed
percolation test should be performed at the location of the building. A new
However, if the Soil Survey data for Mandarin soil
proposed retention pond.
is used for
minutes per inch to 10 minutes permeability design rates (3
per inch), the worst case scenario of 10 minutes
should be used in the per inch
design.
Miscellaneous:
1) The development must meet FDEP
environmental regulations and FDOT standards for
sediment and soil erosion control. Sediment
and erosion control measures shall be
shown on the Demolition Plan. The
proposed sediment and erosion control measures
shall be installed prior to
commencement of any demolition of
construction of the proposed existing building(s) or