March 17, 2020

Okaloosa County BOCC — March 17, 2020 — J & P Construction — change order 01 for contract C19-2817-WS

J & P Construction — change order 01 for contract C19-2817-WS in the March 17, 2020 Okaloosa County BOCC meeting materials. Preserved county-portal original with machine-extracted reading text.

FILED WITH

About this source

Preserved among the March 17, 2020 Okaloosa County Board of County Commissioners meeting materials (IQM2 meeting 1675). The date shown is the verified meeting context, not an independently established creation date for every attachment. The download catalog used February 18, 2020; the meeting date was corrected using the agenda/minutes heading and matching source filename.

Original publication
J&P CO 01
Date
March 17, 2020
Publisher
Okaloosa County Board of County Commissioners
Where to find it
2
Reference collection
Okaloosa County Board of County Commissioners (IQM2 public portal)

Source date and document identity checked for this intake. Machine text has not received independent human proofreading.

HOW FAR THIS HAS BEEN CHECKED

File / copy authenticity
Every preserved file is checksummed with SHA-256 when it is added, so any later change to the stored bytes would show. That confirms the file is unchanged since ingest — it does not prove the file matches the original source, who produced it, or when it was captured.
Transcription / extraction
Each reading-text file shows its recorded review status below.
Claim corroboration
Not independently verified
View reference catalogue / source ↗

Download this source

J & P Construction — change order 01 for contract C19-2817-WS — extracted reading text

Machine extraction of the preserved PDF embedded text using pdftotext -layout. Form-feed page boundaries retained; no words rewritten. Not independently human proofread; consult the original for layout and uncertain characters.

Text · 4.4 KB · 2

Download ↓

J & P Construction — change order 01 for contract C19-2817-WS — preserved PDF

Unchanged downloaded original; SHA-256 checked against the capture inventory.

PDF · 362.7 KB · 2

Download ↓

Reading text preview

Compare reading text with the preserved source. Line breaks and spacing are retained; long lines wrap to fit the screen. A file's role does not establish that its text has been checked.

J & P Construction — change order 01 for contract C19-2817-WS — extracted reading text

Machine-extracted OCR text · Review label: Known limitations

CHANGE ORDER FORM Date: _9_-_2_81_7_-_W_S_ _ _ _Change Order No.: _01 --"0=3/=0=2/-=-20=2=0_ _Contract No.: _ Cl _ __ _ Owner: OKALOOSA COUNTY BOARD OF COUNTY COMMISSIONERS Contractor: J & P Construction Company, Inc. ----------~~------------------- CHANGE TO CONTRACT PRICE DESCRIPTION AMOUNT Oriainal Contract Price : $2,970,000.00 Net chanqe by p reviously authorized Chanqe Orders: $0.00 Present Contract Price: $2,970,000.00 This Chanqe Order will (eElEl/EleEl1:,1eP: $0.00 New Contract Price: $2,970,000.00 CHANGE TO CONTRACT TIME DESCRIPTION DATE or NUMBER OF DAvs Oriqinal Contract Time: 285 Oriainal Substantial Comoletion Date: March 11 , 2020 Net chanqe by previously authorized Chanqe Orders: 0 This Change Order will (add/EleElb16t': 75 New Contract Time: 360 New Substantial Completion Date: May 25, 2020 APPROVALS REQUESTED BY: & ~ £!.-JJL DATE:_ -= 3+,A . . .;; ~,..,fa _o/_O_ _ __ PROJECTENGIN~ :~ L DATE:_~3=/~04 ~/~2= 02=0~ - - - - - CONTRACTOR:~ ~ "-- DA TE:_-= 3/'"""'0'""'4...,/2=0=20 = ----- -- - OWNER: _ _ _ _ _ _ _ _ _ _ _ _ _ __ DA TE: _ _ _ _ _ _ _ _ _ __ Robert A. "Trey" Goodwin Ill, Chairman This Change Order is an amendment to the Contract/Agreement between Contractor and the Owner, and all other contract provisions shall remain in full force and effect unless specifically amended in writing, signed by both parties. POST OFFICE DRAWER 3147 CONSTRUCTION CO., I NC. TELEPHONE 205 / 345-6631 TUSCALOOSA, ALABAMA 35403 CONTRACTORS & ENG INEERS FAX 205 / 345-6652 March 2, 2020 Joey Crews, P.E. Constantine Engineering 1988 Lewis Turner Blvd., Unit 3 Fort Walton Beach, FL 32547 Project: Arbennie Pritchett WRF Reclaimed Water Expansion Joey, We hereby request a 75 day contract time extension on this project due to delays by Veolia (Kruger) in the delivery of the new filter. The delay from Veolia is due to the longer than expected transit time for oversees shipment and coming thro

Download this text file with its original spacing ↓

Read all text · 1 part →

Only a preview is loaded on this record page. The linked reading pages contain the remaining text and work without JavaScript.

Citation & reuse

Okaloosa County Board of County Commissioners. “Okaloosa County BOCC — March 17, 2020 — J & P Construction — change order 01 for contract C19-2817-WS.” March 17, 2020. J&P CO 01. Crypt of Echoes evidence ID LED-2026-e63944da056d4acca1f65377a097090d. https://cryptofechoes.com/evidence/LED-2026-e63944da056d4acca1f65377a097090d. Accessed [date].

Catalogue citation: Okaloosa County Board of County Commissioners, J & P Construction — change order 01 for contract C19-2817-WS, meeting materials for March 17, 2020. https://okaloosacountyfl.iqm2.com/Citizens/FileOpen.aspx?Type=4&ID=23201&MeetingID=1675

Preserved county public-record source. Third-party attachments may retain their original rights.

Technical archive record ↓