READ ALONGSIDE THE SOURCE
Fort Walton Beach Council minutes — 08-22-06 regular minutes — reading text
Part 3 of 11. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-10875-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
laterals, please indicate the
and slope(s).
pipe size( s), materials(s), lengths( s),
4) Backflow preventers are
required on all water service lines and shall be installed on
private property. The locations of the backflow
preventers shall be shown on the Utility
Plan.
Connection and Impact fees:
1) Water and sewer impact fees shall
apply to all units of the development. 1, 000 te Office
Building = 0. 35 ERCs.
Based on the square
footage of the development, the estimated total number of ERCs for
this development is 1. 60. A credit
may be applied based on prior water
the existing business located onsite. consumption from
Water is $ 700 per ERC and sewer is $ 807
per ERC.
The estimated water
impactfees without an applied credit are $ 1, 120, and the estimated
sewer impact fees are $ 1, 291. 20.
2) Estimated water and sewer connection fees will be
calculated once the locations and
sizes are indicated on the
Utility
Plan.
Miscellaneous comments:
1) The development must meet FDEP
environmental regulations and FDOT standards for
sediment and soil erosion control. Sediment and
erosion control measures shall be
shown on the Demolition Plan. The
proposed sediment and erosion control measures
shall be installed prior to
commencement of any demolition of
construction of the proposed existing building(s) or
development.
2) See list of standard notes to be
added to the final plans. The
until all pertinent standard notes are
plans shall not be approved
included on the plans.
2. Prior to Certificate of
Occupancy:
a. All
public sidewalks/ crosswalks shall be constructed and
striped as per City
specifications as applicable, including consis~ with ADA
ncy requirements.
b. All required City and State
easements and permits ( i. e., stormwater,
utility, sidewalk,
driveway, etc.) shall be executed and approved by the appropriate
Mr. Hartwell seconded motion and it carried agency.
unanimously with Holmes, Patterson, Campbell,
Tucker, Pullen, Hartwell, and Minich in favor.
SITE PLAN APPROVAL - HOLLIS REAL TV OFFICE
BUILDING
Consideration of a request by property owner Alicia J. Hollis
Trust, for Site Plan approval to
Hollis Realty Office Building to be located on an out- develop the
parcel of the Paradise Pointe
253 Miracle Strip Parkway SE, Shopping Center at
consisting of a 3, 900 square- foot building which will be used for realty
offices.
The City Attorney gave the oath to all individuals who
expected to testify on the matter, and noted for the
record that Ms. Fowler was
previously given the oath.
Kate Nixon, Choctaw
Engineering, agent for applicant, confirmed there was no objection to the staff
report.
Peggy Fowler, CDS Planner II, submitted the staff report for the record.
The Mayor opened the floor for
public input. There being none, the public hearing was closed.
10
Regular Council 8- 22- 06
SITE PLAN APPROVAL - HOLLIS REALTV OFFICE BUILDING cont
Mr. Minich moved to approve the site for Hollis
plan Office Realty Building, to be located at 253
Miracle Strip Parkway SE, Publix
Shopping Center, subject to the following conditions:
Note: Recommendation is based upon the
application submitted by the applicant, site plan
drawings developed by Choctaw Engineering, Inc. ( project # 2005-233, dated 6/ 7/ 06, revised
7/ 13/ 06), and architectural
drawings developed by Kendrick David Dowling Architects, Inc.
project #0601, dated 5/ 25/ 06).
1. Prior to issuance of a
J
building pennit:
a. A landscape
plan prepared by a professional landscape architect or nurseryman must be
submitted and approved by CDS staff. The plan must
comply with all applicable
regulations in Section 12. 71 of the LDC. Design for an irrigation system with a well must
be provided.
b. The plans must address all applicable items submitted
by Public Works/ Engineering,
Utilities, CDS, and Building Inspections departments/ divisions in memorandums
distributed at the July 11, 2006 DRC meeting, (as follows):
CDS DeDartment - InsDection Division comments:
1) Three sets of construction plans and five site/ civils shall be submitted.
2) A switched disconnect shall be provided for the what heater.
3) A hi - 10 water fountain shall be
provided.
4) An as built survey shall be provided after slab
inspection.
5) Provide geotechnical analysis and
compaction tests results.
6) Indicate flood zone.
7) Indicate backflow preventor.
8) Show electrical bonding of all metal
piping and etc.
9) Show smoke detectors ( if applicable with code
requirements).
10) Recommend emergency lighting in restrooms.
11) Indicate termite treatment.
12) Show water hammer arrestors.
13) Show physical attachment of alc units.
14) Impact glass required.
15) An as built survey will be required after slab
inspection.
16) Require a final letter of approval from
engineer and architect.
17) Engineer shall verify all hurricane connectors.
18) Show draftstopping in attic area.
19) Show insulation R values.
Public Works DeDartment - Enaineerina Division comments:
1) The official address for the
development is 253 Miracle Strip Parkway SE.
2) Add " DO NOT ENTER"
signs at the exit drives and an arrow marking at the entrance
drives.
3) The radii at the
driveway connections onto Florida Blanca Place must be increased to 20
feet.
4) A Letter of Credit to the
City of Fort Walton Beach will be required for the installation of
the proposed sidewalk within the
right-of-way of Florida Blanca Place. The Letter of
Credit will be released after completion of sidewalk is
Department.
approved by the Public Works rI.,
J.
J,. .,
i.'.
5) Handicap ramps for sidewalks shall be constructed at raised curbs, according to the latest
Florida Accessibility Code.
6) Type of sanitation pickup service requested must be specified. Service
may be by
automated cans for individual use or
dumpster for shared or commercial use.
Automated cans must be able to be placed within 2 feet of the
curb with at least 3 feet of
clearance around each can and accessible to the
right side of the truck. Automated cans
must be stored in a location where
they are screened from the street.
11
Regular Council 8- 22- 06
SITE PLAN APPROVAL- HOLLIS REAL TV OFFICE
BUILDING cont
If a dumpster is to be
provided, a site for the dumpster must be shown on the plan at a
location that provides easy access and
departure of a garbage truck with no overhead
lines in the vicinity of the
pickup point. The current layout of the drives within the
development cannot be maneuvered by the sanitation trucks. Contact Joe Menda or
Gunn at (850) 833-9654 to discuss Jerry
specifics regarding the dumpster location.
I"'" 7) If a dumpster is to be
provided, the dumpster must be screened from the street. The
clearance through the gates of the enclosure shall not be
less than 10 feet 6 inches. This
must be specified on the plans.
CDS Deoartment comments:
1) On the site plan,