Patterson seconded
unanimously with Holmes, Patterson, Campbell, Tucker, motion
Minich in favor. Pullen, Hartwell, and
SITE PLAN APPROVAL -
INTERIORS BY THALIA
Consideration of a request by
Interiors by Thalia Office and
property owner, Caulfield Living Trust for site
Showroom at 4 plan approval to develop
existing pavement and small structures and the Chicago Avenue SE, consisting of the demolition of
a showroom and renovations of an existing warehouse
construction of a 1, 850 SF addition. building for use as
The City Attomey
gave the oath to all individuals who
expected to testifY on the matter.
John Snell, with
Design/ Build Systems, the applicant and architect for
no objection to the staff report. the project, confirmed there
was
Peggy Fowler, CDS Planner, submitted the staff
report for the record.
The Mayor opened the floor for
pUblic input. There being none, the
public hearing was closed.
Mr. Campbell moved to
approve the site plan for Interiors
SE, subject to the by Thalia located at 4 Chicago Avenue
following conditions:
Note: The recommendation is
based upon the
drawings developed by Choctaw application submitted by the applicant, site
plan
7/21/ 06) and Engineering, Inc. ( project 2006- 143-
A, dated 617/ 06, revised
architectural drawings developed
by Thalia", dated 6/ 7/ 06, revised 7/ 28/ 06). by Design/ Build Systems, lnc. (
project " Interiors
1. Prior to issuance of a
a. A
building penn it:
landscape planprepared by a professional
r' submitted and approved landscape architect or nurseryman must be
CDS by staff.
plan The must
regulations in Section 12. 71 of the LDC. comply with all applicable
be provided. Design for an irrigation
system with a well must
b. The plans must
address all applicable items
Utilities, CDS, and submitted by Pubic Works/
Building Inspections departments/ divisions in Engineering,
distributed at the July 11, 2006 DRC memorandums
CDS DeDartment - lnsDection meeting, ( as follows):
Division comments:
1) Submit 3 sets of
plans and five site/ civils.
2) Provide the usual
requirements.
3) I have a
question on the lift. If I am not available
at this
when you can. meeting, please give me a call
4) Provide tire rated wall
depending on Type construction on the south end of
bldg.
8
Regular Council 8-22- 06
SITE PLAN APPROVAL - INTERIORS BY THALIA cont.
Public Works DeDartment - Enaineerina Division comments:
1) The official address for the
development
is 4 Avenue SE.
Chicago
2) The alley shall not be used as the primary
ingress and egress to the property. A driveway
must be provided from the property
directly to the Chicago Avenue right-of- way.
3) The stop bar on the driveway must be placed so that vehicles
stop before reaching the
crosswalk.
Utilities DeDartment comments:
1) Site is under 1 acre and will not
require NPDES permit from FDEP.
2) The City/Stormwater Division will need a Stormwater
1
Management Plan to be submitted I
for review in order to reach plan approval.
3) The City will also need proper confirmation/
copy of permit from the FDEP for submittal of
Stormwater Management Plan.
4) According to sheet 4 of 7 " Grading and Drainage Plan" the scale is 1 "= 20'. Using this
scale the proposed contour lines of the retention
pond are 3' apart. This exceeds the City
of FWB' s LDC of no greater than 4: 1. The engineer needs to revise retention pond
contours accordingly.
5) Also on sheet 4 of 7 CRA Std. Notes # 3 Contact information needs to
change from City
Engineer to City Environmental Specialist (850) 833- 9932.
6) Utilities Operation Manager will provide standard notes,
please add those to the plan set.
Prior to issuance of the building permit, the above items shall be
addressed with any
necessary revisions submitted to the Stormwater Division/ Environmental Specialist for
approval. This review does not constitute approval from other City Departments. Final
approval for a permit shall be obtained from City Building Inspection.
CDS DeDartment comments:
1) The rear yard requirement for the MUCC- 2 District is 20'. The
existing building is allowed
as a
nonconforming use; however, the addition must meet the 20' setback or the applicant
must be granted a variance from the setback
requirement.
2) Pursuant to Section 12. 64.07, the
public alley cannot be used as the primary access to the
development. A two way drive must be constructed directly from Chicago Avenue for
primary access. Secondary access may be utilized from the existing pubic alley.
Utilities DeDartment comments:
Concurrency:
1) Page 2 of the
concurrency package lists 224 gallons per day (gpd) as the estimated water
demand and 172 gpd for wastewater demand. Please
verify that these demands are
sufficient for the 4,541 square foot development.
Utility plan:
1) The Utility Plan states that the
existing water and sewer connections will be used for the
building addition. Please show these connections on the Utility Plan.
a. The
existing 6" water main that lies within the eastern right-of-way of Chicago Avenue
SE is shown on the plans. However, there is also an
existing 2" water main that lies
within the western right-of-way of
Chicago Avenue that should be shown on the Utility
Plan.
b. From the existing 8" terra cotta sewer main
lying near the western edge of pavement
of Chicago Avenue SE, there are two available stub-outs
for service to the property.
r1
The first stub- out lies 46' south of the MH # 108 (
Temporary Benchmark # 2). The
second stub-out lies 94' south of MH # 108. Please show these stub-outs on the
Plan.
Utility
c. An existing 16" water main and a 16"
sanitary sewer force main owned and maintained
by Okaloosa County Water and Sewer should be located and shown on the
Prior to plans.
construction, OCWS should be contacted at (850) 651- 7176.
A note shall be
placed on the Utility Plan to warn the Contractor of the 16" mains.
d. The Developer shall be
responsible for installing all onsite water and sewer
e. The Contractor shall coordinate the water and piping.
sewer installation with the Utilities
Operations Manager at (850) 833- 9613.
9
Regular Council
8- 22-06
SITE PLAN APPROVAL - INTERIORS
BY THALIA cont.
2) For the proposed water mains,
please indicate the pipe size(s), material( s), and
of the proposed length( s)
piping on the Utility Plan.
3) Forthe proposed sewer