READ ALONGSIDE THE SOURCE
Fort Walton Beach Resolution — 75-16-Shoreline erosion prevention-LJP — reading text
Part 2 of 2. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-7355-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
SANTA ROSA ISLAND AS SET
° FORT IN SECTION 193 OF THE RIVER AWD HARBOR
ACT OF 1962, AS AMENDED.
WHEREAS, Section 103 of the River and Harbor Act of 1962, as
anended, provides authority for the Chief of Engineers to develop and
construct coastal shore and beach restoration and protection projects,
and .
WHEREAS , said law provides that the cost of such projects shall
be complete, economically justified and is limited to a Federal | cost of
RO more than $1,000,000 and that such p projects may be constructed without
specific authorization of Congress, and |
WHEREAS, the Santa Rosa Islaad Authority, established in 1947 in
accordance with Chapter 24,500, Laws of Florida, is a public agency fully
authorized under 3tate Laws co‘ give such assurances and capable of fulZill-
ing all measures of local cosperation, aud
WHEREAS, erosion dawige on the beaches of Santa Rosa Island along
the Inter-Coastal Waterway of Santa Rosa Sound has become @ serious problen
and reduced such beaches, at points where they are now non-existent, and
WIEREAS, Santa Resa Islend is the primary recreation area for the
Persacols eres, and approiimately five million visitors utilized these beachas
in the Past twelve months, and °
WIEREAS, the loss nf these beaches will seriously affect the
iszportant tourist tudustry and cause extreme adverse .uffect on tha economy
of Plorita, aad .
WREDEAS, 1f buach vrosioa is allowed to continue wtmabated, serious
damage will be sustainad by upland croperty ormers In addition to possible
adverse onvirenmintal .flect if the sevace traatmant plane is undermined
and contaninates the local waters aad beaches;
1 f .
7 a ee eee er eS
ee ee a. rnc. rent rt nea tt mate ten cn on ;
: -
PRS.
NOW, THERE PSRE , RE IT RESOLVED by the Boars "y County
nd
Commissioners of Escambia County, assembled in meeting this 17th _
day of October, 1974, that the Chief of Engineers authorize and.
‘direct the District Engineer, Mobile District, United States Arny Corns
of *ngineers to undertake as soon as possible a study of the eroslon
problens of the beaches affecting Santa Rosa Island, with such study
resulting in recommendations and/or corrective measures aS may be required,
“STATE OF FLORIDA,
COUNTY OF ESCAMBIA,
I, Joe A, Flowers, Comptroller and ex-officio Clerk to
the Board of County Commissioners in and for the County and State
aforesaid, do hereby certify that the above and foregoing is a
true and correct copy of a resolution as the same was duly adopt-
‘ae
ed and passed at a regular meeting of the Board on the 17th day
official seal this IST day of October, 1974,
JOE A, FLOWERS, COMPTROLLER
AND EX-OFFICIO CLERK TO THE
BOARD OF COUNTY COMMISSIONERS
OF ESCAMBIA COUNTY, FLORIDA.
By: ©. (Vic Arn
Deputy Clerk
(S E AL)
