Okaloosa County BOCC — January 30, 2013 — Lord Son Contract on Shalimar Annex with Exhibits — reading text
Part 10 of 10. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — 54-Lord Son Contract on Shalimar Annex with Exhibits.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
FOOTAGE REQUIREMENTS
Tax Collector 13,000 sq. ft.
Property Appraiser 12,400 sq. ft.
County Administration 10,000 sq. ft.
County Administrator
Board of County Commissioners
Board Meeting Room
County Attorney
Supervisor of Elections 4,450 sq. ft.
Sheriff 10,800 sq. ft.
Facility Maintenance 500 sq. ft.
Court Facilities 15,000 sq. ft.
Renovations to involve internal modifications to support the functions of staff and update the buildings to
comply with all Federal, State and local codes. If required, all utilities must be modified to accommodate
equipment additions, restroom additions, storage, office space and all mechanical and electrical
equipment; this includes the current switch gear (not including the generator transfer switch) wiring,
plumbing replacements. All HVAC equipment is to be replaced. A new energy efficient system is to be
installed. The system New Chiller with Turbcor motor estimated 140-160 tons will need to include a high-
efficiency multi-stage 4-pipe boiler with hot and chilled water pumps and a complete recirculating system.
The completed systems will include thermostatically controlled dampers, hot water reheat VAV boxes,
and HVAC control systems. There will need to be 3 or 4 Liebert A/C units in the server closets. Those
units will need to be 3-5 ton units that are size appropriate for the heat load produced in the server
closets.
Modification/Replacement of the Building Safety System, including the fire sprinkler system and Fire
Alarm System is required and is to be included.
Replace any windows or doors that are not in compliance with the local area wind load requirements.
The entire complex is required to be ADA compliant.
External renovations including transportation drop off/pick determination and signage are to be included.
Internal signage and direction signage is to be included.
Field measurements of all existing space and analyze space for any limitations including analysis of
structural components, window/door locations, handicap accessibility, parking considerations, plumbing
services, electrical services, HVAC requirements and building system accessibility.
Meet with each department/constitutional office which will occupy the remodeled complex to determine
size and number of offices required.
There are (2) portable buildings located in a courtyard between Building “G” and “C’. They are to remain
in their location with utilities connected.
Roofing on all buildings will be torn off, decking replaced as needed and new roofing installed. (Exception:
Building “G” and “E” will not be re-roofed). The required roofing system is to be a Styrene-Butadiene-
Styrene (SBS) modified bituminous membrane system with roofing insulation. System must have a 20-
year warranty (from date of substantial completion; Roofers installation warranty shall be for 2 years from
substantial completion.
AQF
A.2.5
Structural (limited, if needed)
Electrical
Mechanical, Plumbing
Landscape Architecture
A.2.6
Judicial Design Consultant
Security Planning
Associate Architect
EXHIBIT BB
Consultants
TBD
Humber-Garick Consulting Engineers
142 Eglin Parkway, SE
Fort Walton Beach, FL 32548-5545
David H. Melvin, Inc.
Consulting Engineers
P.O. Box 840
Marianna, FL 32447
Horton Land Works
4151 Commons Drive West, #5413
Destin, FL 32541
DLR Group
100 East Pine Street, Suite 404
Orlando, FL. 32801
Stokes Architectural, Inc.
9 Miracle Strip Pkwy., SW
Fort Walton Beach, FL 32548