Okaloosa County BOCC — September 20, 2016 — Legislative Priorities List 2017 Draft — reading text
Part 1 of 2. These parts divide the reading text for browsing; they are not the source document's page numbers.
Legislative Priorities List 2017 Draft — extracted reading text
Machine-extracted OCR text · Review label: Known limitations
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
Proposed Legislative Priorities 2017
TOPIC STATEMENT or ADDITIONAL NOTES & BACKGROUND COST
PROJECT
PROJECTS
Funding P.J. Adams Parkway, P.J. Adams Parkway is a highly utilized county roadway along the southwest $10,500,000
Segments 3 & 4 border of Crestview, FL. A dense concentration of houses accessed by the
Construction Funding existing two-lane roadway has rendered the roadway deficient in capacity.
Okaloosa County, in partnership with FDOT District 3, has completed the
PD&E for the four lane expansion of the full roadway (From SR 85 to Hwy 90),
is performing the design from SR 85 to I-10, is acquiring right-of-way from SR
85 to I-10, and has construction funded for the first two segments of the project
(from SR 85 to Ashley Dr). With FDOT performing a PD&E for a potential
interchange with I-10 along this segment, the need to construct the four lane
project from SR 85 to the interstate is high.
Funding FIM Boulevard Extension Located as an enclave within the boundaries of Eglin Air Force Base, a 40 acre $400,000
tract of industrial land is inadequately serviced by a dirt roadway. Okaloosa
County has worked with Eglin Air Force Base to obtain right-of-way that will
serve as an extension to FIM Boulevard and the design of the roadway is
ongoing. However funding for construction has yet to be identified. The
importance of this access road is that one of the County’s most rapidly growing
manufacturing businesses, G.S. Gelato, is located within this industrial area and
the limited access is raising concerns about the long term viability of the current
location. Development of the roadway will greatly enhance the potential for
business to thrive in the current location.
Funding Supplemental Reclaimed Project consists of constructing infrastructure to transmit up to 4 million gallons $5,000,000
Water Project per day of reclaimed water from Okaloosa County Water & Sewer’s wastewater
plant in Ft. Walton Beach to the City of Niceville and Eglin Air Force Base to
use for irrigation. Project will also increase the County’s effluent disposal
capacity. Proposed infrastructure consists of approximately 10 miles of 20”
pipe, 1 mile of 12” pipe, and equipment at the Arbennie Pritchett Water
Reclamation Facility. The Eglin Community Partnership Program ranks this as
one of the top projects in NW Florida, as evidenced by a Memo of
Understanding that was executed by Eglin AFB (General Harris), the County,
and the City of Niceville. In addition, the state categorizes reclaimed water as
Alternate Water Supply projects. This project meets both immediate and long-
term needs by re-using an available resource to keep our potable water supply
and environment sustainable. A $3M state appropriation was received from a
past funding cycle. The past funding will allow to get the project shovel ready
1
Proposed Legislative Priorities 2017
TOPIC STATEMENT or ADDITIONAL NOTES & BACKGROUND COST
PROJECT
(design, permitting, easement, and environmental), pay for construction of the
necessary plant facilities, and pay for a portion of the pipeline. This funding
request is for the remainder of the pipeline, which would finish the project. The
County can contribute labor and equipment to self-perform the project;
therefore, when it comes time to fill out the applications for water project
funding, we would request an amount less than $5M.
Funding West County Stormwater West of the main entrance to Hurlburt Field, runoff from the military $1,000,000
System Retrofit Analysis reservation flows across private property, US 98 and into the Santa Rosa Sound
through several public stormwater systems. Largely installed over 35 years ago,
the stormwater system is composed of corrugated metal pipe that is decaying to
the point of failure. In addition, development of the area surrounding the
system and runoff from Eglin Air Force Base has rendered many portions of the
stormwater systems inadequate. The request is to perform an in-depth analysis
of the overall drainage basins and conveyance pipes in the West County area in
order to develop improvement recommendations and construction documents
for improvements to mitigate flooding.
Funding Port Dixie Stormwater Located adjacent to Shalimar, FL, the Port Dixie area has a stormwater system $2,500,000
System Rehabilitation in significant need of repair. Corrugated Metal Pipes (CMP) installed in the
70’s and 80’s are experiencing regular failures. High groundwater table in
conjunction with regular flow from runoff has caused many of the pipes in the
area to deteriorate. Rehabilitation of the system can be accomplished with the
replacement of the failing CMP in favor of a smooth lined High Density
Polyethylene (HDPE) pipe. The new HDPE piping would significantly improve
ground stability along the pipe route, increase system efficiency and have a
service life of 50 years.
Funding Bob Sikes Industrial Park The Bob Sikes Industrial Park (BSIP) has seen significant growth from various $1,000,000
Lift Station & Force Main DOD support facilities supporting aircraft testing and
Upgrade modifications. Continuing to provide sufficient infrastructure is a necessity to
attract and continue to grow the BSIP, its partnership with the military, and
other industrial facilities. This project will have a significant economic impact,
as it will replace and upsize the primary wastewater pumping station and force
main (under the runway) to posture the industrial park to meet the future growth
needs of the region. The County can contribute labor and equipment to self-
perform the project; therefore, when it comes time to fill out the
applications for water project funding, we would request an amount less
than $1M.
2
Proposed Legislative Priorities 2017
TOPIC STATEMENT or ADDITIONAL NOTES & BACKGROUND COST
PROJECT
Funding Bob Sikes Water Project would expand the effluent disposal capacity from 0.38 million gallons $1,500,000
Reclamation Facility per day (MGD) to 1.117 MGD to match the permitted capacity of the water
Effluent Disposal reclamation facility, better posturing for economic growth at the Bob Sikes
Expansion Industrial Park and other areas of unincorporated Crestview, such as Hwy 90
East (Shoal River Ranch area) or areas north of Airport road. Project is already
designed and permitted by the Florida Department of Environmental Protection.
Funding Hwy 90 East Water & These water and sewer main extensions would help spur economic growth to $3,000,000
Sewer Mains (to Shoal Hwy 90 East. Estimate is for main extensions to the intersection of Hwy 90 and
River Ranch Area Jericho Road. Project could posture the county much better for a future
Industrial Park industrial park in the vicinity of Hwy 90 East, Interstate 10, and the CSX
railroad. The County can contribute labor and equipment to self-perform
the project; therefore, when it comes time to fill out the applications for
water project funding, we would request an amount less than $3M.
Funding Okaloosa County Built in 1955 the existing Courthouse in Crestview, FL was closed due to $2,000,000
Courthouse environmental concerns (mold and asbestos). Okaloosa County is developing
Reconstruction plans to remove the current structure and replace it with a new facility that will
serve as a landmark for downtown Crestview. The new courthouse will provide
adequate space to serve the needs of Okaloosa County for the next 50 years by
doubling the number of judicial suites and courtrooms previously available.
Funding will be utilized to help offset the project costs incurred by Okaloosa
County ($26,000,000 total project costs).