Okaloosa County BOCC — January 30, 2013 — Lord Son Contract on Shalimar Annex with Exhibits — reading text
Part 1 of 10. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — 54-Lord Son Contract on Shalimar Annex with Exhibits.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
BATA Document A133" — 2009
Standard Form of Agreement Between Owner and Construction Manager as _
Constructor where the basis of payment is the Cost of the Work Plus a Fee with a Guaranteed
Maximum Price
16th, BCC approval
AGREEMENT made as of the 9th-day of October in the year 2012
{In words, indicate day, month and year)
BETWEEN the Owner:
(Name, legal status and address)
Okaloosa County Board of County Commissioners
1804 Lewis Turner Blvd, Suite 100
Fort Walton Beach, FL 32547
and the Construction Manager:
(Name, legal status and address}
Lord & Son Construction, Inc.
19 David Street
Fort Walton Beach, FL 32547
for the following Project:
{Name and address or location)
Shalimar Courthouse Annex Renovations
1250 Eglin Parkway
Shalimar, FL 32579
The Architect:
(Name, legal status and address)
DAG Architects Inc.
1223 Airport Road
Destin, FL 32541
The Owner's Designated Representative:
(Name, address and other information)
Don Amunds
1804 Lewis Turner Blvd, Suite 100
Fort Walton Beach, FL 32547
Telephone Number: 850.651.7105
Fax Number: 850.651.7142
ADDITIONS AND DELETIONS:
The author of this document has
added information neaded for its
completion, The author may aiso
have ravised the text of the original
AIA standard form. An Additions and
Oeiefions Report that notes added
information es well as ravisions to the
standard form text is availabie from
the author and shoutd be reviewed. A
vertical line In the left margin of this
document indicates where the author
has added necessary information
end where the author has added to or
deleted from the original AIA text.
This document has important legal
consequences, Consuftation with an
attomey is encouraged with respect
fo ifs completion or modification.
AIA Document A201™-2007,
General Conditions of the Contract
for Construction, is adopted in this
document by reference. Do not use
with other generat conditions unless
this document Is modified.
| Email Address: damunds@co.ckaloosa.fl.us
The Construction Manager's Designated Representative:
(Name, address and other information)
AIA Document A123 ~ 2009 (formerly A121™CMic ~ 2003}. Copyright © 1891, 2003 and 2009 by The Amancan Inattute of Architects. All rights: reserved,
init, = WARNING: Thie AIA® Oocument is protected by U.S. Copyright Law and inter ai Tr Unauth rapr of distribution of this AlA
Document, o7 any portion of #t, may result in severe civil and criminal penatties, and will be prosecuted to the maximum extent poseible uncer the law.
1 This documant was produced by AIA software et 96:04:11 on 10/19/2012 under Order No.5062324330_1 which expires an 01/16/20 13, and ia nottor resale.
User Notes: (1482324325)
pte
ink.
Spike Lord
19 David Street
Fort Walton Beach, FL 32457
Telephone Number: 850.863.5158
Fax Number: 850.862.4904
Mobile Number:850.259.9591 ——_
Email Address: spike@lordandson.com
The Architect's Designated Representative:
(Name, address and other information)
Pat Ballasch
1223 Airport Road
Destin, FL 32541
Telephone Number: 850.837.8152
Fax Number: 8$0,654.4276
Mobile Number: 850.217.4970
Email Address: pballasch@dagarchitects.com
The Owner and Construction Manager agree as follows.
AlA Document A13$™ ~ 2008 {formerly A217 CMe = 2003). Copyright © 1991, 2003 and 2009 by The Amarican institute of Architects. All rights reserved.
WARNING: Thia AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this ALA 2
Document, o7 sny portion of It, may reek in severe civil and crimbrad a
m extant posalble under te law.
This document was produced by AIA software at 16:04:11 on 10/45/2012 under Order No.6002324330_1 which expires an 01/16/2043, and is not for resale.
‘Uaor Notes:
(1482324325)
Ao
Inf.
TABLE OF ARTICLES
1 GENERAL PROVISIONS
2 __ CONSTRUCTION MANAGER'S RESPONSIBILITIES
3 _—sOWNER'S RESPONSIBILITIES
4 _ COMPENSATION AND PAYIENTS FOR PRECONSTRUCTION PHASE SERVICES
5 _ COMPENSATION FOR CONSTRUCTION PHASE SERVICES
6 COST OF THE WORK FOR CONSTRUCTION PHASE
7 _ PAYMENTS FOR CONSTRUCTION PHASE SERVICES
8 _ {NSURANCE AND BONDS
9 DISPUTE RESOLUTION
10 TERMINATION OR SUSPENSION
41 ‘MISCELLANEOUS PROVISIONS
42 SCOPE OF THE AGREEMENT
ARTICLE 1 GENERAL PROVISIONS
§ 1.1 The Contract Documents
The Contract Documents consist of this Agreement, Conditions of the Contract (General, Supplementary and other
Conditions), Drawings, Specifications, Addenda issued prior to the execution of this Agreement, other documents
listed in this Agreement, and Modifications issued after execution of this Agreement, all of which form the Contract
and areas fully a part of the Contract as ifattached to this Agreement or repeated herein. Upon the Owner's acceptance
of the Construction Manager’s Guaranteed Maximum Price proposal, the Contract Documents will also include the
documents described in Section 2.2.3 and identified in the Guaranteed Maximum Price Amendment and revisions
prepared by the Architect and furnished by the Owner as described in Section 2.2.8, The Contract represents the entire
and integrated agreement between the parties hereto and supersedes prior negotiations, representations or agreements,
either written or oral. If anything in the other Contract Documents, other than a Modification, is inconsistent with this
Agreement, this Agreement shall govern.
§ 1.2 Relationship of the Parties
The Construction Manager accepts the relationship of trust and confidence established by this Agreement and
covenants with the Owner to cooperate with the Architect and exercise the Construction Manager’s skill and judgment
in furthering the interests of the Owner; to furnish efficient construction administration, management seryices and
" supervision; to furnish at all times an adequate supply of workers and materials; and to perform the Work in an
expeditious and economical manner consistent with the Owner’s interests. The Owner agrees to furnish or approve, in
atimely manner, information required by the Construction Manager and to make payments to the Construction
Manager in accordance with the requirements of the Contract Documents,
§ 1.3 General Conditions
For the Preconstruction Phase, AIA Document A201™—2007, General Conditions of the Contract for Construction,
shall apply only as specifically provided in this Agreement. For the Construction Phase, the general conditions of the
contract shall be as set forth in A201-2007, which document is incorporated herein by reference. The term
"Contractor" as used in A201-2007 shall mean the Construction Manager.
ARTICLE 2. CONSTRUCTION MANAGER'S RESPONSIBILITIES
The Construction Manager’s Preconstruction Phase responsibilities are set forth in Sections 2.1 and 2.2. The
Construction Manager’s Construction Phase responsibilities are set forth in Section 2.3. The Owner and Construction
Aida Document A133™ — 2009 formerly A121™CMic - 2003}. Copyright © 1981, 2003 and 2006 by The American Inatitute of Architects. All rights raserved.
WARNING: This AIA® Document ie protected by U.S. Copyright Lew and International Treaties. Unauthorized reproduction or distribution of this aua®
Document, or any portion of it, may result in severe clvil end criminal penalties, and will be prosecuted to the maximum extent possible under the law.
This document wes produced by AIA software at 16:04:11 on 10/16/2012 under Order No.5002324330_1 which expires on 01/16/2013, and is not for resale.
User Notes: {1462324325}
3
Manager may agree, in consultation with the Architect, for the Construction Phase to commence prior to completion of
the Preconstruction Phase, in which case, both phases will proceed concurrently. The Construction Manager shall
identify a representative authorized to act on behalf of the Construction Manager with respect to the Project.
§ 2.1 Preconstruction Phase
§ 2.1.1 The Canistriction Manager shall provide a preliminary evaluation of the Owner's program, schedule and
construction budget requirements, each in terms of the other.
§ 2.1.2 Consultation
The Construction Manager shall schcdule and conduct mectings with the Architect and Owner to discuss such matters
as procedures, progress, coordination, and scheduling of the Work. The Construction Manager shall advise the Owner
and the Architect on proposed site use and improvements, selection of materials, and building systems and equipment.
The Construction Manager shall also provide recommendations consistent with the Project requirements to the Owner
and Architect on constructability; availability of materials and labor; time requirements for procurement, installation
and construction; and factors related to construction cost including, but not limited to, costs of alternative designs or
materials, preliminary budgets, life-cycle data, and possible cost reductions.
§ 2.1.3 When Project requirements in Section 3.1.1 have been sufficiently identified, the Construction Manager shall
prepare and periodically update a Project schedule for the Owner's acceptance. The Construction Manager shall obtain
the Architect’s approval for the portion of the Project schedule relating to the performance of the Architect's services.
The Project schedule shali coordinate and integrate the Construction Manager's services, the Architect's services,
other Owner consultants’ services, and the Owner's responsibilities and identify items that could affect the Project’s
timely completion. The updated Project schedule shal! include the following: submission of the Guaranteed Maximum
Price proposal; components of the Work; times of commencement and completion required of each Subcontractor;
ordering and delivery of products, including those that must be ordered well in advance of construction; and the
occupancy requirements of the Owner.
§ 2.1.4 Phased Construction
The Construction Manager shall provide recommendations with regard to accelerated or fast-track scheduling,
procurement, or phased construction. The Construction Manager shall take into consideration cost reductions, cost
information, constructability, provisions for temporary facilities and procurement and construction scheduling issues.
§ 2.1.5 Preliminary Cost Estimates
§ 2.1.5.4 Based on the preliminary design and other design criteria prepared by the Architect, the Construction
Manager shall prepare preliminary estimates of the Cost of the Work or the cost of program requirements using area,
volume or similar conceptual estimating techniques for the Owner’s approval. If the Architect or Construction
Manager suggests alternative materials and systems, the Construction Manager shall provide cost evaluations of those
alternative materials and systems.
§ 2.1.8.2 As the Architect progresses with the preparation of the Schematic Design, Design Development and
Construction Documents, the Construction Manager shall preparc and update, at appropriate intervals agreed to by the
Owner, Construction Manager and Architect, estimates of the Cost of the Work of increasing detail and refinement
and allowing for the further development of the design until such time as the Owner and Construction Manager agree _
~ gw W Guaranteed Maximum Price for the Work. Such estimates shall be provided for the Owner’s approval. The
Construction Manager shall inform the Owner and Architect when estimates of the Cost of the Work exceed the latest
approved Project budget and make recommendations for corrective action.
§ 2.1.6 Subcontractors and Suppllers
The Construction Manager shall develop bidders’ interest in the Project.
§ 2.4.7 The Construction Manager shall prepare, for the Architect's review and the Owner’s acceptance, a
procurement schedule for items that must be ordered well in advance of construction. The Construction Manager shall
expedite and coordinate the ordering and delivery of materials that must be ordered well in advance of construction. If
the Qwner agrees to procure any items prior to the establishment of the Guaranteed