About this source
Action Item Printout from the Okaloosa County BOCC meeting of January 21, 2014 (IQM2 meeting #1187). Original portal label: Action Item Printout. Preserved as a historical public record; part of the meeting linked as a related source.
- Original publication
- Action Item Printout
- Date
- January 21, 2014
- Reference collection
- Okaloosa County Board of County Commissioners (IQM2 public portal)
HOW FAR THIS HAS BEEN CHECKED
- File / copy authenticity
- Preserved files carry a SHA-256 fingerprint fixed at ingest; whether those bytes match the original capture is not independently verified.
- Transcription / extraction
- Machine produced / unreviewed — machine-extracted, not yet human-corrected
- Claim corroboration
- Not independently verified
View reference catalogue / source ↗
Download this source
Action Item Printout (PDF)
Original PDF as published on the Okaloosa County IQM2 meeting portal.
PDF · 371.6 KB
Download ↓Machine-extracted text — 27-Action Item Printout.pdf
Text extracted on 2026-10-31 from 27-Action Item Printout.pdf using the PDF text layer (pdftotext). Not human-corrected; may contain recognition errors. Read alongside the source images.
Text · 2.6 KB
Download ↓
Full text
Machine-extracted from the source by optical character recognition. Not yet human-corrected — it may contain recognition errors. Read it alongside the images above.
BOARD OF COUNTY COMMISSIONERS
AGENDA REQUEST
DATE: January 21, 2014
TO: Honorable Chairman and Members of the Board
FROM: Sunil Harman
SUBJECT: Security Checkpoint Exit Lane Control System at NWFRA
DEPARTMENT: Airport
BCC DISTRICT: All
STATEMENT OF ISSUE: The Board of County Commissioners is requested to approve a
construction contract with Cathey Construction and Development, LLC for the Security
Checkpoint Exit Lane Control Systems project at Northwest Florida Regional Airport in the
amount of $496,846.00.
BACKGROUND: This project contains Sensitive Security Information that is controlled under
49 CFR Parts 15 and 1520. No part of the planning or design may be disclosed to persons
without a "need to know". Due to anticipated and eventual changes in Transportation Security
Administration (TSA) rules for funding personnel to monitor and deter access to the secured
areas of the airport through the exit lane, Northwest Florida Regional Airport has identified a
need to develop a more effective technological solution to monitor and control the passenger exit
lanes located at the security check point in the terminal facility. Currently, arriving passengers
exit the sterile area through a lane just north of the security check point located on the first level
of the terminal and the exit lane is manned by TSA officers to prevent unauthorized entry to the
sterile area of the concourse facility. There is a need to further strengthen the sterile areas of the
airport with architectural and technological barriers are being installed through the project. The
total project cost including design, bidding, the construction administration and professional
services and construction approval which is being sought in this agenda item is $617,907.00 of
which 50% is being funded by the Florida Department of Transportation and the local 50% share
through Passenger Facility Charge (PFC) to be approved in FAA PFC application #6.
The airport, in coordination with the TSA and Airlines has designed and bid an exit lane control
system that fulfills the TSA security requirements without the need for onsite monitoring
personnel. Bids for the exit lane control system improvements were opened December 4, 2013
and the County received two bids. Cathey Construction and Development, LLC was the lowest
responsive bidder in the amount of $496,846.00.
OPTIONS: Approve, Reject, or Table
RECOMMENDATIONS: Approve Cathey Construction and Development, LLC contract in the
amount of $496,846.00.
RECOMMENDED BY:
APPROVED BY:
Ernie Padgett, County Administrator
Related sources
This action item printout is part of the Okaloosa County BOCC meeting of January 21, 2014.