READ ALONGSIDE THE SOURCE
Fort Walton Beach Council agenda — 10-09-2007 workshop agenda — reading text
Part 6 of 18. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-13650-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
encroachment of structures into existing rightso- f- way.
10. 91. 02 Permit Required
Except as provided in this section, no person shall construct or maintain any structure or facility
including utilities) or make any other use of a public road or future road righto- f- way unless and
until a permit has been issued by the public works director pursuant to the city council approving
and authorizing such construction, maintenance or use. All applications for the use of public right-
of-way must describe the space to be used and the length of time of such use. Permits may be
granted for a period of time not exceeding six months, but may be renewed from time to time for
periods not to exceed six months, if the encroachment does not unreasonably restrict the public
use of the right-of- way and the encroachment is necessary to accomplish the objective for which
it is requested in a reasonable manner.
10. 91. 03 Minimum Right-of- Way Requirements
No person shall willfully obstruct any portion of the righto- f- way for a new roadway identified in the
future traffic circulation map series established in the traffic circulation element of the
comprehensive plan. No person shall construct any structure or facility ( including utilities) or make
any other use of the right-of- way for a new roadway identified in the future traffic circulation map
series unless and until a permit has been issued by the public works director pursuant to the city
council authorizing and approving such construction, maintenance or use as described in this
section. The following minimum righto- f- way widths for new roadways identified in the traffic
circulation element of the comprehensive plan are established as follows:
10. 91. 04 Presumptions
Any person who obstructs a public road or future road right-of- way shall be presumed to have
done so willfully if the obstruction is allowed to remain on the right-of- way for a period of 24 hours
after the person has been notified to remove the obstruction by the city councilor its authorized
representative.
10. 91. 05 Roadside Stands Prohibited
It shall be unlawful for any person or persons to operate or cause to be operated any roadside
stand within or on any portion of the righto- f- way of any public road.
10. 91. 06 Exceptions
The following shall be exceptions from the requirements of this section:
1) Improvement of a public road by a property owner of such public road adjacent to
his or her property with landscaping, shrubbery or grass which is not inconsistent with
the use of the public road for road purposes;
2) The parking of motor vehicles on that portion of the public road not used as traffic
lanes if not otherwise prohibited;
3) Use of the public road for road and traffic purposes other than such purposes involving
vehicles of such weight or of such characteristics (for example, metal tires or treads) as may, in
the opinion of the city engineer, damage the road surface;
4) The replacement or maintenance of existing utility facilities, such as telephone poles.
Violation Test
RIGHT-OF- WAY PROTECTION SECTION 10-91. 02 PERMIT REQUIRED. STORAGE
OF VEHICLES ON THE CITY RIGHT-OF- WA Y WITHOUT A PERMIT. PLEASE OBTAIN
PERMIT OR REMOVE ALL VEHICLES.
Violation Corrective Action
Obtain permit and/
or conform to Section 10-
91. 02.
11,' (' f,
j
J ',' : e; ,/, j /,,;!.;
r'; . ,// ' 1/., /". f. 1/
Complaints.
Any citizen who has knowledge of a violation of any other City ordinance may file a
notarized Affidavit of Complaint using the form provided by the Community
Development Service The affidavit can be mailed, faxed,or hand delivered, and shall be
filed with the City department having administrative jurisdiction over the alleged
violation
a. Complaints from citizens or a legitimate business shall be investigated upon notice in
a form that includes legible name, signature, address or
any other means where the
complainant is identifiable. This is in lieu of the required notarized affidavit.
b. Investigations should be as a result of an identifiable complainant as prescribed above.
Aesthetics alone shall not be a case where city officials shall act/enforce upon private
property without a complaint. The City shall enforce violations in cases where health and
safety are issues. The City will, upon request, provide the respondent with a copy of the
alleged Affidavit of Complaint.
c. Plaintiffs shall be entitled, if cited, to a hearing in front of the Code Enforcement
Board for the purpose of receiving relief from enforcement in cases where a hardship or
special condition exist as determined by the Board. A fee ( to be determined by the Code
Enforcement Board) to cover cost of this action should be charged for such a hearing. No
fees shall be assessed if the case is dismissed.
Advisory Legal Opinion - Code enforcement, search of private property Page 1 of 4
Florida Attorney General
Advisory Legal Opinion
Number: AGO 2002- 27
Date: April 4, 2002
Subject: Code enforcement,search of private property
Mr. Mark F. Carpanini
Polk County Attorney
Drawer AT01
Post Office Box 9005
Bartow, Florida 33831- 9005
RE: LOCAL GOVERNMENT CODE ENFORCEMENT BOARDS- COUNTIES- ORDINANCES--
INSPECTIONS- MARRANTS- authority of code enforcement officers to search
private property. U. S. Const. amend. XVi Fla. Const. Art. 12, s. 12i Ch.
162, Fla. Stat.
Dear Mr. Carpanini:
You have asked for my opinion on substantially the following question:
Is local government code inspector authorized by law to enter onto
a
private premises to conduct inspections or assure compliance with local
technical codes without the consent of the owner or occupant, or having
first procured a warrant?
In sum:
A local government code inspector is not authorized to enter onto any
private, commercial or residential property to assure compliance with or
to enforce the various technical codes or to conduct any administrative
inspections or searches without the consent of the owner or the operator
or occupant premises, or without
of such a duly issued search or
administrative inspection warrant.
Part I of Chapter 162, Florida Statutes, was adopted to
promote, protect, and improve the health, safety, and welfare of the
citizens of the counties and municipalities of this state by authorizing
the creation of administrative boards with authority to impose
administrative fines and other noncriminal penalties to provide an
equi table, expeditious, effective, and inexpensive method of enforcing any
codes and ordinances in force in counties and municipalities, where a
pending or repeated violation continues to exist."[ 1]
10/ 9/ 2007
http:// myfloridalegal. com/ago. nsf/printview/ 830A 1 05DC73A 1 04D85256B91 0071 CDD4
CITY COUNCIL WORKSHOP
October 9, 2007
Workshop Agenda
Review of Fee Schedule Revisions for the Community
Development Services Department
CDS Director)
WA- 3
Agenda Item Number:
CITY OF FORT WALTON BEACH
CO~ TYDEVELOPMENTSERVICESDEPARTMENT
ZONING & BUILDJNG DIVISION
MEMORANDUM
Date: Thursday, October 04, 2007
To: Joyce Shanahan, City Manager
Via: Missy McKim, Director CDS
From: Malcolm H. Foley, AICP, Supervisor
Zoning & Building Division
SUBJECT: Fee Schedule Revisions- 2007/ 2008 and Changes to Building Permit Process
Fee Schedule Revisions- 2007/ 2008
Please find the attached " Comprehensive Fee Schedule - 2007108" which outlines the fee increases for
building permits and administrative costs administered by the CDS Department ( adopted on September
5, 2007). New fees are underlined, previous fees are stricken through. A table is also included
comparing current charges imposed for similar charges by other local governments and a report listing
statistics for permit types and fees collected dating from October 1, 2006 to September 15, 2007 ( Table
3). Also note the Building Division has shown a $247, 513 surplus since October 1, 2003 to September
30, 2006 ( see Table 1).
New fees have been created to cover the cost of the Building Division' s expenses as follows:
1. Processing fee.
A 'processing fee' of$20. 00, in addition to the permit base fee of$36. 00 has been introduced to
cover the cost to process the permit. In order to mitigate slow construction periods, these
processing fees help cover the cost of operating a building division without relying on the cost of
the permit, itself. Since the construction industry is a volatile trade with peaks and valleys in
construction activity, a processing fee is better suited to cover costs. For that reason the fee
schedule has been amended to include a $ 20 processing fee for all permits including the trade
disciplines for mechanical, electrical, plumbing and gas.
2. Re- inspection fee.
The re- inspection fees have been increased from $ 10. 00 to $ 35. 00 for the 1st and 2nd re-
inspections. The 3rd re- inspection will cost $ 105, to provide incentive for the work to be
corrected appropriately and to eliminate premature calls for inspections of incomplete work.
3. Certificate of occupancy and completion inspection fee.
Inspection fees for a certificate of occupancy or a certificate of Completion have been increased to
35. 00 from $ 15. 00 to cover the city' s cost to provide the inspection service.
4. Revision fee.
Revisions to an approved permit have b~ n charged an administrative fee to handle the processing
involved by Building Division staff. Revisions to submitted permits have become numerous and in
some instances cumbersome. The new revision fees are $ 25. 00 for single family, $ 50. 00 for
Page 1 of4
multi- family and $ 75. 00 for commercial permit applications.
5. Threshold building application fee.
Plans for buildings in excess ofthree (3) stories are required to be sent to the International Code
Council in Birmingham, Alabama for review and approval prior to the issuance of the permit.
Building Division staff must co- ordinate and manage this process. A new fee of $200 .00 has been
established to cover the
