READ ALONGSIDE THE SOURCE

Fort Walton Beach Council minutes — 08-22-06 regular minutes — reading text

Part 4 of 11. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — fwb-10875-original.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

please show one- way arrows on the drives. 2) The fa~ ade facing Florida Blanca Place has the appearance of the " back" of the Please add some features that will make this look less building. like the rear of the building and give it some sort of "pedestrian" face as seen from Florida Blanca Place. 3) Parking: a. In the site data table, please indicate that the required parking is 10 spaces ( 1 space/ 400 s.f.). Utilities Deoartment comments: Cover sheet: 1) Please add an approval block for the Utilities Department on the Cover Sheet. 2) Please add the contact information for Okaloosa County Water and Sewer to the Utility Companies list on the Cover Sheet. Utility Plan: 1) The Utility Plan shows a proposed 2" water service connection to an existing 6" water main within the western right-of-way of Florida Blanca Place. a. The City shall be responsible for making the 2" water tap, installing the 2" water service line to the right-of-way, and installing the 2" water meter and meter box. The water meter shall be installed within the right-of-way or easement. b. The Developer shall be responsible for installing the backflow preventer on private property and the water service line from the right-of-way to the building. c. An existing 16" water main owned and maintained by Okaloosa County Water and Sewer should be located and shown on the plans. The 16" water main lies within the eastern right-of-way of Florida Blanca Place. Prior to construction, OCWS should be contacted at ( 850) 651- 7176. A note shall be placed on the Utility Plan to warn the Contractor of the 16" water main. d. There are two existing backflow preventers shown on the plans. During construction, all possible measures should be taken to avoid damaging the backflow preventers. e. Water Meters are to be accessible to the meter readers and shall be installed in a grassed area, not a parking space or driveway. f. The Contractor shall coordinate all water main installation with the Utilities Operations Manager at (850) 833- 9613. 2) The Utility Plan shows a proposed 4" sanitary sewer lateral connecting to an existing 8" terra cotta sewer main lying along the centerline of Florida Blanca Place. The 8" sewer main was lined in place in January 1993. However, there are three available stub-outs that could be utilized to provide the required sewer service: the first stub- out lies 23' north of MH # 124 ( TBM # 2); the second stub- out lies 61' north of MH # 124; and the third stub- out lies 122' north of MH # 124. Please verify the location of these stu b- outs and show them on the Utility Plan. a. The Developer shall be responsible for installing all onsite sewer piping and making the required connection to the existing sewer system. b. An existing 16" sanitary sewer force main owned and maintained Okaloosa by County Water and Sewer should be located and shown on the plans. The 16" sewer force main lies within the western right-of- of Florida Blanca Place. Prior to way construction, OCWS should be contacted at (850) 651- 7176. A note shall be placed on the Utility Plan to warn the Contractor of the 16" force main. 12 Regular Council 8- 22-06 SITE PLAN APPROVAL- HOLLIS REALTV OFFICE BUILDING cont c. A sanitary sewer cleanout shall be installed near the building in addition to one at the righto- f- way line. d. The Contractor shall coordinate the sewer installation with the Utilities Operations Manager at (850) 833- 9613. 3) For the proposed water service line, please indicate the pipe material and length of the proposed piping on the Utility Plan. 4) For the proposed sewer lateral, Iil,. ", 1". J,. please indicate the pipe material, length, and slope. 5) A backflow preventer is required on all water service lines and shall be installed on private property. The locations of the backflow preventer shall be shown on the Connection and Impact fees: Utility Plan. 1) Water and sewer impact fees shall apply to all units of the development. 1, 000 te Office Building = 0. 35 ERCs. Based on the square footage of the development, the estimated total number of ERCs for this development is 1. 37. Water is $ 700 per ERC and sewer is $ 807 per ERC. The estimated water impact fees are $ 959, and the estimated sewer 1, 105. 59. impact fees are 2) Based on the required water and sewer connections, the estimated water and sewer connection fees are as follows: 2" water tap and meter = $1, 000; 4" sanitary sewer = $600 These fees do not include other incidentals that may be required to connect to the any existing water and sanitary sewer systems. Grading and Drainage Plan: 1) On the first page of the Stormwater Management Plan, the parcel is Section 24, not Section 14. actually located in 2) In the Drainage Facility Design section, the total storage capacity is listed as 2, 137 cubic feet. However, when discussing the FDEP and City of Fort Walton Beach storage requirements, the capacity is listed as 2, 583 cubic feet. Please calculations and resubmit the Stormwater verify the drainage 3) The percolation test was Management Plan. performed at the location of the proposed percolation test should be performed at the location of the building. A new However, if the Soil Survey data for Mandarin soil proposed retention pond. is used for minutes per inch to 10 minutes permeability design rates (3 per inch), the worst case scenario of 10 minutes should be used in the per inch design. Miscellaneous: 1) The development must meet FDEP environmental regulations and FDOT standards for sediment and soil erosion control. Sediment and erosion control measures shall be shown on the Demolition Plan. The proposed sediment and erosion control measures shall be installed prior to commencement of any demolition of construction of the proposed existing building(s) or

Download this text file with its original spacing ↓