READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — April 5, 2016 — ARFF ROA-Attorney Correspondence Letter to Avcon and Email Coordination — reading text
Part 1 of 3. These parts divide the reading text for browsing; they are not the source document's page numbers.
ARFF ROA-Attorney Correspondence Letter to Avcon and Email Coordination — extracted reading text
Machine-extracted OCR text · Review label: Known limitations
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
ATTACHMENT A
BID TABULATION (3-18-16)
Eglin Air Force Base ARFF Development
Eglin Air Force Base, Florida
BID OPENING: January 27, 2016 at 2:00 PM
ENGINEER'S ESTIMATE EMR, Inc. Lord & Son
ITEM EXTENDED EXTENDED EXTENDED
BID ITEM ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE UNIT PRICE UNIT PRICE
NUMBER TOTAL TOTAL TOTAL
Base Bid - ARFF Station Development
1 M-101-1 MOBILIZATION AND MAINTENANCE OF TRAFFIC LS 1 $ 75,000.00 $ 75,000.00 $ 22,500.00 $ 22,500.00 $ 301,683.00 $ 301,683.00
2 P-151-1 STRIPPING AND STOCKPILING SY 11,500 $ 1.00 $ 11,500.00 $ 2.00 $ 23,000.00 $ 0.54 $ 6,210.00
3 P-152-1 EXCAVATION AND EMBANKMENT LS 1 $ 20,000.00 $ 20,000.00 $ 39,500.00 $ 39,500.00 $ 28,743.00 $ 28,743.00
4 P-152-2 SUBGRADE PREPARATION SY 4,300 $ 1.50 $ 6,450.00 $ 6.00 $ 25,800.00 $ 5.00 $ 21,500.00
5 P-156-1 EROSION AND POLLUTION CONTROL LS 1 $ 7,000.00 $ 7,000.00 $ 23,000.00 $ 23,000.00 $ 13,976.00 $ 13,976.00
6 P-209-1 CRUSHED AGGREGATE BASE COURSE, 6" SY 2,200 $ 18.00 $ 39,600.00 $ 17.50 $ 38,500.00 $ 22.33 $ 49,126.00
7 P-211-1 LIMEROCK BASE COURSE, 8" SY 950 $ 15.00 $ 14,250.00 $ 19.00 $ 18,050.00 $ 20.45 $ 19,427.50
8 P-501-1 PCC PAVEMENT, 10" SY 2,050 $ 110.00 $ 225,500.00 $ 75.00 $ 153,750.00 $ 78.75 $ 161,437.50
9 T-904-1 SODDING, BAHIA ARGENTINA SY 12,500 $ 3.00 $ 37,500.00 $ 3.50 $ 43,750.00 $ 3.00 $ 37,500.00
10 D-701-1 18" RCP, CLASS III LF 210 $ 40.00 $ 8,400.00 $ 55.00 $ 11,550.00 $ 41.60 $ 8,736.00
11 D-701-2 18" RCP, CLASS V LF 70 $ 60.00 $ 4,200.00 $ 60.00 $ 4,200.00 $ 46.00 $ 3,220.00
12 D-751-1 TYPE F DITCH BOTTOM INLET EA 3 $ 3,300.00 $ 9,900.00 $ 3,500.00 $ 10,500.00 $ 2,171.00 $ 6,513.00
13 D-751-2 18" MES EA 2 $ 1,500.00 $ 3,000.00 $ 1,050.00 $ 2,100.00 $ 608.50 $ 1,217.00
14 334-1 SUPERPAVE ASPHALTIC CONCRETE TON 110 $ 130.00 $ 14,300.00 $ 150.00 $ 16,500.00 $ 145.00 $ 15,950.00
15 520-1 CONCRETE SPILLWAY LS 1 $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 7,096.00 $ 7,096.00
16 520-2 CONCRETE "F" CURB LF 450 $ 20.00 $ 9,000.00 $ 25.00 $ 11,250.00 $ 19.30 $ 8,685.00
17 520-3 CONCRETE DUMPSTER PAD, ENCLOSURE, AND APRON LS 1 $ 13,000.00 $ 13,000.00 $ 12,500.00 $ 12,500.00 $ 16,992.00 $ 16,992.00
18 522-1 CONCRETE SIDEWALK SY 250 $ 40.00 $ 10,000.00 $ 40.00 $ 10,000.00 $ 29.70 $ 7,425.00
19 527-1 DETECTABLE WARNING SURFACE EA 2 $ 400.00 $ 800.00 $ 330.00 $ 660.00 $ 363.50 $ 727.00
20 530-1 RIPRAP (RUBBLE) (18" DEPTH) SY 120 $ 100.00 $ 12,000.00 $ 58.00 $ 6,960.00 $ 86.00 $ 10,320.00
21 700-1 VEHICULAR SIGNAGE LS 1 $ 500.00 $ 500.00 $ 400.00 $ 400.00 $ 392.00 $ 392.00
22 710-1 VEHICULAR PAVEMENT MARKINGS LS 1 $ 4,000.00 $ 4,000.00 $ 900.00 $ 900.00 $ 720.00 $ 720.00
23 02660-1 POTABLE WATER IMPROVEMENTS LS 1 $ 35,000.00 $ 35,000.00 $ 37,500.00 $ 37,500.00 $ 43,055.00 $ 43,055.00
24 02730-1 SANITARY SEWER IMPROVEMENTS LS 1 $ 15,000.00 $ 15,000.00 $ 16,500.00 $ 16,500.00 $ 12,250.00 $ 12,250.00
25 SS-1 SEPTIC SYSTEM, COMPLETE LS 1 $ 40,000.00 $ 40,000.00 $ 21,000.00 $ 21,000.00 $ 20,702.00 $ 20,702.00
26 WH-1 WHEEL STOP EA 7 $ 55.00 $ 385.00 $ 75.00 $ 525.00 $ 67.00 $ 469.00
27 SD-1 1 WAY 4" PVC SPLIT DUCT CONCRETE ENCASED LF 75 $ 20.00 $ 1,500.00 $ 35.00 $ 2,625.00 $ 42.50 $ 3,187.50
27A EB-1 REMOVE AND INSTALL NEW AIRCRAFT RATED ELECTRICAL JUNCTION BOX LS 1 $ 10,000.00 $ 10,000.00 $ 17,500.00 $ 17,500.00 $ 9,173.00 $ 9,173.00
28 AL-1 SIGNAGE ALLOWANCE AL 1 $ 20,000.00 $ 20,000.00 $ 20,000.00 $ 20,000.00 $ 20,000.00 $ 20,000.00
29 AL-2 TRANFORMER AND PRIMARY POWER ALLOWANCE AL 1 $ 75,000.00 $ 75,000.00 $ 75,000.00 $ 75,000.00 $ 75,000.00 $ 75,000.00
30 AL-3 OWNER ALLOWANCE AL 1 $ 50,000.00 $ 50,000.00 $ 50,000.00 $ 50,000.00 $ 50,000.00 $ 50,000.00
30A AL-4 OBSTRUCTION LIGHTING ALLOWANCE AL 1 $ 30,000.00 $ 30,000.00 $ 30,000.00 $ 30,000.00 $ 30,000.00 $ 30,000.00
1
31 ARFF-1 ARFF BUILDING, COMPLETE LS 1 $ 2,200,000.00 $ 2,200,000.00 $ 2,440,556.75 $ 2,440,556.75 $ 2,159,200.00 $ 2,159,200.00
Subtotal Amount: $ 3,007,785.00 $ 3,191,576.75 $ 3,150,632.50
Additive Alternate No. 1 - Waterline Materials
32 WM-1 PIPE, 10", C-900, DR18, BLUE (10,760 LF) LS 1 $ 90,000.00 $ 90,000.00 $ 94,894.59 $ 94,894.59 $ 97,966.00 $ 97,966.00
33 WM-2 PIPE, 10", D.I., S.J. CLASS 350, 20' LENGTHS (400 LF) LS 1 $ 10,000.00 $ 10,000.00 $ 10,048.80 $ 10,048.80 $ 9,107.00 $ 9,107.00
34 WM-3 PIPE, 8”, C-900, DR-18, BLUE (300 LF) LS 1 $ 2,500.00 $ 2,500.00 $ 1,828.50 $ 1,828.50 $ 2,479.00 $ 2,479.00
35 WM-4 PIPE, 6”, C-900, DR-18 BLUE, 20’ LENGTHS (1,500 LF) LS 1 $ 5,500.00 $ 5,500.00 $ 5,342.40 $ 5,342.40 $ 5,470.00 $ 5,470.00
36 WM-5 PIPE, 6”, D.I., S.J., Class 350, 20’ LENGTHS (140 LF) LS 1 $ 2,000.00 $ 2,000.00 $ 2,055.34 $ 2,055.34 $ 1,859.00 $ 1,859.00
37 WM-6 TUBING, 2”, 200 PSI, CTS, BLUE, 100’ ROLLS (200 LF) LS 1 $ 300.00 $ 300.00 $ 318.00 $ 318.00 $ 320.00 $ 320.00
38 WM-7 BEND, 10”, 90 DEGREE, D.I., M.J., TYLER UNION, DOMESTIC (1 EA) LS 1 $ 300.00 $ 300.00 $ 292.56 $ 292.56 $ 270.00 $ 270.00
39 WM-8 BEND, 10”, 45 DEGREE, D.I., M.J., TYLER UNION, DOMESTI (22 EA) LS 1 $ 4,000.00 $ 4,000.00 $ 4,314.20 $ 4,314.20 $ 3,870.00 $ 3,870.00
40 WM-9 BEND, 10”, 22-1/2 DEGREE, D.I., M.J., TYLER UNION, DOMESTIC (2 EA) LS 1 $ 400.00 $ 400.00 $
