READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — October 2, 2012 — reading text
Part 27 of 37. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — 01-Agenda Packet.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
by the terms and conditions of the Agreement, including, without limitation, rules for authorized and unauthorized use of cards,
disputes of charges, reporting lost and stolen cards, and all other rules and provisions relating to use of Participating Entity’s account.
4. Participating Entity acknowledges that its failure to make timely payment in accordance with the terms of the Agreement and/or the Addendum may result in
suspension or cancellation of the account(s). The undersigned represents and warrants that he/she is duly authorized to execute this Addendum on behalf
of the Participating Entity and this Addendum is the valid and binding obligation of the Participating Entity, enforceable in accordance with its terms.
INFORMATION SHARING DISCLOSURE: Information regarding your transactions may be provided to the State, accepting merchants or their service providers
to facilitate discounts or other promotional campaigns of interest to you.
U.S.A. PATRIOT ACT: Our bank complies with Section 326 of the USA PATRIOT Act which requires all financial institutions to obtain, verify, and record
information that identifies each company or person who opens an account. What this means for you: when you open an account, we will ask for your name,
address, date of birth, and other information that will allow us to identify you. We may also ask to see your driver’s license or other identifying documents for your
business.
DISCLAIMER: THIS IS AN APPLICATION FOR SERVICES AND SHALL NOT BE BINDING UPON WEX FSC UNTIL FINAL CREDIT APPROVAL
HAS BEEN GRANTED BY WEX FSC.
CONTRACTING AGENCY AUTHORIZED SIGNATURE REQUIRED
Any person signing on behalf of the Participating Entity has been duly authorized by all necessary action of Applicant's governing body, and that the undersigned is
authorized to make this application on behalf of the Participating Entity.
Signature: Printed Name:
Title: Date:
Complete and sign addendum. Fax to 1-800-831-4019.
FOR OFFICE Oppty Number Sales Code Plastic Type Coupon Code Account Number
USE ONLY 10900154 SFL2 FL1 04
04.ADDEND.CRDAPP (11/08) Packet Pg. 229
8.5.1.b
Packet Pg. 230
Attachment: WEX FSC completed coordination (1119 : Approval of Fuel Card Agreement)
8.5.1.c
Packet Pg. 231
Attachment: WEX State Fuel Card Contract (1119 : Approval of Fuel Card Agreement)
8.5.1.c
Packet Pg. 232
Attachment: WEX State Fuel Card Contract (1119 : Approval of Fuel Card Agreement)
8.5.1.c
Packet Pg. 233
Attachment: WEX State Fuel Card Contract (1119 : Approval of Fuel Card Agreement)
8.5.1.c
Packet Pg. 234
Attachment: WEX State Fuel Card Contract (1119 : Approval of Fuel Card Agreement)
8.5.1.c
Packet Pg. 235
Attachment: WEX State Fuel Card Contract (1119 : Approval of Fuel Card Agreement)
8.6.1
BOARD OF COUNTY COMMISSIONERS
AGENDA REQUEST
DATE: November 6, 2012
TO: Honorable Chairman and Members of the Board
FROM: John Hofstad
SUBJECT: Extension of Maintenance Bond for Mossy Oaks Plantation Phase 1
DEPARTMENT: Public Works
BCC DISTRICT: Three
STATEMENT OF ISSUE: The developer is requesting an extension of the maintenance bond
(Irrevocable Standby Letter of Credit No. 226) for Mossy Oaks Plantation Phase I subdivision.
BACKGROUND: Mossy Oaks Plantation Phase 1 subdivision was accepted by the Board to
enter into the 18-month warranty period on January 11, 2011. The Irrevocable Standby Letter of
Credit No. 226 in the amount of One Hundred Twenty Seven Thousand Dollars ($127,000.00)
was provided by the developer to serve as maintenance bond. The letter of credit will expire on
December 14, 2012 and numerous project deficiencies have not been rectified by the developer.
The extension of the bond will give the developer additional time to correct the project
deficiencies.
The developer is requesting approval from the Board of County Commissioners to obtain an
extension to the letter of credit so that they can perform the necessary repairs. If approval from
the Board of County Commissioners is granted, the developer will have until November 28, 2012
to present the new letter of credit to staff for formal acceptance by the Board of County
Commissioners at the next regularly scheduled meeting. Should the Board of County
Commissioners deny the request for an extension the developer shall have until December 14,
2012 to perform all repairs or the County will act on the existing letter of credit.
OPTIONS: Approve/Disapprove the developer’s request and authorize action on the letter of
credit to perform the necessary repairs.
RECOMMENDATIONS: Approve a one (1) year extension of the maintenance bond and
require the developer to submit the extended bond on or before November 28, 2012.
Packet Pg. 236
8.6.1
RECOMMENDED BY:
APPROVED BY:
James D. Curry, County Administrator
Packet Pg. 237
8.6.1.a
Attachment: 18 Month Inspection Report Mossy Oak Plantation Phase 1 (1065 : Extension of Maintenance Bond for Mossy Oaks Plantation
INSPECTION REPORT
TO: Edwin S. Sanguyo, P.E.
Public Works/Engineering
FROM: Jerome Gibson
Public Works/Engineering
DATE: July 12, 2012
SUBJECT: Mossy Oak Subdivision Phase I
Warranty Inspection – 18 month period
The above project was inspected for compliance with approved plans and for
performance/wear during the 18 month warranty period.
DATE OF INSPECTION: July 12, 2012
INSPECTORS: Jerome Gibson/ P I, Tim Stanley/NRDMS, Rob
Vandenbroeck /RDOM, Clay Simmons, PE/RDM, Edwin Sanguyo PE/ED.
The following deficiencies were noted:
1. Please provide plans for the repair work to be performed along Kais. The asphalt
surface exhibits excessive wear, there are indications of base failure and the
curbing on the south/west side of the roadway has rolled away from the cross
slope. This roadway shall be repaired prior to the final acceptance and the
proposed repair method shall be provided for review prior to execution.
2. All rights-of-way, retention basins and easements shall be maintained/mowed
during the warranty period and prior to acceptance into the County’s permanent
maintenance system.
3. It appears the stop bars are not per plans. The approved plans call for the stop bars
to be 24” wide. All stop bars shall be repainted.
4. The concrete on the north side of inlet located on the south side of res # 1546 shall
be removed and replaced to match existing concrete on inlet.
5. All temporary silt fencing shall be removed from retention basins and along the
wood lines prior to final acceptance.
6. Replace the missing stormwater manhole lid located on the north side of retention
basin # 2. Also, replace missing grate on inlet located on the north side of Lena
Street.
7. The lifting holes inside of the inlets shall be filled with concrete.
Packet Pg. 238
8.6.1.a
Attachment: 18 Month Inspection Report Mossy Oak Plantation Phase 1 (1065 : Extension of Maintenance Bond for Mossy Oaks Plantation
8. Remove the lumber outside of chain link fence at retention basin # 2.
9. Replace concrete around inlets where cracking.
10. Remove/clip grass from all concrete curbing.
11. Install silt fence around the inlets adjacent to the cleared area on Lena Street and
where sediment is entering the roadway.
12. Remove the persimmon tree from retention basin on Lena Street and clean around
outfall pipe.
13. Remove and replace broken concrete around inlet on north side of Lena Street in
front of resident # 1568.
14. A road name sign (Dottie Street) shall be placed at the entrance (intersection of SR
4 and Dottie Street).The Street sign shall be 8” X 30”.
15. Replace the RPM reflectors on Dottie Street near the intersection of SR 4.
/jg
Packet Pg. 239
Packet Pg. 240
8.6.1.b
Attachment: Irrevocable Standby Letter of Credit No. 226 (1065 : Extension of Maintenance Bond for
Project Site
Aerial/Location Map
Mossy Oaks Plantation Phase 1
8.6.1.c
Packet Pg. 241
Attachment: Mossy Oaks Plantation Phase 1 Aerial Map (1065 : Extension of Maintenance Bond for Mossy Oaks Plantation Phase 1)
8.6.1.d
Packet Pg. 242
Attachment: Letter/request to extend the bond for Mossy Oaks Plantation Ph 1 (1065 : Extension of Maintenance Bond for Mossy Oaks
8.6.2
BOARD OF COUNTY COMMISSIONERS
AGENDA
