READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — May 17, 2013 — Procurement Manual PROPOSED Transit Language 4-22-13 — reading text
Part 10 of 17. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — 55-Procurement Manual PROPOSED Transit Language 4-22-13.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
[ninety
(90)] days after the bid opening without the written consent of (Recipient), shall refuse or be unable to enter into this
Contract, as provided above, or refuse or be unable to furnish adequate and acceptable Performance Bonds and Labor
and Material Payments Bonds, as provided above, or refuse or be unable to furnish adequate and acceptable insurance,
as provided above, he shall forfeit his bid security to the extent of (Recipient's) damages occasioned by such
withdrawal, or refusal, or inability to enter into an agreement, or provide adequate security therefor.
It is further understood and agreed that to the extent the defaulting bidder's Bid Bond, Certified Check, Cashier's
Check, Treasurer's Check, and/or Official Bank Check (excluding any income generated thereby which has been
retained by (Recipient) as provided in [Item x "Bid Security" of the Instructions to Bidders]) shall prove inadequate to
fully recompense (Recipient) for the damages occasioned by default, then the undersigned bidder agrees to indemnify
(Recipient) and pay over to (Recipient) the difference between the bid security and (Recipient's) total damages, so as to
make (Recipient) whole.
The undersigned understands that any material alteration of any of the above or any of the material contained on this
form, other than that requested, will render the bid unresponsive.
Performance and Payment Bonding Requirements (Construction)
The Contractor shall be required to obtain performance and payment bonds as follows:
(a) Performance bonds
56
FTA PROVISIONS, CERTIFICATIONS, REPORTS, FORMS AND OTHERS
1. The penal amount of performance bonds shall be 100 percent of the original contract price, unless the (Recipient)
determines that a lesser amount would be adequate for the protection of the (Recipient).
2. The (Recipient) may require additional performance bond protection when a contract price is increased. The
increase in protection shall generally equal 100 percent of the increase in contract price. The (Recipient) may secure
additional protection by directing the Contractor to increase the penal amount of the existing bond or to obtain an
additional bond.
(b) Payment bonds
1. The penal amount of the payment bonds shall equal:
(i) Fifty percent of the contract price if the contract price is not more than $1 million.
(ii) Forty percent of the contract price if the contract price is more than $1 million but not more than $5 million; or
(iii) Two and one half million if the contract price is more than $5 million.
2. If the original contract price is $5 million or less, the (Recipient) may require additional protection as required by
subparagraph 1 if the contract price is increased.
Performance and Payment Bonding Requirements (Non-Construction)
The Contractor may be required to obtain performance and payment bonds when necessary to protect the (Recipient's)
interest.
(a) The following situations may warrant a performance bond:
1. (Recipient) property or funds are to be provided to the contractor for use in performing the contract or as partial
compensation (as in retention of salvaged material).
2. A contractor sells assets to or merges with another concern, and the (Recipient), after recognizing the latter concern
as the successor in interest, desires assurance that it is financially capable.
3. Substantial progress payments are made before delivery of end items starts.
4. Contracts are for dismantling, demolition, or removal of improvements.
(b) When it is determined that a performance bond is required, the Contractor shall be required to obtain performance
bonds as follows:
1. The penal amount of performance bonds shall be 100 percent of the original contract price, unless the (Recipient)
determines that a lesser amount would be adequate for the protection of the (Recipient).
2. The (Recipient) may require additional performance bond protection when a contract price is increased. The
increase in protection shall generally equal 100 percent of the increase in contract price. The (Recipient) may secure
additional protection by directing the Contractor to increase the penal amount of the existing bond or to obtain an
additional bond.
(c) A payment bond is required only when a performance bond is required, and if the use of payment bond is in the
(Recipient's) interest.
57
FTA PROVISIONS, CERTIFICATIONS, REPORTS, FORMS AND OTHERS
(d) When it is determined that a payment bond is required, the Contractor shall be required to obtain payment bonds as
follows:
1. The penal amount of payment bonds shall equal:
(i) Fifty percent of the contract price if the contract price is not more than $1 million;
(ii) Forty percent of the contract price if the contract price is more than $1 million but not more than $5 million; or
(iii) Two and one half million if the contract price is increased.
Advance Payment Bonding Requirements
The Contractor may be required to obtain an advance payment bond if the contract contains an advance payment
provision and a performance bond is not furnished. The (recipient) shall determine the amount of the advance payment
bond necessary to protect the (Recipient).
Patent Infringement Bonding Requirements (Patent Indemnity)
The Contractor may be required to obtain a patent indemnity bond if a performance bond is not furnished and the
financial responsibility of the Contractor is unknown or doubtful. The (recipient) shall determine the amount of the
patent indemnity to protect the (Recipient).
Warranty of the Work and Maintenance Bonds
1. The Contractor warrants to (Recipient), the Architect and/or Engineer that all materials and equipment furnished
under this Contract will be of highest quality and new unless otherwise specified by (Recipient), free from faults and
defects and in conformance with the Contract Documents. All work not so conforming to these standards shall be
considered defective. If required by the [Project Manager], the Contractor shall furnish satisfactory evidence as to the
kind and quality of materials and equipment.
2. The Work furnished must be of first quality and the workmanship must be the best obtainable in the various trades.
The Work must be of safe, substantial and durable construction in all respects. The Contractor hereby guarantees the
Work against defective materials or faulty workmanship for a minimum period of one (1) year after Final Payment by
(Recipient) and shall replace or repair any defective materials or equipment or faulty workmanship during the period of
the guarantee at no cost to (Recipient). As additional security for these guarantees, the Contractor shall, prior to the
release of Final Payment [as provided in Item X below], furnish separate Maintenance (or Guarantee) Bonds in form
acceptable to (Recipient) written by the same corporate surety that provides the Performance Bond and Labor and
Material Payment Bond for this Contract. These bonds shall secure the Contractor's obligation to replace or repair
defective materials and faulty workmanship for a minimum period of one (1) year after Final Payment and shall be
written in an amount equal to ONE HUNDRED PERCENT (100%) of the CONTRACT SUM, as adjusted (if at all).
CLEAN AIR
42 U.S.C. 7401 et seq
40 CFR 15.61
49 CFR Part 18
58
APPENDIX A
FTA PROVISIONS, CERTIFICATIONS, REPORTS, FORMS AND OTHERS
Applicability to Contracts
The Clean Air requirements apply to all contracts exceeding $100,000, including indefinite quantities where the
amount is expected to exceed $100,000 in any year.
Flow Down
The Clean Air requirements flow down to all subcontracts which exceed $100,000.
Model Clauses/Language
No specific language is required. FTA has proposed the following language.
Clean Air - (1) The Contractor agrees to comply with all applicable standards, orders or regulations issued pursuant to
the Clean Air Act, as amended, 42 U.S.C. §§ 7401 et seq. The Contractor agrees to report each violation to the
Purchaser and understands and agrees that the
Purchaser will, in turn, report each violation as required to assure notification to FTA and the appropriate EPA
Regional Office.
(2) The Contractor also agrees to include these requirements in each subcontract exceeding $100,000 financed in whole
or in part with Federal assistance provided by FTA.
RECYCLED PRODUCTS
42 U.S.C. 6962
40 CFR Part 247
Executive Order 12873
Applicability to Contracts
The Recycled Products requirements apply to all contracts for items designated by the EPA, when the purchaser or
contractor procures $10,000 or more of one of these items during the fiscal year, or has procured $10,000 or more of
such items in the previous fiscal year, using Federal funds. New requirements for "recovered materials" will become
effective May 1, 1996. These new regulations apply to all procurement actions involving items designated by the EPA,
where the procuring agency purchases $10,000 or more of one of these items in a fiscal year, or when the cost of such
items purchased during the previous fiscal year was $10,000.
Flow Down
These requirements flow down to all to all contractor and subcontractor tiers.
Model Clause/Language
No specific clause is mandated, but FTA has developed the following language.
Recovered Materials - The contractor agrees to comply with all the requirements of Section 6002 of the Resource
Conservation and Recovery Act (RCRA), as amended (42 U.S.C. 6962), including but not limited to the regulatory
provisions of 40 CFR Part 247, and Executive Order 12873, as they apply to the procurement of the items designated in
Subpart B of 40 CFR Part 247.
DAVIS-BACON AND COPELAND ANTI-KICKBACK ACTS
Background and Application
59
FTA PROVISIONS, CERTIFICATIONS, REPORTS, FORMS AND OTHERS
The Davis-Bacon and Copeland Acts are codified at 40 USC 3141, et seq. and 18 USC 874. The Acts apply to grantee
construction contracts and subcontracts that “at least partly are financed by a loan or grant from the Federal
Government.” 40 USC 3145(a), 29 CFR 5.2(h), 49 CFR 18.36(i)(5). The Acts apply to any construction contract over
$2,000. 40 USC 3142(a), 29 CFR 5.5(a). ‘Construction,’ for purposes of the Acts, includes “actual construction,
alteration and/or repair, including painting and decorating.” 29 CFR 5.5(a). The requirements of both Acts are
incorporated into a single clause (see 29 CFR 3.11) enumerated at 29 CFR 5.5(a) and reproduced below.
The clause language is drawn directly from 29 CFR 5.5(a) and any deviation from the model clause below should be
coordinated with counsel to ensure the Acts’ requirements are satisfied.
Clause Language
Davis-Bacon and Copeland Anti-Kickback Acts
(1) Minimum wages - (i) All laborers and mechanics employed or working upon the site of the work (or under the
United States Housing Act of 1937 or under the Housing Act of 1949 in the construction or development of the
project), will be paid unconditionally and not less often than once a week, and without subsequent deduction or rebate
on any account (except such payroll deductions as are permitted by regulations issued by the Secretary of Labor under