READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — May 17, 2013 — Procurement Manual PROPOSED Transit Language 4-22-13 — reading text
Part 3 of 17. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — 55-Procurement Manual PROPOSED Transit Language 4-22-13.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
or extension thereof, to
the responsible bidder whose bid, conforming to the invitation for bids, is the
lowest bidder. Awards given to the “other than lowest bidder” are addressed
in a succeeding section in this document.
g. Cancellation of Invitations Before Opening - the BCC will include in all
solicitations for invitations for bid, a statement that the BCC reserves that right
to cancel the solicitation without penalty, at its sole discretion.
h. Modification or Withdrawal of Bids - Bids may be modified or withdrawn in
writing, by telegraphic, by telecommunication, by facsimile, or by electronic
mail. Modifications or withdrawals must be received by the BCC no later than
the exact time set for opening of bids.
i. Rejection of All Bids - the BCC recognizes that the preservation of the integrity
of the competitive bid system indicates that after bids have been opened, award
must be made to that responsible bidder who submitted the lowest responsive
bid, or in the case of a sale, to that responsible bidder who made the highest
responsive bid. Every effort will be made to anticipate changes in a requirement
prior to the date of opening and to notify all prospective bidders of any resulting
modification or cancellation, thereby preventing the unnecessary exposure of bid
prices.
j. Rejection of Individual Bids - Any bid which fails to conform to the essential
requirements or specifications of the invitation for bids will be rejected, unless
the invitation authorized the submission of alternate bids. Alternate bids must
meet the requirements specified in the invitation.
The originals of all rejected bids, and any written findings with respect to such
rejection, will be preserved in the contract file.
k. Disposition of Late Bids - Late bids which are not considered for award will be
held unopened until after award, and then returned to the bidder, unless other
9
FTA PROVISIONS, CERTIFICATIONS, REPORTS, FORMS AND OTHERS
disposition is requested, or agreed to by the bidder. An unidentified bid however
may be opened solely for the purpose of identification.
l. Minor Informalities or Irregularities in Bids - A minor informality is one which
is merely a matter of form, or is some immaterial variation from the exact
requirements of the invitation for bids, having no effect or merely a trivial or
negligible effect on the price, quantity, quality, or delivery of the supplies or
performance of the services being procured, and the correction or waiver of
which would not affect the relative standing of, or be otherwise prejudicial to
other bidders. The Purchasing Director will either give the bidder an opportunity
to correct the deficiency, or waive any such deficiency, where it is to the BCC’s
advantage.
m. Mistakes in Bids - After opening of bids, the Purchasing Director will examine
all bids for mistakes. In cases of apparent mistakes, and in cases where there is
reason to believe that a mistake may have been made, he/she will request from
the bidder a verification of the bid, calling attention to the suspected mistake. If
the bidder alleges a mistake, the matter will be processed in the manner set forth
below.
n. Change Order Policy - Changes to contract agreements after the award is
announced must be approved by the Purchasing Director. All change orders must
be documented in writing, is supported by a written justification, including a cost
or price analysis, and signed and dated by the authorized officials.
3 Request for Proposals (RFP)
Large purchases may be procured through competitive proposal/request for
proposals, when conditions are not appropriate for the use of sealed bids. In such
cases, either a fixed price, or cost reimbursement type contract is awarded.
a. Publicizing the Proposal: Proposals will be advertised in the newspaper with the
largest circulation within Okaloosa County, as well as solicitation from an
adequate number of qualified sources.
b. Selection Criteria - the BCC will list, in the request for proposals, the selection
criteria. Price should always be a selection criterion.
the BCC may list selection criteria in the request for proposals, in order of
priority with weights, if any. This is the preferred method, because if it is not
done, the BCC must establish the priority, weights and scoring method on an
internal document prior to the day the RFP becomes available to potential
proposers.
c. Evaluation of Proposals - Criteria for evaluation of proposals will be established
prior to a request for proposals, and may include:
10
FTA PROVISIONS, CERTIFICATIONS, REPORTS, FORMS AND OTHERS
¾ Responsibility criteria, such as financial, human, and physical capabilities to
perform the contract. (Refer to section 5.1 Best Practices Procurement
Manual - Responsibility of Contractor).
¾ Technical criteria - may include the technical experience of the proposer, the
suitability of the products or methods proposed for the BCC’s needs, or
objective performance criteria (fuel efficiency, percent savings guaranteed,
proven ridership increases, etc.).
¾ Price criteria - price must be evaluated, unless the Brooks Act and Florida
State Statues apply (where price is only considered after the most qualified
proposer is selected for procurement of A&E services). Awards will be made
to the responsible firm whose proposal is most advantageous to the BCC’s
program, with price and other factors considered.
¾ Compliance criteria - will include responsiveness to proposal requirements.
¾ Management criteria - may include the qualifications of the project
managers, the budget and schedule performance proposed and recorded on
past projects, and the projected effectiveness of the management plan
proposed.
d. Award of Proposals - the BCC will make awards only to responsible contractors
possessing the ability to perform successfully under the terms and conditions of
the proposed agreement. Consideration will be given to such factors as
contractor integrity, compliance with public policy, record of past performance,
and financial and technical resources. Additionally, as stated above, awards will
be made to the responsible firm whose proposal is most advantageous to the
BCC’s program with price and other factors considered.
e. Request for Revised Proposals - In the event the BCC finds it necessary to
revise an initial request for proposal because of deficiencies, the decision to do
so will be approved by the Purchasing Director, and the deficiencies must be
listed and explained.
¾ A complete revised proposal, including price (except under the Brooks Act)
will be requested from each offeror in the competitive range.
¾ Unless explicitly stated otherwise, the revised offer extinguishes the prior
offer.
¾ The proposer should identify all changes in the revised offer.
the BCC may exercise the right to request revised proposals as many times as
necessary in order to obtain the most advantageous offer.
f. Discussions and Clarifications (negotiations) - the BCC will exercise its right to
hold discussions for clarifications with all offerors in the competitive range. At
such time, negotiations and bargaining may be made. At which time, the offeror
will have an opportunity to revise or modify his/her proposal. The discussions
and negotiations may initially be written or oral, with appropriate documentation
following the discussions. Strict confidentiality in such cases will be maintained.
Emphasis will be made known to the offeror that the name and number of
proposals received is not normally considered a public record and need not be
released to competitors or the public at large.
11
FTA PROVISIONS, CERTIFICATIONS, REPORTS, FORMS AND OTHERS
g. Award Based on Initial Proposals - the BCC may accept one of the initial
proposals if it can be demonstrated that acceptance of the most favorable initial
proposal without discussion will result in a fair and reasonable price.
Solicitations for proposals will contain a notice that award may be made without
discussion of proposals received, and that proposals should be submitted initially
on the most favorable terms possible, from a price and technical standpoint.
h. Withdrawal of Proposal - In order to avoid frivolous offers, or offers submitted
with the sole intention of casting light on other offers, the solicitation for the
request for proposals will state a date and time by which offers must be
submitted, and a period following that date during which offers remain firm.
Proposers will be allowed to withdraw or modify their proposals up to the time
due. However, it will also be stated that after that date all proposals are firm and
cannot be withdrawn, regardless of whether the proposer has had second
thoughts.
i. Debriefing Unsuccessful Offerors - the BCC will maintain complete records on
its award decision, and how it came to that decision. the BCC will remain as
objective as possible in making that decision. In the event a proposer was
excluded from competitive range, and requests a debriefing, the Purchasing
Director, at his/her discretion will offer a candid explanation of the process.
However, if the BCC foresees that a dispute is probable, it is not required to
notify or debrief unsuccessful offerors.
4 Procurement of Architectural and Engineering Services (A&E)
When procuring architectural, engineering, or related services, the BCC will use
competitive proposal procedures based on the Brooks Act, as defined in 40 U.S.C.
§541 and Florida Statute 287.055. Other types of services considered A&E services
include program management, construction management, feasibility studies,
preliminary engineering, design, surveying, mapping, and services which require
performance by a registered or licensed architect or engineer. Provided a sufficient
number of qualified firms are eligible to compete for the third party contract, the
contractor’s geographic location may be a selection criterion.
5 Procurement by Noncompetitive Proposals (Sole Source)
Sole source procurements are procurements accomplished through solicitation or
acceptance of a proposal from only one source, or after solicitation of a number of
sources, competition is determined inadequate. A contract amendment or change
order that is not within the scope of the original contract is also considered a sole
source procurement that must comply with the guidelines below. The Purchasing
Director must negotiate sole source procurements.
12
FTA PROVISIONS, CERTIFICATIONS, REPORTS, FORMS AND OTHERS
a. General Guidelines for Sole Source Procurements
Procurement by noncompetitive proposals may be used when the award of a
contract is infeasible under small purchase procedures, sealed bids, or
competitive proposals and at least one of the following circumstances applies:
¾ The item is available only from a single source (i.e. utility services, checking
prior procurements for the same or similar items, no identical or compatible
parts or equipment available from any other source);
¾ The public exigency or emergency for the requirement will not permit a
delay resulting from competitive
