READ ALONGSIDE THE SOURCE
Fort Walton Beach Council agenda — 10-09-2007 workshop agenda — reading text
Part 8 of 18. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-13650-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
2
processing fee) processing fee
1 $
fee $ 20 303
36. 00 base + 30 base + 60= Res 10 base + 25 base + 30 base + 10 base +
Plumbing &
Gas Permit 3. 10 / fixture 4. 00/fixture 120= Com 4.00/fixture 2. 00/ fixture 2. 00/ fixture + 2. 00/ fixture
processing ( no processing processing fee
1 2 $
fee $ 20 fee) 303
Electrical 36. 00 base + 30 base + 60= Res 10 base + 25 base + 30 base + 10 base +
Permit 1.50 l. OO/circuit 120= Com 1.OO/ circuit 1.OO/ circuit OO/ circuit +
l. 2. 00/ circuit
circuit + ( no processing processing fee
2 $
processing fee) 303
1
fee $ 20
6ite Plan 50% of BP 20% ofBP 50% ofBP N/A 50% ofBP 50% ofBP fee N/A
fee fee/25. 00 fee fee/lO, OOOsf
minimum + or 4 stories
Re-inspection 35. 00 30.00 lst= Free 30. 00 Is~ 20
Fee 2nd",,
60 2nd",,
40
3rd= 240 . 3rd",,
80
Revisions to 25= SFD 25= Res Y2 base 25= Res 30 = All
approved 50==:
MF 50= Com pennit fee 50= Com
Permit (new) 75= Com
ICC Fees + cost 200 proposed 30 60 N/A 200 100 N/ A
ofICC review
1 2 U3
base fee of N/A N/ A N/A processing N/ A
Permit processing
fee of $20 $ 60 added to fee of $30
processing fee
new) added to ALL building added to ALL
pennits pennits only pennits
All figUres are in $ dollars unless otherwise noted.
The permit fees have been increased approximately 2% including the base fee rrom $35. 00 to $36.00. All other
miscellaneous fees have been increased by 11.4%, except re- inspections and permit revisions which are based
on costs estimates to perform the task ($35. 00). A $ 20 permit processing fee will also be charged to cover the
cost of processing all building permits.
Schedule ofpennit Fees. 2007- 8compare
TABLE 3. PERMIT STATISTICS BY PER1\1IT TYPE
PREPARED 9/~ 8/ 07 , 9: 55:~ 3 PERMIT STATISTICS BY PERMIT TYPB PAGB 1
PROGRAM BP401L BUILDING DIVISION
City of Fort Walton Beach
CURRENT PERIOD ' l'
1U SAME PaRIOD PREV YBAR PREV YBAR ' l'
1U
PERMIT TYPa 10/ 01/ 06- 9/ 15/ 07 10/ 01/ 06- 9/~ 5/ 07 10/ 0~/ 05- 9/ 15/ 06 ~ 0/ 0~/ 05- 9/~ 5/ 06
VALUATION ISSUED FaBS ISSUED FBBS ISSUED FBBS ISSUBD FaBS
BUILDING PBRMIT 4621446 371 34833. 35 371 34833. 35 487 48750. 55 487 48750. 55
BUILDING PERMIT W/ NO PC FRS n69930 286 20847. 10 286 20847. 10 533 42528. 30 533 42528. 30
BUILDING PBRMIT ' If/ PC FBB 28936755 5~ 134654. 00 51 134654. 00 55 98389. 80 55 98389. 80
CARNIVAL PBRMIT 0 0. 00 0. 00 0. 00 0. 00
DEMOLITION PERMIT 0 29 ~ 345. 00 29 1345. 00 46 2255. 40 46 2255.40
BLBCTRlCAL PERMIT 3500 325 16770. 60 325 ~ 6770. 60 479 26844. 50 479 26844. 50
FILL 0 0. 00 0. 00 0. 00 0. 00
FIRE SPRINXLBR 0 22 973. 15 22 973. 15 11 ~ 459. 81 11 1459. 81
FOUNDATION PBRMIT 0 0. 00 0. 00 2 87. 70 2 87. 70
GAS PERMIT 300 104 3707. 00 104 3707. 00 120 4075. 00 120 4075. 00
LJ\ND CLBARING & GRUBBING 0 7~ 75. 00 7 175. 00 ~ 2 275. 00 12 275. 00
MECHANICAL PERMIT 2166745 171 10463. 50 171 10463. 50 206 12694. 65 206 12694. 65
MOVING PERMIT 0 0. 00 0. 00 1 107. 00 1~ 07. 00
NO PBRMIT NBlIDBD 0 85 . 00 85 . 00 29 . 00 29 . 00
P/ W INFRASTRUCTURB PERMIT 0 6. 00 6. 00 20 . 00 20 . 00
0 0. 00 0. 00 0. 00 0. 00
PAVING PERMIT
PLUMBING PERMIT 6003 ~ 54 8567. 87 154 8567. 87 238 18207. 60 238 18207. 60
PERMIT ~ 4750 6 241.90 6 24~ . 90 0. 00 0. 00
REVISION
PBRMIT 0 0. 00 0. 00 0. 00 0. 00
ROOF
SIGN PBRMIT 155401 119 3232. 40 119 3232. 40 ~ 36 398~. 30 136 3981.30
0 0. 00 0. 00 0. 00 0. 00
STORMWATBR
SWIMMING POOL PBRMIT 989198 29 6707. 60 29 6707. 60 30 6226.~ 0 30 6226. 10
UNDBRGROUND GAS 0 1 150. 00 1 150. 00 0. 00 0. 00
BQlJIPMI!NT
TOTALS: 3906402 ~ 766 242668. 47 2405 265882. 71 2405 265882. 71
FBBS LISTBD ARB FBBS COLLBCTBD
CRAFT.
a.y Of FO.it: Walton Beach
Corii' p( eMnsivQ Fee Sehedule
tml"nt Rmt'o, ~ ~ ~ . . . ~ ~ - ~. ~ - 0=;>[
Oej,,';, ~ f!~ oju!\
